ML20210R003
| ML20210R003 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 08/10/1999 |
| From: | Barron H DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20210R006 | List: |
| References | |
| NUDOCS 9908170010 | |
| Download: ML20210R003 (3) | |
Text
r.
- e c
- 4 4
,/~~'} g Duke Energy Corporation
- {j McGuire Nudear Station 12700 Hagers Ferry Road Huntersville, NC 28078-9340
' 'H. B. Batron (704) 875-4800 omCE yy jy,y, (704) 875-4809 Mx August 10, 1999 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555
~
Subject:
McGuire Nuclear Station Docket Nos. 50-369, 50-370 Technical Specification Bases Change #5 The attached revised Technical Specification-Bases pages l
are transmitted to the NRC for information and use, i
Editorial changes were made to correct an incorrect UFSAR reference number associated with certain reactor coolant 4
system pressure isolation valves.
I This change was implemented in accordance with the provisions of 10CFR 50.59.
Questions should be directed to Kay Crane, McGuire Regulatory Compliance at (704) 875-4306.
lb Wm
-H.
B.
Barron, Vice President McGuire Nuclear Station Attachment f
,1
-R l
9908170010 990810 PDR ADOCK 05000369.
p PDR 17tnf27
',4 :
U. S. Nuclear Regulatory. Commission
-August 10, 1999 Page 2 Mr. Luis Reyes' Regional. Administrator Region IIL U.S.-Nuclear Regulatory' Commission Atlanta Federal Center.
61 Forsyth: Street, S.W., Suite 23T85 i
Atlanta,. Georgia 30303 1
Mr' Frank Finaldi,' Project ~ Manager.
U.S. Nuclear Regulatory Commission
=: Washington, D.C.
.20555 q
Mr.= Scott Shaeffer.
Senior Resident' Inspector _
McGuire' Nuclear Station rL
e 4
U.'S.
Nuclear Regulatory Commission August 10, 1999 Page 3 cc: Bases Change #5 ECO50-ELL
}.A