3F1298-19, Withdraws Requesting Exemption from Requirements of 10CFR70.24(a), Criticality Accident Requirements
| ML20206P211 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 12/28/1998 |
| From: | Bernhoft S FLORIDA POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 3F1298-19, NUDOCS 9901110013 | |
| Download: ML20206P211 (1) | |
Text
.
j.*
Fl rida 8* L"A"^JS" Power N kUYcse No. DPR-72 December 28,1998 3F1298-19 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 4 001
Subject:
Crystal River Unit 3, Withdrawal of 10 CFR 70.24(a) Exemption Request
Reference:
FPC to NRC letter 3F0597-14, dated May 21,1997, Request for Exemption from 10 CFR 70.24(a), " Criticality Accident Requirements"
Dear Sir:
In the referenced letter, Florida Power Corporation (FPC) submitted a request for exemption from the requirements of 10 CFR 70.24(a) for Crystal River Unit 3 (CR-3). The purpose of j
this letter is to withdraw that request for exemption from NRC Staff review.
]
If you have any questions regarding this letter please contact Mr. Sid Powell, Manager, Nuclear Licensing at (352) 5634883.
Sincerely,
\\
sL&nh lb Sherry L. Ber ft Director Nuclear Regulatory Affairs 6j d) f SLB/rer xc:
Regional Administrator, Region II b
. Senior Resident Inspector
'O5 NRR Project Manager s_. v
9901110013 991228
- 7 PDR ADOCK 05000302 P
PDR CRYSTAL RIVER ENERGY COMPLEX: 15760 W. Power Line Street