NARRATIVE SU tNtY OF MCt m!LY 0. 6.33 EXPERIFNCE UNIT I SEPTENLER 1988 Sqterber 1 The Unit operated at a ncnimi value of 100% output.
thruxf1 Septerter 3 Septatnr 4 At 0015, the Unit's outp2t was rodtxxd to 50% to load follcu.
Septater 5 The Unit zumined at 50%.
September 6 At 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />, the Unit's outp2t was escalated to a nceimi value of 100% ctJtpat.
Scotator 7 The Unit operated at a ro:timl value of 100% cutput.
- t. M Septater 9 Septeter 10 At 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, the Unit's output was ratuccd to 50% to load folicw.
Septeter 11 The Unit's outp2t rcrained at 50%.
Septater 12 At 0445 bcurs, the Unit's output was increasal to a ncrtiral value of 100% output.
Septeter 13 The Unit cporattd at a ncnimi value ot' 100% cutput.
th m #1 Septator 16 Septenbar 17 At 0002 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, the Unit's cu+ pat has reduced tr. 50% to 1 cad follcu.
Septeter 18 The Unit cporated at 50% cutp2t.
September 19 At 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br />, the Unit's cutput was increased to 100%.
Septetor 20 The Unit operated at a ncnimi value of 100% cutput, th m rfi Septembct 23 Septater 24 At 002C lyun3, the Unit's cutput was ro+vwi to 50% for load follcuirg.
Septcier 25
'1ho Unit cporated at 50% output.
Septenber 26 At 0430 bcurs, the Unit's output was escalated to a ncnimi value of 100% outpat.
Scptember 27 The Unit cperatad at a natimi value of 100% output.
thrurJh Septeter 30 hbf b0bY
' ', }#
y e:v/
s
LL OPERATING DATA REPORT DOCKET NO.:
50 334 REPORT DATE:
10/10/88 COMPLETED BY: M.A.VINGER TELEPHONE:
(412) 393 7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: dEPTEMBER 1988
- 3. LICENSED THERMAL POWER (MVt):
2660
- 4. NAMEPLATE RATING (Gross MVe):
923
- 5. DESIGN ELECTRICAL RATING (Net MVe):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860
- 7. haX. DEPENDABLE CAPACITY (Net MVe):
810
- 8. 1F CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net We):
None
- 10. REASONS FOR RESTKICTIONS. IF ANY:
N/A THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD:
720.0 6575.0 108863.0
- 12. NO. OF RRS. REACTOR WAS CRITICAL:
720.0 5053.1 64237.3
- 13. REACTOR RESERVE SKUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
720.0 4982.3 62636.5
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY GEN. (MVH):
1615227.0 12441744.0 149359063.5
- 17. CROSS ELECT. ENERGY GEN. (MWH):
518970.0 4024769.0 47S90489.0
- 18. NET ELECTRICAL ENERGY GEN. (MVH):
485500,0 37/0677.0 4'
6370.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 75.8 59.8
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 75.8 59.8
- 21. UNIT CAPACITY FACTOR (HDC): PCT 83.2 70.8 53.9
- 22. UNIT CAPACITY FACTOR (DER): PCT 80.8 68.7 52.3 23 UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 2.4 18.5 24 SHUTDOVNS SCHEDULED OVER NEXT SIX MohTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT ECWN AT L.'iD OF REPCRT PERIOD, ESTIMATED DaTE OF STARTUP:
- 26. UNITS IN TEST STATJS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
UNil 5HUIDOWN5 AND F0WER REDUCTIONS DUCKEi NO.
50-314 UNII MAME avr5 usest #1 3DATE 10/10/85 REFOR T t00NIH September 1988 004rt E1Elt ey
_M.A. winger IER.EF990NE (412)-393-7621 "s.
ca w ** o O C. O Licensee e
o Cause & Corrective No.
Date 2
3UE Event
!e o4 Action to R
- D I
s.$ "
Report #
eE s$.
Prevent Recurrence H
sw
- *a gu g
a 17 880904 S
0 H
5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for load following.
18 880910 S
O H
5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for load following.
19 889017 5
0 H
5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for Ioad following.
20 880924 S
0 H
5 N/A ZZ ZZZZZZ Unit's output was reduced to 50% for load following.
n 1
2 3
4 I I "=eJ Rra*=e se,e s,.g :
3.Mes G. an semies.ms 5 Llerdis eJ A f.g.mpaise e y
- l.,gl.pl,4,,3 s
g _g
, g g
recy,,,e,=..e p,e, 3 he e e Tess 2-es at scram I seen Sawess som f a rm<c f Ref%
3-A.te.eeic Scree 3 wee R<g*=e eI i R s I alc Nt tRI G I) E'F'el8'ae) Revoke **
4-Cent leased Freur Prewf ous 'losette UIC*I l I 8I wesene leelseeng A Isienesc I nasessaasiesse t
5.g
,,c g g I A h emene 9-Otteer 5
- t. Ogwesee.mst i. e Il spla 3 Isi 4.w I-Tsun.%= c t*'/ F FI 18 Helers iI igdsmi1 e
AN ERAGE DAILV UNIT POWER LIVEL DOCKET NO. - 30"33' UNIT - 3??S 731: dl 10/1'0/88 DATE COMPLIMD SY M.A. Winger TILIPHONg (412) 393-7621 September 1988 gg DAY AVERACE DAILY POWER LIVEL DAY AVIRAGE DAILY POWER LIVEL IMWe, Net)
(MW,. Net )
806 404 37 796 371 g
gg 3
796 658 g,
4 417 788 3
5 375 21
_804 3
800 6
688 y
813 790 3
8 808 408 3
9 813 388 3
10 388 688 3
375 799 gg 3
798 g2 671 3
788 795 g3 800 796 14 g
33 808 N/A 3g 804 16 LMSTRUCTIONS On this forraat.!sst the netage dadv unit ;smer inei:n MWe. Net for each day in the rep.ating nk.nih. C.. nnute vis the nearett whO mepwatt.
(13 ( 7 7 )
L D
NARRATIVE SGMARY OF
)CtmEX OEERATING EXPERIINCE UNIT II SEPIEMBER 1988 1
The Unit operated at a ncainal value of 100% output.
Seg#anhar 19 Seltsehar 20 At 0306 laars, the Unit inadvertently tripped on 2 out of 3 OP aT aignals while perfornirq an operating surveillance test on the Unit's power range rua. lear instnmentaticn. At 1950 hours0.0226 days <br />0.542 hours <br />0.00322 weeks <br />7.41975e-4 months <br />, the Unit was taken critical.
Septerter 21 At 0513 hours0.00594 days <br />0.143 hours <br />8.482143e-4 weeks <br />1.951965e-4 months <br />, the Unit was synchronized and output was escalated to a ncninal value of 100) cxat;xat.
amhar 22 The Unit operatal at a ncutinal value of 100% output.
Seg#anhar 29 Seg$amhar 30 At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />, the Unit's cutpt?. was reduced to 15% to
%' watertex of the Unit's main condeneer. repairs to the condeneer tube cleaning t
B L
AVERACE DAILY UNIT 70wta LEYtt J
l DOCKET NO.
50-412 UNly bVPS Unit 2 10/10/88 g47g COMPLETED SY M.A. Winner TTLIPHONg (412) 393-7621 t
1 i
September 1988 g
DAY AVERACE DAILY power LIVIL DAY AVERACE DAILY power LIvtL tMWe, Net s i M h Nets 777 798 l
gy 1
769 gg
],98 781 790 3
g, 781
, 75 a
4 g
790 375 g
11 4
4 790 798 m
7 744 y
794 3
785 4
798 786 798 l
9 18 l
781 802 le 3
l gg g
786 798 790 798 g;
g 19s 79.
,3 I
778 y
807 3g 802 N/A gg g
802 le i
LNSTRL'CTIONS on this formal.!st the acrap saily unie ',mer sset :n Ntwe.Nei far each day in the revueting its.atn. i'...nnuie eu thG Seafell *hN ffWpwall.
i i
I j
44f77) i i
l l
F
~
i I
UNII SHtJIDOWN$ AND FOWER REEMET10NS DOCRE T NO. 50-412 UNIT NAmet avPs ts-It 2 DATE 10/10/88 REPORTA00NIN September 1988 CORWLETEle gy M.A. Winzer its.treecesE (412 )-393-76ZT
.s le em as o o, l "g
Ct Licensee Csuse & Corrective 0
No.
Date E
3%I Ev'ent S$
Actton to R
$5 3
f$"
Report #
.I s$
Prevent Recurrence H
a u
ym CU 0
a 18 880920 F
26.1 C
3 88-13 IA INSTRU
. Unit inadvertently tripped on 2 out of 3 OPAT Signals, while performing an l
operating eurveillance test on the 9
Unit's power range nuclear instrumentation.
19 880921 F
0 H
5 N/A ZZ ZZZZZZ Power rampup after Unit shutdown.
20 880930 S
0 B
5 N/A IIF HTEXCII Unit's output reduced to 757. to permit repairs to the condenser tube cleaning system for the
'B' waterbox of the Unit's main condenser.
I 2
3,,,, g,.4 :
4 l~
f wieJ Reas.
- 1. sluties C - Inde== !6.=es 5 5. hrJu8eJ A f.g ep r.: reel.,eg1,gd,6 I g _,,,,,,, g g., r,cya,,,,m,..e Ipm3 3 u%,.., g,,8 2-seam eI serem I aseg sheces s. I a rence C Refe.cli"E 3-herm etc Scree I '<=e It.3%.s e I I It 4 I eBr t Ni titl 6
- ) Repdaew) Stessekseen 4-Centtes-d Fres'Prewto=* feenth hit.Il I tlyrsae.= Isaisieng A I sicase i ssesammi en 5-se csiess e
I Ad"*"esses" 9-Other 5
- f. figwease. isi I se.w Il ar Imul Isbsene1 Ssner %.eu.<
l'8/ F F)
It Ospice il 3g.14 )
e
\\
OPERATING DATA REPORT DOCKET NO :
50 412 REPORT DATE:
10/10/88 COMPLETED BY: M.A.VINGER TELEPHONE:
(412) 393 7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: SEPTEMBER 1988
- 3. LICENSED THERMAL POWER (MVt):
2660
- 4. NAMEPLATE RATING (Gross MVe):
523
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
885
- 7. MAX. DEPENDABLE CAPACITY (Net MVe):
833
- 8. IF CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS. IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
720.0 6575.0 7646.0
- 12. NO. OF HRS. REACTOR VAS CRITICAL:
703.3 6074.8 7040.3
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR VAS ON LINE:
693.9 6020.5 6970.3
- 15. UNIT REFERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY GEN. (MWH):
1802754.0 15598760.0 17984397.4
- 17. CROSS ELECT. ENERGY GEN. (MVH):
573600.0 5007300.0 5789500.0
- 18. NET ELECTRICAL ENERGY GEN. (MVH):
542536.0 4732807.0 5470911.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 96.4 91.6 91.2
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 96.4 91.6 91.2
- 21. UNIT CAPACITY FACTOR (KDC): PCT 90.5 86.4 85.9
- 22. UNIT CAPACITY FACTOR (DER): PCT 90.1 86.1 85 6
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 3.6 3.3 4.5
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE.DATE. AND DURATION OF EACH):
UNIT IS SCHEDUtrn FOR FIRST REFUELING OUTAGE BEGINNING MARCH 17.1989 TO HAY 26.1989
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A L
/'
'Af DuquesneUEht 1.,. so,. m m l
Nucket Group P.O. Don 4 October 10, 1988 Shippingport, PA IM77 0004 1
Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. D m-66 Unit 2 - Docket No. 50 412, License No. NPF-73 Monthly Ooeratim Reoort 1
I.
l U. S. Nuclear Regulatory Comuission Document Control Desk 1
Washington, D.C.
20555 ij Gentlanen:
In accordance with ix A Technical Specifications, the Monthly Operating Report is subnit for Unkt 1 ard Unit 2 for the month of September, i
1988.
t i
1 Very truly yours, i
4 0
(
dl.,
. D. Sieber Nice President Nuclear GruIp l