ML20210T105

From kanterella
Jump to navigation Jump to search
Informs of Auxiliary & Power Conversion Sys Branch Review of Amends 25 & 26 to PSAR Re Design Changes.Request for Addl Info Re Proposed Arrangement of Diesel Fuel Oil Storage Tanks Relative to Fire Protection Encl.W/O Encl
ML20210T105
Person / Time
Site: Satsop
Issue date: 12/24/1975
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Deyoung R
Office of Nuclear Reactor Regulation
References
CON-WNP-1661 NUDOCS 8605290721
Download: ML20210T105 (1)


Text

(Lgksf

[f I

DISTRIBUTION:

Docket File NRR Reading DEC 2 41975 CS Reading APCSB Reading Docket Nos. S l

R. C. DeYoung, Assistant Director for Light Water Reactors, Group 1 EL l

t AITIILIARY AND POWER CONVERSION SYSTEMS BRANCH, REQUEST POR J

ADDITIONAL INFORMATION t

Plant Name: WPPSS Nuclear Project No. 3 and No. 5 Licensing Stage: CP Docket Numbers: STN 50-508; STN 50-509 l

Milentone Number: 12-02 Responsible Branch: LWR l-3 Project Manager:

A. Bournia The Auxiliary and Power Conversion Systems Branch has reviewed Amendments 25 and 26 of the PSAR regarding design changes in the WPPSS 3 and 5 plants.

i Enclosed is our position in rerard to the proposed diesel fuel oil 6

storage tanks arrangement relative to fire protection of the essential equipment.

Robert L. Tedesco, Assistant Director for Containment Safety Division of Technical Review

Enclosure:

As Stated cc:

S. Hanauer, TA W. Mcdonald, MIPC R. Boyd, RL R. Heinessen, TR r

O. Parr, RL l

V. Benaroya, APCSB A. Bournia, RL i

D. Fischer, AFCSB l

P. Matthews, APCSB h52l DOCK 05000508 O721 751gg4 n C C. Lians, APCSB F

PDR D. Eisenhut, NRR i

I i

APCS.B:C TR CS:

APCSB:CS:T_R @APCSB:CS:T f._

o,,,c,

  • CLiang:mc g,PMAtth ys D

r rte do

.u...,*

c 12/24 /75 12/2y/75

.l.

/75 12p /75_

I Form AEC.)l3 (Rev. 9 53) AECM 0240 W u. s. oovEmmasEMT PalNTING OFFICES l,74 336. tSe

- -