ML20207S548
| ML20207S548 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 03/11/1987 |
| From: | Fay C WISCONSIN ELECTRIC POWER CO. |
| To: | Degrassi G BROOKHAVEN NATIONAL LABORATORY |
| References | |
| NUDOCS 8703200019 | |
| Download: ML20207S548 (2) | |
Text
- _ _
j Wisconsin Electnc m coumr 231 W. MICHIG AN, P.O. 80X 2046, MILWAUKEE, WI S3201 (414)277-2345 VPNPD-87-99 March 11, 1987 FEDERAL EXPRESS Mr. Giuliano DeGrassi Department of Nuclear Energy BROOKHAVEN NATIONAL LABORATORY Building 129, 60 Cornell Street Upton, New York 11973
Dear Mr. DeGrassi:
ENERGY ABSORBER INFORMATION l
POINT BEACH NUCLEAR PLANT Per your verbal request on March 6, 1987, we are transmitting l
the following information related to the use of energy absorbers on the main steam dump system at Point Beach Nuclear Plant.
1)
Bechtel Specification 10447-042(Q), Revision 0, Technical Specification for Energy Absorbers, which includes Fabrication / Assembly Drawings 7409, Revision A and 7410, Revision A.
2)
Bechtel Calculation E10447-1, Revision 0, Fatigue Evaluation I
of Energy Absorbers, Point Beach Nuclear Plant.
3)
Procedure NDE-750,' Revision 5, Visual Examination of Nuclear Power Plant Components.
l We proposed to include the energy absorbers in our ISI program on the following basis:
1)
Energy absorbers will be given a VT-3 examination on an annual basis for a period of 3 (three) years after initial installation.
2)
After 3 (three) years, the energy absorbers will be placed on a rotating ISI program such that each one receives a VT-3 examination within a 10-year period.
Assuming only the 5 (five) energy absorbers covered by our current application are installed at PBNP - Unit 1, this means that at least one energy absorber would be inspected every two years to identify any generic design or operability problems.
N\\
8703200019 B70311 I
g\\g g) {$dk{ggj PDR ADOCK 05000266 G
\\
r j..
Mr. Giuliano DeGrassi
' March 11, 1987' Page 2 Ldescribes Wisconsin l Electric's VT-3 examination procedures including personnel qualifications, methods, examination,-interpretation, and documentation' requirements.
Weltrust that-this. submittal.will' provide you the1information.
necessary for you to complete your SER.-
We request'that
' Attachment'l be returned to WE after your review since the
'information is considered proprietary by Bechtel.
-Very truly yours,
/
[
C. - W.
Fay Vice President
. Nuclear Power.
Enclosures.
4,-C6py.to Mr. George Lear, Project DirectorL(w/o/e)
PWR Project Directorate 1 c -.
-