W3P88-0028, Monthly Operating Rept for Jan 1988

From kanterella
Revision as of 16:57, 10 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1988
ML20196D837
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/31/1988
From: Burski R, Geoffrey Miller
LOUISIANA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
W3P88-0028, W3P88-28, NUDOCS 8802180198
Download: ML20196D837 (7)


Text

. _ _ _ _ - -

~

e

.NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS

'dATERFORD 3 JANUAkY 1988 The unit started the month in a shutdown initiated in December 1987 and experienced one additional shutdown during the month.

i

$$Y

'/

,,,,gesu w; c y _,,_.

7,

' 6 ';

..g

/

m

/

'v.

0802180198 800131 h

[ PDR y*/

E ADOCK 05000302 Q_

DCD

t t

4 o PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES k'ATERFORD 3 During the month of January 1988, there were no pressurizer safety valve failures or challenges.

a N

r r

P-a I

g

t

~

OPERATING DATA REPORT f

UNIT NAME: WATERFORD 3 CITY / STATE: KILLONA/LA DATE: FEBRUARY 1988 OPERATING STATUS.

i

1. Docket: 50-382 g,t,,
2. Reportina Period: _ January 1988
3. Utility

Contact:

GEORGE MILLER i

Phone Number:

(504) 467-8211

4. Licensed Thermal Power (MWt): 3390
5. Nameplate Rating (Gross Mwe): 1153 1
6. Design Electrical Rating (Net MWe): 1104 i

t

7. Maximum Dependable Capacity (Gross MWe): 1120 1
8. Maximum Dependable Capacity (Net MWe): 1075
9. If Changes Occur in Capacity Ratint,s (Items Number 4 Throu8h 8) Since Last Report, l

1 Give Reasons:

4 10.

Power Level To WMch Restricted, if Any (Net MWe):

NONE i

11.

Reasons For Restrictions, If Any: N/A i

r 1

This Month Yr.-to-Date Cumulative r riod 744.0 744.0 20641.0 12.

Hours In Reporting

13. Number Of Hours ".er

,.or Was Critical 689.8 689.8 16794.4 f

i

14. Reactor Reser,e S' down Hours !

15 Hours Generator P.-Line 645.2 6A5.2 16459.6 I

16.

Unit Reserve 3 %tdown Hours !

[

i

ag i

OPERATING DATA REPORT (Continued)

I I

This Month Yr.-to-Date Cumulative r

17 Gross Thermal Energy 2,143,917 2,143,917 53,604.889 Generated (MWH) l

18. Gross Electrical Energy 723,320 723,320 18,104,130 Generated (MWH)
19. Net Electrical Energy 690,008 690,008 17,214,477 Generated (MWH)
20. Unit Service Tactor 86.7 86.7 79.7 I

t

21. Unit Availability Tactor 86.7

,86.7 79.7 l

22. Unit Capacity Tactor 86.3 86.3 77.6 f

(Using MDC Net)

23. Unit Capacity Tactor 84.0 84.0 75.5 f

l (Using DER Net) 24.

Unit Forced Outage Rate 7.9 7.9 7.8

25. Unit Forced Outage Hours 55.6 55.6 1391.9 26.

Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

Refueling / Maintenance Outage. 4/2/88. 60 days i

l 27.

If Shut Down At End of Report Period Estimated Date of Startupt

28. Units In Teat Status (Prior to Commercial Operation):

?

I Torecast Achieved j

t INITIAL CRITICALITY 3/4/85 t

f INITIAL ELECTRICITY 3/18/85 COMMERCIAL OPERATION 9/24/85 I

i; I

i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-382 UNIT WATERFORD 3 DATE FEBRUARY 1988 COMPLETED BY GEORGE MILLER TELEPHONE 504-467-8211 MONTH JANUARY 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1

-43 17 1106 2

34 18 1105 3

899 19 1102 4

1099 20 1105 5

1104 21 1103-6 1106 22 1105 7

-1106 23 1106 i

)

8 1105 24 1105 9

1105 25 1105 10 1105 26 455 11 1104 27

-40 12 1104 28 63 13 1105 29 880 14 1105 30 1101 15 1105 31 1104 16 1105 l

INSTRUCTIONS On this format, list the average daily unit power level in K4e-Net for each day in the reporting month. Compute to the nearest whole megawatt.

l l

1

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT FR JANUARY 1988 DOCKET NO 50-382 UNIT NAME' WATERFORD 3 DATE FEBRUARY 1988 COMPLETED BY-GEORGE MILLER TELEPHONE 504-467-8211 Method of Licensee

.Cause & Corrective Duration Shutting Event System Component Action to.

l Na.

Date Type (HOURS)

REASON 2 Down Reactor 3 Report #

Code

  • Code 5 Prevent Recurrence 87-12 871230 S

43.2 B

4 N/A AB STR Unit shutdown to change supply oil strainer on reactor coolant pump 2B.

88-01 880126 F

55.6 B

2 88-002 AB STR Unit shutdown to change supply oil strainer on reactor coolant pump 2B.

I 2

3 F: Forced Re son:

Method S: Scheduled A-Equipment Failure (Explain) 1-Maraal B-Maintenance or Test 2-Manual Scram.

C-Refueling 3-Automatic Scram.

D-Regulatory Restriction 4-Continuation 4

E-Operator Training &

5-Load Reduction IEEE Std. 805-1984 License Examination 9-Other 5

F-Administrative IEEE Std. 803A-1983 G-Operational Error (Explain)

H-Other (Explain)

\\

I LOUISIAN A / 3i7et:40nse staser. e.o. sox s0340 POWER & LIGHT NEW ORLEANS, LOUISIAN A 70160 (504)595 3100

$20NErsSEU February 12, 1988 W3P88-0028 A4.05 QA U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 l

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 MONTHLY OPERATING REPORT l

l

(

Enclosed is the subject monthly report which covers the operating statistics for the month of January 1988. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

l l

Very truly yours, R.F.

urski Nuclear Safety & Regulatory Affairs I

Acting Manager RFB:GEW:ssf Enclosure ec:

R.D. Martin, NRC Region IV NRC Resident Inspectors Office J.A. Calvo, NRC-NRR D.L. Wigginton, NRC-NRR INPO Records Center (J.T. Wheelock)

E.L. Blake W.M. Stevenson "AN EQUAL OPPORTUNITY EMPLOYER" Igl