Forwards Insp Repts 50-373/97-17OL & 50-373/97-17OL on 971020-24 & 980121-22 of Licensed Operator Requalification Program.No Violations Noted.Several Concerns Were Identified
ML20203K227
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 02/27/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20203K232 List:
References
50-373-97-17OL, 50-374-97-17OL, NUDOCS 9803050027
Download: ML20203K227 (3)


See also: IR 05000373/1997017

Text

_

-c-_

__,._&

gclo

u

-

}

i

-

q

February 27, 1998

E

Mr. Oliver D. Kingsley

_

President, Nuclear Generation Group

Commonwealth Edison Company

ATTN: Regulatory Services

Executive Towers West lli

=

1

1400 Opus Place, Suite 500

Downers Grove,IL 60515

SUBJECT:

NRC INSPECTION REPORTS 50-373/97017(OL); 50-374/970-17(OL)

LICENSED OPERATOR REQUAllFICATION PROGRAM EVALUATION

'

Dear Mr. Kingsley:

'

On February 3,1998, the NRC completed an inspection at your LaSalle CoJnty Generating

r

Station. The purpose of this inspection was to review the licensed operator requalification

=

program. Tha inspection included observation of certified evaluators and licensed operators

during administration of the annual operating requalification examination and observation of the

,

i

conduct of control room activities the week of October 20,1997. The annual written

requalification exan,ination was delayed a number of times until January 1998. An NRC

inspector observed administration of the annual written requalification examination

January 21 - 22,1998. Additionally, interviews were conducted with members of the operations

and training staffs. The enclosed report presents the results of the inspection.

-

The inspectors concluded that your control room operators demonstrated an appropriate level

of awareness to ensure safe and effective control of the plant and associated systems,

o

'

The inspectoir, concluded the licensed reactor operator and senior reactor operator

requalification programs were implemented in accordance with 10 CFR Part 55 requ:re nents.

Examination material and operator evaluations prepared and performed by your training s~taff

__

were, in general, considered satisfactory.

No violations of NRC requirements were identified; however, several concerns in your licensed

cnerator requalification training program were identified. These concerns are described within

the My of the report. In particular, the issues pertaining to not performing job performance

mcr.sures during requalification training, and the poor validation and coordination of simulator

job performance mensures have the potential to be detrirnental to effective lice'. sed coerator

evaluation.

Furthermore, during the requalificction examination on dynamic simulator scenarios, the

inspectors concluded that some operators displayed performance weaknesses. The inspectors

.

determined that command and control, use and familiarity of emergericy operating procedures,

(h

classification of emergencies, and three way communicctions were, at times, weak and needed

1

i

improvement.

! !

I?

r

g

g

v

040n91

Illll!llllll!!!01lillllyll

\\,

{

9803050027 980227

- **ga

1

.

-

G

.

t

_________ ___._ _.___ _ ___.__._._________ .

. . . . . . .

.

.

ld

I

.

.

O. Kingsley

?

February 27, 1998

The inspectors acknowledged that your staff was fairly new and that some immediate corrective

actions were made by the end of the inspection period. However, we encourage vour

continued efforts to enhance the training program and request that appropriate attention be

given to resolving these issues in a timely manner,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room (PDR),

We will gladly discuss any questions you have concerning this inspection,

Sincerely,

Original Signed by Geoffrey E. Grant

Geoffrey E. Grant, Director

Division of Reactor Projects

.

Docket Nos. 50,973; 50-374

License Nos. NoF-11; NPF-18

Enclosure:

Inspection Reports 50-373/97017(OL); 50-374/97017(OL)

cc w/ encl:

M. Wallace, Chief of Staff

D. Helwig, Senior Vice President

G, Stanley, PWR Vice President

J. Perry, BWR Vice Pres; dent

O. Farrar, Regulatory

Services Manager

I, Johnson, Licensing Director

DCD - Licensing

F. Dacimo, Site Vice President

T. O'Connor, Station Manager

P, Barnes, Regulatory Assurance

Supervisor

Richard Hubbard

Nathan Schloss, Economisi

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce

Commission

DOCUMENT NAME: G:DRS\\LAS97017.0L

r.

.

< e

c.c - . - - 2.co

. - - . w.m ,

OFFICE

Rlli

lv Rill

FRlli

t

Rlli

ii

~NAME

MBleiby:Jp M<

MLeach M4,,,

KO'Bris f 8'

GGrantQ(./

DATE

0244/98

02/4/98

goh

02t4798 "

02/Tl/98d()

OFFICIAL R5 CORD COPY

.

. . , . - . - . . _ . .

. - . . . -.-.

. .

- = - . -

-.-

. - - . . . . - - .

. . , - . - - . . . - . - .

_ _ _ _ ___

_

- _

' - - -

..

,

i

-

O. Kingsley -

3

February 28, 1998

'-

.

4

DistributioD

Docket File w/enci

Rlli PRR w/enci

Rlli Enf. Coordinator w/enci

,

l

PUBLIC IE-42 w/enct

SRI, LaSalle w/enci

TSL .v/enci

j

LPM, NRR w/ encl

J. L. Caldwell, Rlll w/ encl

R. A. Capra, NRR w/enci

'

DRP w/ encl

A. B. Beach, Rlil w/enci

DOCDESK w/enci

DRS w/ encl

IEO w/enci

,

,

.

W

t

j -

1

i

e

e

d

3

5

4

d

i

.

d

4

s.

._

k ..

e

,

- -

, , - , - . . .

. . , - - . . . , - - - - -

.

-

. . -

,..n-.