PLA-2832, Monthly Operating Repts for Mar 1987
| ML20206E860 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 03/31/1987 |
| From: | Hirt J, Keiser H PENNSYLVANIA POWER & LIGHT CO. |
| To: | Beebe M NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| PLA-2832, NUDOCS 8704130763 | |
| Download: ML20206E860 (9) | |
Text
.-
[@
g AVERAGE DAILY UNIT POWER LEVEL
+
k 50-387 DOCKET NO.
p "4
UNIT Om
(
0 DATs 4-6-87 4rcsMs COMPLETED BY J.A. h TELEPHONE (717) 542-3917 KONE March, 1987 1
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net)
I 1039 37 1042 1044 2
18 1042 3
inas 39 1042 4
1049 20 44a 1043 5
21 R2R 1032 829 6
22 1033 7
23 822 8
in17 821 24 9
1042 821 25 10 inaa 840 26 gg 1043 1037 27 12 1043 28 i n17 1044 1034 13 29 14 1nad 30 1037 15 1042 1037 3
1043 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77) 07041hh p
?"
\\(
i
8'gANN4 Mr %@
c.
e
.D 7
,e.T__O 3
LA*
CCNL J OPERATING DATA REPORT 0
DOCKET NO.
50-387 p
OpklC S [s DATE 04-06-87 i
COMPLETED BY J.A. H1rt TEllPHONE (717)542-3917 OPERATING STATUS Unit One Susquehanna Steam Electric Station Notes
- 1. Unit Name:
- 2. Reporting Period: March, 1987
- 3. Lkensed Thermal Power (MWt):
l'193
- 4. Nameplate Rating (Gross MWe):
1152
- 5. Design Electrical Rating (Net MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe): 1068
- 7. Maximum Dependable Capacity (Net MWe):
1032
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
None
- 9. Power Level To Which Restricted,If Any (Net MWe):
None
- 10. Reasons For Restrictions,If Any:
N/A This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744 2.160 33,433
- 12. Number Of Hours Reacto Was Critic 2]
744 2,160 24,347.5
- 13. Reactor Reserve St utdown Hours 0
0 812.7
- 14. Hours Genmt9t O.t.Line 744 2.160 23,774
- 15. Unit Reserve Mutdawn Hours 0
0 0
- 16. Gross Thermal Ens gy Generated (MWH) 2,346,691 6,813,143 73,096,281
- 17. Gross Electrical Erergy Generated (MWH) 767,964 2,231,248 23,818,786
- 18. Net Electrical Energy Generated (MWH) 742,040 2,151,282 22,826,311
- 19. Unit Service Factor 100.0 100.0 71.1
- 20. Unit Availability Factor 100.0 100.0 71.1
- 21. Unit Capacity Factor (Using MDC Net) 96.6 96.5 66.2 93*7 3*D
- E
- 22. Unit Capacity Factor (Using DER Net)
U.u U.u w.a
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
A Refueling Outage is scheduled to begin Septsber 5,1987 and end November 20,1987.
Evrected duration is 76 days,
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved 1
INITIA L CRITICALITY INITIA L ELECTRICITY j
COMMERCIAL OPERATION (4/77)
pANN Pk
~k\\
ae A.~. r.'
5 i
50-387 L
-b UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
tn UNIT NAME s m - Unit One
,,g fp DATE 04/06/87 44IC c;t REPORT MONTH March 19R7 COMPLETED BY J.A. Hirt 1ELEPHONE (7171542-3917 e.
50 4
Licensee Ee e
No.
Date h
jj
)Y Cause & Corrective (i
f'.
5$
Event 8
Action to yI 5
jgg Report a mO O
F-g Prevent Recurrence d
There were no' Unit Shutdowns or significant power reductions for March, 1987 1
2 3
4 F: Forceci Reason:
Method:
Exhibit G. Instructions S: Schedtled A-Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 0161)
E-Operator Training & Ucense Examination from previous month F-Administrative 5-Reduction 5
G-Operational Error (Explain)
Exhibit I - Same Source (1/77)
Il-Other (Explain) 9-Other
o T
SUSQUEHANNA STEAM ELECTRIC STATION Docket Ntaber 50-387 '
Date 04/06/87 Canpleted by J.- A. Hirt Telephone (717) 542-3917 i
Challenges to Main Stean Safety Relief Valves None Changes to the Offsite Dose Calr,ilation Manual i
None-i Major Changes to Radioactive Waste Treatment Systems None i.
4 d
6 i
4 l
e i
).
N i
i
,l l
i i
I w
w
.a-..
4
,.._,,1,,
.h r,
_.,__,....m,
.-y
[
AVERAGE DAILY UNIT POWER LFVEL 3
DOCKET NO. 50-388 L
"4 UNIT Two y
0 DATE 04/06/87 3
?gg eft COMPLETED BY J.A. Hirt TELEPHONE (717)S42-3917 March, 1987 MONE DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) j i
1051 1052 g7 2
1055 1g 1054 1056 3
19 1054 1053 4
ins 6 20 1055 5
21 1055 1055 1051 6
22 756 1051 7
g 8
909 1050 24 9
1052 1048 25 10 1054 26 1050 1054 1050 II 27 12 1053 1047 28 1054 13 29 in44 1053 14 30 1047 1052 1048 15 3
16 1053~
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
Y
~
g
[
$$Uh y
~:. :.'
t,i
- nnid j OPERATING DATA REPORT i
O DOCKETNO. 50-388 h
M DATE 04/06/87 NIC 6N COMPLETED BY _J. A. Hirt TELEPHONE (717)542-3917 OPERATING STATUS Unit 'lko Susquehanna Steam Electric Station Notes
- 2. Reporting Period:
March. 1987
- 3. Licensed Thermal Power (MWt):
3293 1152
- 4. Nameplate Rating (Gross MWe):
1065
- 5. Design Electrical Rating (Net MWe):
1068 o
- 6. Maximum Dependable Capacity (Gross MWe):
1032
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
None 1
- 9. Power Level To Which Restricted,If Any (Net MWe):
None
]
- 10. Reasons For Restrictions,If Any:
N/A
)
l This Month Yr..to-Date~
Cumulative
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 744 2,097 15,205
- 13. Reactor Reserve Shutdown Hours 0
0 717.9
- 14. Hours Generator On-Line 744 2,061.3 14,790.6
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 2,416,289 6,610,686 46,003,571
- 17. Gross Electrical Energy Generated (MWH) 799,144 2,184,612 15,088,906
- 18. Net Electrical Energy Generated (MWH) 772,151 2,109,164 14,511,693
- 19. Unit Service Factor 100.0 95.4 79.2
- U
- 4
- A
- 20. Unit Availability Factor
- 21. Unit Capac ty Factor (Using MDC Net) 100.6 94.6 75.3
- 22. Unit Caparity Factor (Using DER Net) 97.5 91.7 73.0
- 23. Unit Fo'end Outage Rate 0.0 4.6 11.5
- 24. Shutdow as Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
Ne shutdowns are currently scheduled.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status tPrior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION (9/77)
4,M 4 4 gI,ha-
\\ 7 m
. + -,
s 50-388 I
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
@f@ g R
UNIT NAME SSES-Unit %10 8
4 DATE 04/06/87 REPORT MONTH March, 1987 COMPLE BY I
Ric 5#
jE
}
Y Licensee Eg Cause & Corrective Date g
3g
,g&
Event p
pU Action to H
$5 5
j gg g Report #
mV Prevent Recurrence g
8 3
870307 S
0 B
5 N/A N/A N/A On March 7,1987, power was reduced to approximately 50% to change the Reactor Recirculation M/G set brushes and to perform a control rod sequence exchange. Power was returned to 100% on March 9, 1987, I
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain)
I-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 01611 E-Operator Training & License Examination from previous month F-Administrative 5-Reduction 5
G-Operational Error (Explain)
Exhibit I-Same Source (9/77)
Il-Other (Explain) 9-Other
~
..~
1 1
e SUSQUEHANNA STEAM EECTRIC STMION '
Docket Nunber 50-388 Date 04/06/87 9
1 Canpleted by J. A. Hirt Telephom (717) 542-3917 Challenges to Main Stean Safety Relief Valves Nom Changes to the Offsite Dose Calculation Manual Nom Major Changes to Radioactive Waste Treatment Systems 1
Nom i
1 4
-I J
l a
m
~
6-PP&L Pennsylvania Power & Light Company Two North Ninth Street
- Allentown, PA 18101
- 215 I 770-5151 fpRQ81987 Submitted pursuant to-Technical Specifications Harold W. Keiser Section 6.9.1.6 Vice President-Nuclear Operations 215/770-7502 Director, Data Automation &
Management Information Division Attention:
Mr. M. R. Beebe Management Information Branch Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.
20555 i
SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 PLA-2832 FILE R41-2A 50-388/NPF-22
Dear Mr. Beebe:
The March 1987 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.
Very truly yours, f
<t~
q59 H. W. Keis r Vice Presi ent-Nuclear Operations Attachment Document; Control Desk'(Original) cc:
NRC Region I Mr. L. R. Plisco - NRC Resident Mr. M. C. Thadani - NRC Project Manager l