Responds to 870306 Request for Info Re Use of Energy Absorbers on Main Steam Dump Sys to Complete Ser.Proposed Use of Energy Absorbers in Inservice Insp Program Described. Stated Encls Withheld
ML20207S548
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/11/1987
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Degrassi G
BROOKHAVEN NATIONAL LABORATORY
References
NUDOCS 8703200019
Download: ML20207S548 (2)


Text

- _ _ _____

j Wisconsin Electnc m coumr 231 W. MICHIG AN, P.O. 80X 2046, MILWAUKEE, WI S3201 (414)277-2345 VPNPD-87-99 March 11, 1987 FEDERAL EXPRESS Mr. Giuliano DeGrassi Department of Nuclear Energy BROOKHAVEN NATIONAL LABORATORY Building 129, 60 Cornell Street Upton, New York 11973

Dear Mr. DeGrassi:

ENERGY ABSORBER INFORMATION l POINT BEACH NUCLEAR PLANT Per your verbal request on March 6, 1987, we are transmitting l the following information related to the use of energy absorbers on the main steam dump system at Point Beach Nuclear Plant.

1) Bechtel Specification 10447-042(Q), Revision 0, Technical Specification for Energy Absorbers, which includes Fabrication / Assembly Drawings 7409, Revision A and 7410, Revision A.
2) Bechtel Calculation E10447-1, Revision 0, Fatigue Evaluation I of Energy Absorbers, Point Beach Nuclear Plant.
3) Procedure NDE-750,' Revision 5, Visual Examination of Nuclear Power Plant Components.

l We proposed to include the energy absorbers in our ISI program on the following basis:

1) Energy absorbers will be given a VT-3 examination on an annual basis for a period of 3 (three) years after initial installation.
2) After 3 (three) years, the energy absorbers will be placed on a rotating ISI program such that each one receives a VT-3 examination within a 10-year period. Assuming only the 5 (five) energy absorbers covered by our current application are installed at PBNP - Unit 1, this means that at least one energy absorber would be inspected every two years to identify any generic design or operability problems.

8703200019 B70311 I N\

PDR ADOCK 05000266 G PDR g\g

\ g) {$dk{ggj

r -- : ,

j ..

Mr. Giuliano DeGrassi

' March 11, 1987' Page 2 Attachment 3Ldescribes Wisconsin l Electric's VT-3 examination procedures including personnel qualifications, methods, examination,-interpretation, and documentation' requirements.

Weltrust that-this. submittal.will' provide you the1information.

necessary for you to complete your SER.- We request'that

' Attachment'l be returned to WE after your review since the

'information is considered proprietary by Bechtel.

-Very truly yours,

/

[

C . - W. Fay Vice President

. Nuclear Power.

Enclosures.

4,-C6py.to Mr. George Lear, Project DirectorL(w/o/e)