Monthly Operating Repts for Sept 1988 for Beaver Valley Power Station Units 1 & 2
ML20207N638
Person / Time
Site: Beaver Valley
Issue date: 09/30/1988
From: Sieber J, Winger M
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8810190269
Download: ML20207N638 (9)


Text

V 3

NARRATIVE SU tNtY OF MCt m!LY 0. 6.33 EXPERIFNCE UNIT I SEPTENLER 1988 Sqterber 1 The Unit operated at a ncnimi value of 100% output.

thruxf1 Septerter 3 Septatnr 4 At 0015, the Unit's outp2t was rodtxxd to 50% to load follcu.

Septater 5 The Unit zumined at 50%.

September 6 At 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />, the Unit's outp2t was escalated to a nceimi value of 100% ctJtpat.

Scotator 7 The Unit operated at a ro:timl value of 100% cutput.

t. M Septater 9 Septeter 10 At 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, the Unit's output was ratuccd to 50% to load folicw.

Septeter 11 The Unit's outp2t rcrained at 50%.

Septater 12 At 0445 bcurs, the Unit's output was increasal to a ncrtiral value of 100% output.

Septeter 13 The Unit cporattd at a ncnimi value ot' 100% cutput.

th m #1 Septator 16 Septenbar 17 At 0002 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, the Unit's cu+ pat has reduced tr. 50% to 1 cad follcu.

Septeter 18 The Unit cporated at 50% cutp2t.

September 19 At 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br />, the Unit's cutput was increased to 100%.

Septetor 20 The Unit operated at a ncnimi value of 100% cutput, th m rfi Septembct 23 Septater 24 At 002C lyun3, the Unit's cutput was ro+vwi to 50% for load follcuirg.

Septcier 25

'1ho Unit cporated at 50% output.

Septenber 26 At 0430 bcurs, the Unit's output was escalated to a ncnimi value of 100% outpat.

Scptember 27 The Unit cperatad at a natimi value of 100% output.

thrurJh Septeter 30 hbf b0bY

' ', }#

y e:v/

s

LL OPERATING DATA REPORT DOCKET NO.:

50 334 REPORT DATE:

10/10/88 COMPLETED BY: M.A.VINGER TELEPHONE:

(412) 393 7621 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: dEPTEMBER 1988
3. LICENSED THERMAL POWER (MVt):

2660

4. NAMEPLATE RATING (Gross MVe):

923

5. DESIGN ELECTRICAL RATING (Net MVe):

835

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

860

7. haX. DEPENDABLE CAPACITY (Net MVe):

810

8. 1F CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net We):

None

10. REASONS FOR RESTKICTIONS. IF ANY:

N/A THIS MONTH YEAR TO DATE CUMUIATIVE

11. HOURS IN REPORTING PERIOD:

720.0 6575.0 108863.0

12. NO. OF RRS. REACTOR WAS CRITICAL:

720.0 5053.1 64237.3

13. REACTOR RESERVE SKUTDOWN HOURS:

0.0 0.0 4482.8

14. HOURS GENERATOR WAS ON LINE:

720.0 4982.3 62636.5

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. CROSS THERMAL ENERGY GEN. (MVH):

1615227.0 12441744.0 149359063.5

17. CROSS ELECT. ENERGY GEN. (MWH):

518970.0 4024769.0 47S90489.0

18. NET ELECTRICAL ENERGY GEN. (MVH):

485500,0 37/0677.0 4'

6370.0

19. UNIT SERVICE FACTOR: (PERCENT) 100.0 75.8 59.8
20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 75.8 59.8
21. UNIT CAPACITY FACTOR (HDC): PCT 83.2 70.8 53.9
22. UNIT CAPACITY FACTOR (DER): PCT 80.8 68.7 52.3 23 UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 2.4 18.5 24 SHUTDOVNS SCHEDULED OVER NEXT SIX MohTHS (TYPE,DATE,AND DURATION OF EACH):
25. IF SHUT ECWN AT L.'iD OF REPCRT PERIOD, ESTIMATED DaTE OF STARTUP:
26. UNITS IN TEST STATJS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

UNil 5HUIDOWN5 AND F0WER REDUCTIONS DUCKEi NO.

50-314 UNII MAME avr5 usest #1 3DATE 10/10/85 REFOR T t00NIH September 1988 004rt E1Elt ey

_M.A. winger IER.EF990NE (412)-393-7621 "s.

ca w ** o O C. O Licensee e

o Cause & Corrective No.

Date 2

3UE Event

!e o4 Action to R

    • D I

s.$ "

Report #

eE s$.

Prevent Recurrence H

sw

  • *a gu g

a 17 880904 S

0 H

5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for load following.

18 880910 S

O H

5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for load following.

19 889017 5

0 H

5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for Ioad following.

20 880924 S

0 H

5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for load following.

n 1

2 3

4 I I "=eJ Rra*=e se,e s,.g :

3.Mes G. an semies.ms 5 Llerdis eJ A f.g.mpaise e y

l.,gl.pl,4,,3 s

g _g

, g g

recy,,,e,=..e p,e, 3 he e e Tess 2-es at scram I seen Sawess som f a rm<c f Ref%

3-A.te.eeic Scree 3 wee R<g*=e eI i R s I alc Nt tRI G I) E'F'el8'ae) Revoke **

4-Cent leased Freur Prewf ous 'losette UIC*I l I 8I wesene leelseeng A Isienesc I nasessaasiesse t

5.g

,,c g g I A h emene 9-Otteer 5

t. Ogwesee.mst i. e Il spla 3 Isi 4.w I-Tsun.%= c t*'/ F FI 18 Helers iI igdsmi1 e

AN ERAGE DAILV UNIT POWER LIVEL DOCKET NO. - 30"33' UNIT - 3??S 731: dl 10/1'0/88 DATE COMPLIMD SY M.A. Winger TILIPHONg (412) 393-7621 September 1988 gg DAY AVERACE DAILY POWER LIVEL DAY AVIRAGE DAILY POWER LIVEL IMWe, Net)

(MW,. Net )

806 404 37 796 371 g

gg 3

796 658 g,

4 417 788 3

5 375 21

_804 3

800 6

688 y

813 790 3

8 808 408 3

9 813 388 3

10 388 688 3

375 799 gg 3

798 g2 671 3

788 795 g3 800 796 14 g

33 808 N/A 3g 804 16 LMSTRUCTIONS On this forraat.!sst the netage dadv unit ;smer inei:n MWe. Net for each day in the rep.ating nk.nih. C.. nnute vis the nearett whO mepwatt.

(13 ( 7 7 )

L D

NARRATIVE SGMARY OF

)CtmEX OEERATING EXPERIINCE UNIT II SEPIEMBER 1988 1

The Unit operated at a ncainal value of 100% output.

Seg#anhar 19 Seltsehar 20 At 0306 laars, the Unit inadvertently tripped on 2 out of 3 OP aT aignals while perfornirq an operating surveillance test on the Unit's power range rua. lear instnmentaticn. At 1950 hours0.0226 days <br />0.542 hours <br />0.00322 weeks <br />7.41975e-4 months <br />, the Unit was taken critical.

Septerter 21 At 0513 hours0.00594 days <br />0.143 hours <br />8.482143e-4 weeks <br />1.951965e-4 months <br />, the Unit was synchronized and output was escalated to a ncninal value of 100) cxat;xat.

amhar 22 The Unit operatal at a ncutinal value of 100% output.

Seg#anhar 29 Seg$amhar 30 At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />, the Unit's cutpt?. was reduced to 15% to

%' watertex of the Unit's main condeneer. repairs to the condeneer tube cleaning t

B L

AVERACE DAILY UNIT 70wta LEYtt J

l DOCKET NO.

50-412 UNly bVPS Unit 2 10/10/88 g47g COMPLETED SY M.A. Winner TTLIPHONg (412) 393-7621 t

1 i

September 1988 g

DAY AVERACE DAILY power LIVIL DAY AVERACE DAILY power LIvtL tMWe, Net s i M h Nets 777 798 l

gy 1

769 gg

],98 781 790 3

g, 781

, 75 a

4 g

790 375 g

11 4

4 790 798 m

7 744 y

794 3

785 4

798 786 798 l

9 18 l

781 802 le 3

l gg g

786 798 790 798 g;

g 19s 79.

,3 I

778 y

807 3g 802 N/A gg g

802 le i

LNSTRL'CTIONS on this formal.!st the acrap saily unie ',mer sset :n Ntwe.Nei far each day in the revueting its.atn. i'...nnuie eu thG Seafell *hN ffWpwall.

i i

I j

44f77) i i

l l

F

~

i I

UNII SHtJIDOWN$ AND FOWER REEMET10NS DOCRE T NO. 50-412 UNIT NAmet avPs ts-It 2 DATE 10/10/88 REPORTA00NIN September 1988 CORWLETEle gy M.A. Winzer its.treecesE (412 )-393-76ZT

.s le em as o o, l "g

Ct Licensee Csuse & Corrective 0

No.

Date E

3%I Ev'ent S$

Actton to R

$5 3

f$"

Report #

.I s$

Prevent Recurrence H

a u

ym CU 0

a 18 880920 F

26.1 C

3 88-13 IA INSTRU

. Unit inadvertently tripped on 2 out of 3 OPAT Signals, while performing an l

operating eurveillance test on the 9

Unit's power range nuclear instrumentation.

19 880921 F

0 H

5 N/A ZZ ZZZZZZ Power rampup after Unit shutdown.

20 880930 S

0 B

5 N/A IIF HTEXCII Unit's output reduced to 757. to permit repairs to the condenser tube cleaning system for the

'B' waterbox of the Unit's main condenser.

I 2

3,,,, g,.4 :

4 l~

f wieJ Reas.

1. sluties C - Inde== !6.=es 5 5. hrJu8eJ A f.g ep r.: reel.,eg1,gd,6 I g _,,,,,,, g g., r,cya,,,,m,..e Ipm3 3 u%,.., g,,8 2-seam eI serem I aseg sheces s. I a rence C Refe.cli"E 3-herm etc Scree I '<=e It.3%.s e I I It 4 I eBr t Ni titl 6
  • ) Repdaew) Stessekseen 4-Centtes-d Fres'Prewto=* feenth hit.Il I tlyrsae.= Isaisieng A I sicase i ssesammi en 5-se csiess e

I Ad"*"esses" 9-Other 5

f. figwease. isi I se.w Il ar Imul Isbsene1 Ssner %.eu.<

l'8/ F F)

It Ospice il 3g.14 )

e

\\

OPERATING DATA REPORT DOCKET NO :

50 412 REPORT DATE:

10/10/88 COMPLETED BY: M.A.VINGER TELEPHONE:

(412) 393 7621 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: SEPTEMBER 1988
3. LICENSED THERMAL POWER (MVt):

2660

4. NAMEPLATE RATING (Gross MVe):

523

5. DESIGN ELECTRICAL RATING (Net MWe):

836

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

885

7. MAX. DEPENDABLE CAPACITY (Net MVe):

833

8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS. IF ANY:

N/A THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

720.0 6575.0 7646.0

12. NO. OF HRS. REACTOR VAS CRITICAL:

703.3 6074.8 7040.3

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

14. HOURS GENERATOR VAS ON LINE:

693.9 6020.5 6970.3

15. UNIT REFERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. CROSS THERMAL ENERGY GEN. (MWH):

1802754.0 15598760.0 17984397.4

17. CROSS ELECT. ENERGY GEN. (MVH):

573600.0 5007300.0 5789500.0

18. NET ELECTRICAL ENERGY GEN. (MVH):

542536.0 4732807.0 5470911.0

19. UNIT SERVICE FACTOR: (PERCENT) 96.4 91.6 91.2
20. UNIT AVAILABILITY FACTOR:(PERCENT) 96.4 91.6 91.2
21. UNIT CAPACITY FACTOR (KDC): PCT 90.5 86.4 85.9
22. UNIT CAPACITY FACTOR (DER): PCT 90.1 86.1 85 6
23. UNIT FORCED OUTAGE RATE: (PERCENT) 3.6 3.3 4.5
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE.DATE. AND DURATION OF EACH):

UNIT IS SCHEDUtrn FOR FIRST REFUELING OUTAGE BEGINNING MARCH 17.1989 TO HAY 26.1989

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A L

/'

'Af DuquesneUEht 1.,. so,. m m l

Nucket Group P.O. Don 4 October 10, 1988 Shippingport, PA IM77 0004 1

Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. D m-66 Unit 2 - Docket No. 50 412, License No. NPF-73 Monthly Ooeratim Reoort 1

I.

l U. S. Nuclear Regulatory Comuission Document Control Desk 1

Washington, D.C.

20555 ij Gentlanen:

In accordance with ix A Technical Specifications, the Monthly Operating Report is subnit for Unkt 1 ard Unit 2 for the month of September, i

1988.

t i

1 Very truly yours, i

4 0

(

dl.,

. D. Sieber Nice President Nuclear GruIp l

Imd Enclosures l

ocs NRC Rajional Office KilvJ of Prussia, PA i

l I

i