Informs That Final Rept on Deficiency Rept DER 86-30 Will Not Be Submitted Until 870227.Time Extension Needed to Address Transportability of Issues Re Fuses,Terminal Blocks & Wire
ML20212D432
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 02/19/1987
From: Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-40157-JGH, DER-86-30, NUDOCS 8703040117
Download: ML20212D432 (2)


Text

.

~

Arizona Nuclear Power Project P.O. BOX 52034 e AHOENIX, ARIZONA 85072-2034 ANPP-40157-JGH/DJW/DRL-92.11 February 19, 1987 U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 5

m Attention:

Mr. D. F. Kirsch, Director m Q y

Division of Reactor Safety and Projects

_O_

N 20 Palo Verde Nuclear Generating Station (PVNGS)

S W :;o _A O<

Unit 3 Docket Nos. 50/530 o

Subject:

Time Extension - DER 86-30 tn A 50.55(e) Potentially Reportable Deficiency Relating To Fuses,#

Terminal Blocks, and Wire May Be Unqualified File: 87-006-216 References (A) Telephone conversation between R. C. Sorenson and D. R. Larkin on November 4, 1986.

(Initial Notifiestion - DER 86-30)

(B) ANPP-39135, dated November 24, 1986.

(Interim Report - DER 86-30)

(C) ANPP-39828, dated January 23, 1987.

(Time Extension - DER 86-30)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), an interim report by Reference (B), and a time extension by Reference (C).

At that time, it was estimated that a final report would be available by February 19, 1987.

Due to the extensive investigation and evaluation required to address the transpor-tibility of these issues, a time extension is needed.

It is now expected that this information will be finalized by February 27, 1987, at which time a complete report will be submitted.

Very truly yours, N' y J. G. Haynes Vice President Nuclear Production JGH/DRL:1df Attachment 8703040117 870219 PDR ADOCK 05000530 S

PDR cc: See Page Two Z E.2 1

~

.3.f

-, 1 1

e

(

3

' DER 86 Time Extension

'Mr..D. F. Kirsch

Director

-Page Two-

- February 19 1987

- ANPP-40157_-JGH/DJW/DRL-92.11' cc s _

J. M. Taylor

. Office of Inspection and Enforcement U. S._ Nuclear Regulatory Commission

-Washington, D. C.

20555

~ ~

A. C.'Gehr (4141)

- R. P. Zimmerman-(6295)

Records Center Institute of Nuclear Power' Operations.

~ 1100 circle 75 Parkway - Suite 1500 Atlanta, Georgia ~ 30339 1

<?

1 y

T-

'w---*

7gWevw--

y M.-.gp-w y-9y m*=,,e g

yyg--

59 9 e WT vrr-M N-

  • i-w'-#

vt rw4v-=

-C"'t'Nv'"T--~*v'*eW w

F G=

9 F#'l' P--T V-PT