MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 L-98-096, Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 2 L-98-068, Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 2 L-98-036, Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station1998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station ML20202F8191998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Beaver Valley Power Station,Units 1 & 2 ML20198L3981997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-072, Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 2 L-97-057, Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-040, Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 2 ML20216H6031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Beaver Valley Power Station ML20210K5821997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Bvps,Units 1 & 2 ML20140D7261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for BVPS ML20141B3501997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Beaver Valley Power Station,Units 1 & 2 ML20137T1441997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Beaver Valley Power Station Units 1 & 2 ML20136G4651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Beaver Valley Power Station,Unit 1 & 2 ML20134K1521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Beaver Valley Power Station,Units 1 & 2 ML20133F4831996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Beaver Valley Power Station Unit 1 & 2 ML20132B1001996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Beaver Valley Power Station Unit 1 & 2 ML20134H4921996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Beaver Valley Power Station,Units 1 & 2 ML20128N1911996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Beaver Valley Power Station Unit 1 & 2 ML20117M2091996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Beaver Valley Power Station Units 1 & 2 ML20117B2481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Beaver Valley Power Station ML20115D4061996-06-30030 June 1996 Monthly Operating Repts for June 1996 for BVPS ML20117M1791996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Beaver Valley Power Station,Units 1 & 2 ML20111B2441996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Beaver Valley Power Station ML20101R0621996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Beaver Valley Power Station ML20100R2841996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Beaver Valley Power Station ML20097D4541996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Beaver Valley Power Station ML20096B2531995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Beaver Valley Power Station ML20095D8651995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Beaver Valley Power Station ML20094H3631995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Beaver Valley Power Station ML20092F4251995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Beaver Valley Power Station ML20087F1331995-07-31031 July 1995 Monthly Operating Repts for Jul 1995 for Beaver Valley Power Station ML20086G1601995-06-30030 June 1995 Monthly Operating Repts for June 1995 for Beaver Valley Power Station Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With1999-09-0202 September 1999 LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with ML20209D9531999-06-27027 June 1999 Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999 Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With ML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite1999-04-0505 April 1999 Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with ML20196K7981999-03-25025 March 1999 Rev 4 to COLR, for Cycle 8 L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced1999-02-0505 February 1999 Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced ML20196F7011999-01-31031 January 1999 BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20210G7041999-01-22022 January 1999 BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 ML20207E5861998-12-31031 December 1998 Annual Rept 1998 for Toledo Edison ML20207E5601998-12-31031 December 1998 Annual Rept 1998 for Pennpower ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20207E5901998-12-31031 December 1998 Dqe 1998 Annual Rept to Shareholders ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with ML20207E5521998-12-31031 December 1998 Annual Rept 1998 for Ohio Edison ML20207E5761998-12-31031 December 1998 Annual Rept 1998 for Illuminating Co ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with ML20206G0291998-10-31031 October 1998 BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20198F7611998-10-0606 October 1998 Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure1998-09-21021 September 1998 Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product1998-07-29029 July 1998 Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 1999-09-30
[Table view] |
Text
V 3 . . .
NARRATIVE SU tNtY OF MCt m!LY 0. 6.33 EXPERIFNCE UNIT I SEPTENLER 1988 Sqterber 1 The Unit operated at a ncnimi value of 100% output.
thruxf1 Septerter 3 Septatnr 4 At 0015, the Unit's outp2t was rodtxxd to 50% to load follcu.
Septater 5 The Unit zumined at 50%.
September 6 At 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />, the Unit's outp2t was escalated to a nceimi value of 100% ctJtpat.
Scotator 7 The Unit operated at a ro:timl value of 100% cutput.
- t. M Septater 9 Septeter 10 At 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, the Unit's output was ratuccd to 50% to load folicw.
Septeter 11 The Unit's outp2t rcrained at 50%.
Septater 12 At 0445 bcurs, the Unit's output was increasal to a ncrtiral value of 100% output.
Septeter 13 The Unit cporattd at a ncnimi value ot' 100% cutput.
th m #1 Septator 16 Septenbar 17 At 0002 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, the Unit's cu+ pat has reduced tr. 50% to 1 cad follcu.
Septeter 18 The Unit cporated at 50% cutp2t.
September 19 At 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br />, the Unit's cutput was increased to 100%.
Septetor 20 The Unit operated at a ncnimi value of 100% cutput, th m rfi Septembct 23 Septater 24 At 002C lyun3, the Unit's cutput was ro+vwi to 50% for load follcuirg.
Septcier 25 '1ho Unit cporated at 50% output.
Septenber 26 At 0430 bcurs, the Unit's output was escalated to a ncnimi value of 100% outpat.
Scptember 27 The Unit cperatad at a natimi value of 100% output.
thrurJh Septeter 30 hbf b0bY ' ' , }#
s y e:v/ -
LL OPERATING DATA REPORT DOCKET NO.: 50 334 REPORT DATE: 10/10/88 COMPLETED BY: M.A.VINGER TELEPHONE: (412) 393 7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: dEPTEMBER 1988
- 3. LICENSED THERMAL POWER (MVt): 2660
- 4. NAMEPLATE RATING (Gross MVe): 923
- 5. DESIGN ELECTRICAL RATING (Net MVe): 835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 860
- 7. haX. DEPENDABLE CAPACITY (Net MVe): 810
- 8. 1F CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net We): None
- 10. REASONS FOR RESTKICTIONS. IF ANY: N/A THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD: 720.0 6575.0 108863.0
- 12. NO. OF RRS. REACTOR WAS CRITICAL: 720.0 5053.1 64237.3
- 13. REACTOR RESERVE SKUTDOWN HOURS: 0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE: 720.0 4982.3 62636.5
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY GEN. (MVH): 1615227.0 12441744.0 149359063.5
- 17. CROSS ELECT. ENERGY GEN. (MWH): 518970.0 4024769.0 47S90489.0
- 18. NET ELECTRICAL ENERGY GEN. (MVH): 485500,0 37/0677.0 4' 6370.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 75.8 59.8
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 75.8 59.8
- 21. UNIT CAPACITY FACTOR (HDC): PCT 83.2 70.8 53.9
- 22. UNIT CAPACITY FACTOR (DER): PCT 80.8 68.7 52.3 23 UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 2.4 18.5 24 SHUTDOVNS SCHEDULED OVER NEXT SIX MohTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT ECWN AT L.'iD OF REPCRT PERIOD, ESTIMATED DaTE OF STARTUP:
- 26. UNITS IN TEST STATJS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
UNil 5HUIDOWN5 AND F0WER REDUCTIONS DUCKEi NO. 50-314 .- .
UNII MAME avr5 usest #1 3DATE 10/10/85 REFOR T t00NIH September 1988 004rt E1Elt ey _M.A. winger -
IER.EF990NE (412)-393-7621 "s.
ca w ** o "
e C. O Licensee o Cause & Corrective No. Date % %$ 3UE 2 Event !e o4 Action to R
H
- D s$ . I s* .$ " Report # eE Prevent Recurrence sw *a gu g a
17 880904 S 0 H 5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for load following.
18 880910 S O H 5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for load following.
19 889017 5 0 H 5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for Ioad following.
20 880924 S 0 H 5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for load following.
n 1 2 I I "=eJ Rra*=e 3 4 se,e s,.g : 3.Mes G. an semies.ms 5 Llerdis seJ A f.g.mpaise e y l. ,gl .pl,4,,3 g _g ,g g recy,,,e,= ..e p,e, 3 he e e Tess 2-es at scram I seen Sawess som f a rm<c f Ref% 3-A.te.eeic Scree 3 wee R<g*=e eI i R s I alc Nt tRI G I) E'F'el8'ae) Revoke ** 4-Cent leased Freur Prewf ous 'losette UIC*I l I 8I wesene t leelseeng A Isienesc I nasessaasiesse 5.g ,,c g g I A h emene 9-Otteer 5
- t. Ogwesee.mst i . e Il spla 3 Isi 4.w I-Tsun.%= c t*'/ F FI 18 Helers iI igdsmi1 e
, . AN ERAGE DAILV UNIT POWER LIVEL DOCKET NO. - 30"33' UNIT - 3??S 731: dl .
DATE 10/1'0/88 COMPLIMD SY M.A. Winger TILIPHONg (412) 393-7621 gg September 1988 DAY AVERACE DAILY POWER LIVEL DAY AVIRAGE DAILY POWER LIVEL IMWe, Net) (MW,. Net )
806 404 37 ,
g 796 gg 371 3 796 g, 658 4 417 3 788 5 375 21 _804 6 688 , 3 800 y 813 790 3
808 408 8 3 813 388 9 3 10 388 3 688 gg 375 799 3 _
g2 671 3 798 g3 788 795 14 800 g 796 33 808 3g N/A 804 16 LMSTRUCTIONS On this forraat.!sst the netage dadv unit ;smer inei:n MWe. Net for each day in the rep.ating nk.nih. C.. nnute vis the nearett whO mepwatt.
(13 ( 7 7 )
L D
. . NARRATIVE SGMARY OF
)CtmEX OEERATING EXPERIINCE UNIT II SEPIEMBER 1988 1 The Unit operated at a ncainal value of 100% output.
Seg#anhar 19 Seltsehar 20 At 0306 laars, the Unit inadvertently tripped on 2 out of 3 OP aT aignals while perfornirq an operating surveillance test on the Unit's power range rua. lear instnmentaticn. At 1950 hours0.0226 days <br />0.542 hours <br />0.00322 weeks <br />7.41975e-4 months <br />, the Unit was taken critical.
Septerter 21 At 0513 hours0.00594 days <br />0.143 hours <br />8.482143e-4 weeks <br />1.951965e-4 months <br />, the Unit was synchronized and output was escalated to a ncninal value of 100) cxat;xat.
amhar 22 The Unit operatal at a ncutinal value of 100% output.
Seg#anhar 29 Seg$amhar 30 At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />, the Unit's cutpt?. was reduced to 15% to t
B watertex of the Unit's main condeneer. repairs to the condeneer tube cleaning L
J AVERACE DAILY UNIT 70wta LEYtt .
l l
DOCKET NO. 50-412 UNly bVPS Unit 2 l g47g 10/10/88 ;
COMPLETED SY M.A. Winner
.' TTLIPHONg (412) 393-7621 t
1 i
g September 1988 DAY AVERACE DAILY power LIVIL DAY AVERACE DAILY power LIvtL tMWe, Net s i M h Nets
- l 777 gy 798 1
769 gg ],98 781 g, 790 3
a 4
781 g , 75 g 790 375 4
11 4 790 m 798 7 744 y 794 3 785 4 798 9
786 798 l - 18 l le 781 802 3
l gg 786 g 798 g; 790 g 798
,3 19s :, 79.
I y 807 3g 778 gg 802
, g N/A 802 le i
LNSTRL'CTIONS on this formal.!st the acrap saily unie ',mer sset :n Ntwe.Nei far each day in the revueting its.atn. i'...nnuie e u i
thG Seafell *hN ffWpwall.
i I
j 44f77) i i
l l
F
~
UNII SHtJIDOWN$ AND FOWER REEMET10NS DOCRE T NO. 50-412 UNIT NAmet avPs ts-It 2 DATE 10/10/88 .
REPORTA00NIN September 1988 CORWLETEle gy M.A. Winzer its.treecesE (412 )-393- 76ZT
.s le em as o o, l "g 0 Ct Licensee ., Csuse & Corrective No. Date ". %$ E 3%I Ev'ent !, S$ Actton to R a
$5 3 f$" Report # .I s$ Prevent Recurrence H u ym CU 0 a
18 880920 F 26.1 C 3 88-13 IA INSTRU . Unit inadvertently tripped on 2 out of 3 OPAT Signals, while performing an operating eurveillance test on the l Unit's power range nuclear 9
instrumentation.
19 880921 F 0 H 5 N/A ZZ ZZZZZZ Power rampup after Unit shutdown.
20 880930 S 0 B 5 N/A IIF HTEXCII Unit's output reduced to 757. to permit repairs to the condenser tube cleaning system for the 'B' waterbox of the Unit's main condenser.
I 2 l~ f wieJ Reas. 3 ,,,, g,.4 : 4 5 5. hrJu8eJ 1. sluties C - Inde== !6.=es A f.g ep r.: reel.,eg1 ,gd,6 I g _,,,,,,, g g., r,cya,,,,m, ..e Ipm3 3 u%, .., g,,8 I aseg sheces s. I a rence 2-seam eI serem C Refe.cli"E 3-herm etc Scree I '<=e It.3%.s e I I It 4 I eBr t Ni titl 6
- ) Repdaew) Stessekseen 4-Centtes-d Fres'Prewto=* feenth hit.Il I tlyrsae.= Isaisieng A I sicase i ssesammi en 5-see csiess I Ad"*"esses" 9-Other 5
- f. figwease. isi I se.w Il ar Imul .
Isbsene1 Ssner %.eu.<
l'8/ F F) It Ospice il 3g.14 ) -
e
\ _
OPERATING DATA REPORT DOCKET NO : 50 412 REPORT DATE: 10/10/88 COMPLETED BY: M.A.VINGER TELEPHONE: (412) 393 7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: SEPTEMBER 1988
- 3. LICENSED THERMAL POWER (MVt): 2660
- 4. NAMEPLATE RATING (Gross MVe): 523
- 5. DESIGN ELECTRICAL RATING (Net MWe): 836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 885
- 7. MAX. DEPENDABLE CAPACITY (Net MVe): 833
- 8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net MWe): None
- 10. REASONS FOR RESTRICTIONS. IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 720.0 6575.0 7646.0
- 12. NO. OF HRS. REACTOR VAS CRITICAL: 703.3 6074.8 7040.3
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. HOURS GENERATOR VAS ON LINE: 693.9 6020.5 6970.3
- 15. UNIT REFERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY GEN. (MWH): 1802754.0 15598760.0 17984397.4
- 17. CROSS ELECT. ENERGY GEN. (MVH): 573600.0 5007300.0 5789500.0
- 18. NET ELECTRICAL ENERGY GEN. (MVH): 542536.0 4732807.0 5470911.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 96.4 91.6 91.2
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 96.4 91.6 91.2
- 21. UNIT CAPACITY FACTOR (KDC): PCT 90.5 86.4 85.9
- 22. UNIT CAPACITY FACTOR (DER): PCT 90.1 86.1 85 6
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 3.6 3.3 4.5
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE.DATE. AND DURATION OF EACH):
UNIT IS SCHEDUtrn FOR FIRST REFUELING OUTAGE BEGINNING MARCH 17.1989 TO HAY 26.1989
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A L . /'
'Af l
, DuquesneUEht 1.,. so,. m m l
Nucket Group l P.O. Don 4 October 10, 1988 !
Shippingport, PA IM77 0004 1
Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. D m-66 Unit 2 - Docket No. 50 412, License No. NPF-73 Monthly Ooeratim Reoort 1
I.
l U. S. Nuclear Regulatory Comuission 1
Document Control Desk Washington, D.C. 20555 ij Gentlanen:
In accordance with ix A Technical Specifications, the Monthly i
Operating Report is subnit for Unkt 1 ard Unit 2 for the month of September, 1988.
t i
1 Very truly yours, i
4 0
( dl. , -
. D. Sieber Nice President Nuclear GruIp l Imd Enclosures l ocs NRC Rajional Office KilvJ of Prussia, PA i