Forwards Insp Rept 50-424/86-126 on 861201-05.No Violations or Deviations Noted
ML20207J170
Person / Time
Site: Vogtle 
Issue date: 12/23/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20207J174 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8701080326
Download: ML20207J170 (3)


See also: IR 05000424/1986126

Text

__

R

S

, s,

g

.

.

DEC 2 31986

' Docket No. 50-424

License No. CPPR-108

]GeorgiaPowerCompany

/ ATTN: Mr. J. H. Miller, Jr.

President

P. 0. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC INSPECTION REPORT N0. 50-424/86-126

This refers - to the Nuclear Regulatory Commission (NRC) inspection conducted by

_.

G. L. Troup on December 1-5,

1986.

The inspection included a review of

activities authorized for your Vogtle facility.

At the conclusion of the

in::pection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

.in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

,

i

Virgil L. Brownlee, Chief

Reactor Projects Branch 3

'

Division of Reactor Projects

-

Enclosure:

Inspection Report

cc w/ enc 1:

(See page 2)

$0kob

[

G

s\\

.EE o /

V

'

9

.

Georgia Power Company

2

4c w/ encl:

V . P. O'Reilly, Senior Vice President

Nuclear Operations

R

E. Conway, Senior Vice President &

Project Director

O. Foster, Vice President, Project

.

/ Support

VP. D. Rice, Vice President, Project

/

Engineering

V R. H. Pinson, Vice President, Project

Construction

J. T. Beckham, Vice President,

J.PlantHatch

R

A. Thomas, Vice President,

/. Licensing

D

S. Read, General Manager,

/ Quality Assurance

v'C. W. Hayes, Vogtle Quality

jW.C.Ramsey, Manager-

Assurance Manager

/ Readiness Review

vG. B. Bockhold, General Manager,

/ Nuclear Operations

VL. Gucwa, Manager, Nuclear Safety

M.andLicensing

H. Googe, Project

_j Construction Manager

VE. D. Groover, Quality

Assurance Site Manager -

Construction

rJ. A. Bailey, Project Licensing

}G.F.Trowbridge,Esq.,Shaw,

Manager

/ Pittman, Potts and Trowbridge

VB. W. Churchill, Esq. , Shaw,

Pittman, Potts and Trowbridge

NlE L. Blake, Jr., Esq., Shaw,

Pittman, Potts and Trowbridge

J. E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

G. Ledbetter, Commissioner,

.

Department of Human Resources

' C. H. Badger, Office of Planning

and Budget

' D. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

D. Feig, Georgians Against

Nuclear Energy

y- -

,

.

'

.

.,

.

..

Georgia Power Company

3

.. c w/ encl:

(Continued)

_ . B. Margulies, Esq., Chairman,

' Atomic Safety and Licensing Board

dr.anel

P

O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

Panel

G. A. Linenberger, Jr. , Administrative Judge

Atomic Safety and Licensing Board

Panel

bec w/ encl:

E. Reis, OGC

W. M. Hill, IE

VM. Miller,NRR

s W. Brach, ED0

N . Sinkule, RII

.

E. Christnot, RII

NRC Resident Inspector

Document Control Desk

State of Georgia

.

1

,(

ydh

Tfoup /

Hosey

DCollins

MSinkule

12/f/86 12/4/86 12/lj/86

12/p86

1