ML20207J170
| ML20207J170 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/23/1986 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20207J174 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8701080326 | |
| Download: ML20207J170 (3) | |
See also: IR 05000424/1986126
Text
__
R
S
, s,
g
.
.
DEC 2 31986
' Docket No. 50-424
License No. CPPR-108
]GeorgiaPowerCompany
/ ATTN: Mr. J. H. Miller, Jr.
President
P. 0. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC INSPECTION REPORT N0. 50-424/86-126
This refers - to the Nuclear Regulatory Commission (NRC) inspection conducted by
_.
G. L. Troup on December 1-5,
1986.
The inspection included a review of
activities authorized for your Vogtle facility.
At the conclusion of the
in::pection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
.in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
,
i
Virgil L. Brownlee, Chief
Reactor Projects Branch 3
'
Division of Reactor Projects
-
Enclosure:
Inspection Report
cc w/ enc 1:
(See page 2)
$0kob
[
G
s\\
.EE o /
V
'
9
.
Georgia Power Company
2
4c w/ encl:
V . P. O'Reilly, Senior Vice President
Nuclear Operations
R
E. Conway, Senior Vice President &
Project Director
O. Foster, Vice President, Project
.
/ Support
VP. D. Rice, Vice President, Project
/
Engineering
V R. H. Pinson, Vice President, Project
Construction
J. T. Beckham, Vice President,
J.PlantHatch
R
A. Thomas, Vice President,
/. Licensing
D
S. Read, General Manager,
/ Quality Assurance
v'C. W. Hayes, Vogtle Quality
jW.C.Ramsey, Manager-
Assurance Manager
/ Readiness Review
vG. B. Bockhold, General Manager,
/ Nuclear Operations
VL. Gucwa, Manager, Nuclear Safety
M.andLicensing
H. Googe, Project
_j Construction Manager
VE. D. Groover, Quality
Assurance Site Manager -
Construction
rJ. A. Bailey, Project Licensing
}G.F.Trowbridge,Esq.,Shaw,
Manager
/ Pittman, Potts and Trowbridge
VB. W. Churchill, Esq. , Shaw,
Pittman, Potts and Trowbridge
NlE L. Blake, Jr., Esq., Shaw,
Pittman, Potts and Trowbridge
J. E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
G. Ledbetter, Commissioner,
.
Department of Human Resources
' C. H. Badger, Office of Planning
and Budget
' D. Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
D. Feig, Georgians Against
Nuclear Energy
y- -
,
.
'
.
.,
.
..
Georgia Power Company
3
.. c w/ encl:
(Continued)
_ . B. Margulies, Esq., Chairman,
' Atomic Safety and Licensing Board
dr.anel
P
O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
Panel
G. A. Linenberger, Jr. , Administrative Judge
Atomic Safety and Licensing Board
Panel
bec w/ encl:
E. Reis, OGC
W. M. Hill, IE
VM. Miller,NRR
s W. Brach, ED0
N . Sinkule, RII
.
E. Christnot, RII
NRC Resident Inspector
Document Control Desk
State of Georgia
.
1
,(
ydh
Tfoup /
Hosey
DCollins
MSinkule
12/f/86 12/4/86 12/lj/86
12/p86
1