.NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS
'dATERFORD 3 JANUAkY 1988 The unit started the month in a shutdown initiated in December 1987 and experienced one additional shutdown during the month.
i
$$Y
'/
,,,,gesu w; c y _,,_.
7,
' 6 ';
..g
/
m
/
'v.
0802180198 800131 h
[ PDR y*/
E ADOCK 05000302 Q_
t t
4 o PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES k'ATERFORD 3 During the month of January 1988, there were no pressurizer safety valve failures or challenges.
a N
r r
P-a I
g
t
~
OPERATING DATA REPORT f
UNIT NAME: WATERFORD 3 CITY / STATE: KILLONA/LA DATE: FEBRUARY 1988 OPERATING STATUS.
i
- 1. Docket: 50-382 g,t,,
- 2. Reportina Period: _ January 1988
- 3. Utility
Contact:
GEORGE MILLER i
Phone Number:
(504) 467-8211
- 4. Licensed Thermal Power (MWt): 3390
- 5. Nameplate Rating (Gross Mwe): 1153 1
- 6. Design Electrical Rating (Net MWe): 1104 i
t
- 7. Maximum Dependable Capacity (Gross MWe): 1120 1
- 8. Maximum Dependable Capacity (Net MWe): 1075
- 9. If Changes Occur in Capacity Ratint,s (Items Number 4 Throu8h 8) Since Last Report, l
1 Give Reasons:
4 10.
Power Level To WMch Restricted, if Any (Net MWe):
NONE i
11.
Reasons For Restrictions, If Any: N/A i
r 1
This Month Yr.-to-Date Cumulative r riod 744.0 744.0 20641.0 12.
Hours In Reporting
- 13. Number Of Hours ".er
,.or Was Critical 689.8 689.8 16794.4 f
i
- 14. Reactor Reser,e S' down Hours !
15 Hours Generator P.-Line 645.2 6A5.2 16459.6 I
16.
Unit Reserve 3 %tdown Hours !
[
i
ag i
OPERATING DATA REPORT (Continued)
I I
This Month Yr.-to-Date Cumulative r
17 Gross Thermal Energy 2,143,917 2,143,917 53,604.889 Generated (MWH) l
- 18. Gross Electrical Energy 723,320 723,320 18,104,130 Generated (MWH)
- 19. Net Electrical Energy 690,008 690,008 17,214,477 Generated (MWH)
- 20. Unit Service Tactor 86.7 86.7 79.7 I
t
- 21. Unit Availability Tactor 86.7
,86.7 79.7 l
- 22. Unit Capacity Tactor 86.3 86.3 77.6 f
(Using MDC Net)
- 23. Unit Capacity Tactor 84.0 84.0 75.5 f
l (Using DER Net) 24.
Unit Forced Outage Rate 7.9 7.9 7.8
- 25. Unit Forced Outage Hours 55.6 55.6 1391.9 26.
Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Refueling / Maintenance Outage. 4/2/88. 60 days i
l 27.
If Shut Down At End of Report Period Estimated Date of Startupt
- 28. Units In Teat Status (Prior to Commercial Operation):
?
I Torecast Achieved j
t INITIAL CRITICALITY 3/4/85 t
f INITIAL ELECTRICITY 3/18/85 COMMERCIAL OPERATION 9/24/85 I
i; I
i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-382 UNIT WATERFORD 3 DATE FEBRUARY 1988 COMPLETED BY GEORGE MILLER TELEPHONE 504-467-8211 MONTH JANUARY 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
-43 17 1106 2
34 18 1105 3
899 19 1102 4
1099 20 1105 5
1104 21 1103-6 1106 22 1105 7
-1106 23 1106 i
)
8 1105 24 1105 9
1105 25 1105 10 1105 26 455 11 1104 27
-40 12 1104 28 63 13 1105 29 880 14 1105 30 1101 15 1105 31 1104 16 1105 l
INSTRUCTIONS On this format, list the average daily unit power level in K4e-Net for each day in the reporting month. Compute to the nearest whole megawatt.
l l
1
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT FR JANUARY 1988 DOCKET NO 50-382 UNIT NAME' WATERFORD 3 DATE FEBRUARY 1988 COMPLETED BY-GEORGE MILLER TELEPHONE 504-467-8211 Method of Licensee
.Cause & Corrective Duration Shutting Event System Component Action to.
l Na.
Date Type (HOURS)
REASON 2 Down Reactor 3 Report #
Code
- Code 5 Prevent Recurrence 87-12 871230 S
43.2 B
4 N/A AB STR Unit shutdown to change supply oil strainer on reactor coolant pump 2B.
88-01 880126 F
55.6 B
2 88-002 AB STR Unit shutdown to change supply oil strainer on reactor coolant pump 2B.
I 2
3 F: Forced Re son:
Method S: Scheduled A-Equipment Failure (Explain) 1-Maraal B-Maintenance or Test 2-Manual Scram.
C-Refueling 3-Automatic Scram.
D-Regulatory Restriction 4-Continuation 4
E-Operator Training &
5-Load Reduction IEEE Std. 805-1984 License Examination 9-Other 5
F-Administrative IEEE Std. 803A-1983 G-Operational Error (Explain)
H-Other (Explain)
\\
I LOUISIAN A / 3i7et:40nse staser. e.o. sox s0340 POWER & LIGHT NEW ORLEANS, LOUISIAN A 70160 (504)595 3100
$20NErsSEU February 12, 1988 W3P88-0028 A4.05 QA U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 l
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 MONTHLY OPERATING REPORT l
l
(
Enclosed is the subject monthly report which covers the operating statistics for the month of January 1988. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
l l
Very truly yours, R.F.
urski Nuclear Safety & Regulatory Affairs I
Acting Manager RFB:GEW:ssf Enclosure ec:
R.D. Martin, NRC Region IV NRC Resident Inspectors Office J.A. Calvo, NRC-NRR D.L. Wigginton, NRC-NRR INPO Records Center (J.T. Wheelock)
E.L. Blake W.M. Stevenson "AN EQUAL OPPORTUNITY EMPLOYER" Igl