ML20210T105
| ML20210T105 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 12/24/1975 |
| From: | Tedesco R Office of Nuclear Reactor Regulation |
| To: | Deyoung R Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-1661 NUDOCS 8605290721 | |
| Download: ML20210T105 (1) | |
Text
(Lgksf
[f I
DISTRIBUTION:
Docket File NRR Reading DEC 2 41975 CS Reading APCSB Reading Docket Nos. S l
R. C. DeYoung, Assistant Director for Light Water Reactors, Group 1 EL l
t AITIILIARY AND POWER CONVERSION SYSTEMS BRANCH, REQUEST POR J
ADDITIONAL INFORMATION t
Plant Name: WPPSS Nuclear Project No. 3 and No. 5 Licensing Stage: CP Docket Numbers: STN 50-508; STN 50-509 l
Milentone Number: 12-02 Responsible Branch: LWR l-3 Project Manager:
A. Bournia The Auxiliary and Power Conversion Systems Branch has reviewed Amendments 25 and 26 of the PSAR regarding design changes in the WPPSS 3 and 5 plants.
i Enclosed is our position in rerard to the proposed diesel fuel oil 6
storage tanks arrangement relative to fire protection of the essential equipment.
Robert L. Tedesco, Assistant Director for Containment Safety Division of Technical Review
Enclosure:
As Stated cc:
S. Hanauer, TA W. Mcdonald, MIPC R. Boyd, RL R. Heinessen, TR r
O. Parr, RL l
V. Benaroya, APCSB A. Bournia, RL i
D. Fischer, AFCSB l
P. Matthews, APCSB h52l DOCK 05000508 O721 751gg4 n C C. Lians, APCSB F
I i
APCS.B:C TR CS:
APCSB:CS:T_R @APCSB:CS:T f._
o,,,c,
- CLiang:mc g,PMAtth ys D
r rte do
.u...,*
c 12/24 /75 12/2y/75
.l.
/75 12p /75_
I Form AEC.)l3 (Rev. 9 53) AECM 0240 W u. s. oovEmmasEMT PalNTING OFFICES l,74 336. tSe
- -