TXX-6151, Interim Deficiency Rept CP-85-50 Re Use of Improper Welding Processes in Mfg of Cable Tray Tee Fittings Which Could Affect Equipment Qualification.Initially Reported on 851206. Next Rept Expected by 870428

From kanterella
Revision as of 23:04, 6 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Interim Deficiency Rept CP-85-50 Re Use of Improper Welding Processes in Mfg of Cable Tray Tee Fittings Which Could Affect Equipment Qualification.Initially Reported on 851206. Next Rept Expected by 870428
ML20207D842
Person / Time
Site: Comanche Peak  
Issue date: 12/15/1986
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-85-50, TXX-6151, NUDOCS 8612310241
Download: ML20207D842 (1)


Text

Log # TXX-6151 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. ehe NORTH OLIVE STRErr.1.B. 88. DALLAB. TEXAS 75301 December 15, 1986 wiwAM. G COUN...M.n j

.. mm

.m Mr. Eric H. Johnson, Director l 's DEC I 91986 Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission

[

l 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 CABLE TRAY TEE FITTINGS SDAR:

CP-85-50 (INTERIM REPORT)

Dear Mr. Johnson:

On December 6,1985, we verbally notified your Mr. H. S. Phillips of a deficiency involving the use of improper welding processes in the manufacturing of cable tray tee fittings which could affect the equipment qualification. _This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). Our latest report, logged TXX-6050, was submitted on October 21, 1986.

The test program outlined in our last interim report was anticipated to be completed in November, 1986. However, this scheduled date has since been postponed. We are presently scheduled to be finished by March 15, 1987. Our c #J assessment of this deficiency on the safety of plant operations in the event

~

the condition had remained undetected is pending evaluation of these test 7

results.

We anticipate submitting our next report on this issue no later than April 28, 1987.

Very truly yours, WdEb By:

/

G. S. Keeley Manager, Nuclea ng RS8/gj c - NRC Region IV (0 + 1 copy)

Director, Inspection and Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D. C.