TXX-4961, Interim Deficiency Rept CP-85-26 Re Steam Generator Upper Lateral Restraint Embedment Design.Initially Reported on 850719.Evaluation Expanded to Address Tera & S&W Comments. Next Rept Will Be Submitted by 861103

From kanterella
Revision as of 06:31, 4 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Interim Deficiency Rept CP-85-26 Re Steam Generator Upper Lateral Restraint Embedment Design.Initially Reported on 850719.Evaluation Expanded to Address Tera & S&W Comments. Next Rept Will Be Submitted by 861103
ML20212L209
Person / Time
Site: Comanche Peak  
Issue date: 08/18/1986
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-85-26, TXX-4961, NUDOCS 8608250249
Download: ML20212L209 (1)


Text

Log # TXX-4961 File # 10110 903.8 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 N()RTH OLIVE NTREET. L.B. El

  • DAILAN. TEXAB 75301 August 18, 1986

$$UA.*0."E*lA Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET N0. 50-445 UPPER LATERAL RESTRAINT EMBEDMENT DESIGN SDAR: CP-85-26 (INTERIM REPORT)

Dear Mr. Johnson:

On July 19, 1985, we verbally notified your Mr. D. Powell of a deficiency regarding the Unit 1 steam generator upper lateral restraint embedment design.

This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). Our last interim report was logged TXX-4877, dated June 27, 1986. On August 15, 1986, we requested and received an extension until August 18, 1986, in submitting this report from your Mr. D.

Hunnicutt.

Our evaluation of this issue has been expanded to address the comments of the third-party review organization (TERA) and Stone and Webster Engineering (SWEC). We anticipate submitting our next report by November 3, 1986.

Very truly yours, i

biz[

W. G. Counsil By:

//

l Manager,Nuc@v/_icensing G.

S'. Keeley JCH/arh

/

c - NRC Region IV (0 + 1 copy)