ML20199M383

From kanterella
Revision as of 03:43, 8 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Response to Regulatory Issue Summary (RIS) 2020-01, Preparation and Scheduling of Operator Licensing Examinations
ML20199M383
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/17/2020
From: Kura M
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-08137-MEK/LMW, RIS 2020-01
Download: ML20199M383 (3)


Text

RIS 2020-01 A member of STARS Alliance LLC Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek 102-08137-MEK/LMW July 17, 2020 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sir:

Reference:

NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations (February 19, 2020) [ML19357A038]

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Response to Regulatory Issue Summary (RIS) 2020-01, Preparation and Scheduling of Operator Licensing Examinations This letter provides Arizona Public Service Companys voluntary response to RIS 2020-01, Preparation and Scheduling of Operator Licensing Examinations. Enclosed with this letter is NRC Form 536, which provides the proposed schedule of operator licensing examinations at PVNGS for calendar years 2022 through 2025.

No commitments are being made to the NRC by this letter.

If you have any questions or require additional information, please contact Jarred J.

Shaver, Nuclear Training Section Leader, at (623) 393-4519.

Sincerely, Matthew E. Kura Department Leader, Regulatory Affairs, Compliance MEK/LMW

Enclosure:

NRC Form 536, Operator Licensing Examination Data cc:

G. E. Werner NRC Region IV, Chief, Operations Branch C. C. Osterholtz NRC Region IV, Chief Examiner J. A. Bridges NRC Region IV, Licensing Assistant, Operations Branch C. A. Peabody NRC Senior Resident Inspector for PVNGS Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: 623-393-5379 Kura, Matthew E(Z04774)

Digitally signed by Kura, Matthew E(Z04774)

DN: cn=Kura, Matthew E(Z04774)

Date: 2020.07.17 12:57:23 -07'00'

Enclosure NRC Form 536 Operator Licensing Examination Data

NRC FORM 536 (11-2017)

U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 11/30/2020 Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE CY CY CY CY CY CY CY NRC FORM 536 (11-2017)

Palo Verde Nuclear Generating Station 50-528, 50-529, 50-530 IV 2022 1

2023 1

2024 1

2025 1

2022 10 1

5 5/2/2022 2023 10 1

5 5/1/2023 2024 10 1

5 4/29/2024 2025 10 1

5 4/28/2025