Forwards Reactor Sys Branch Sser Re TMI Item II.K.3.18 Re Mods to Automatic Depressurization Sys.Conceptual Design Acceptable,Subj to Listed Conditions
ML20213E542
Person / Time
Site: Columbia 
Issue date: 08/09/1983
From: Houston R
Office of Nuclear Reactor Regulation
To: Novak T
Office of Nuclear Reactor Regulation
References
CON-WNP-0628, CON-WNP-628, TASK-2.K.3.18, TASK-TM NUDOCS 8308170160
Download: ML20213E542 (2)


Text

,

AUG 0 91983 Docket No.:

50-397 MEMORANDUM FOR: Thomas Novak, Assistant Director for Licensing. DL FROM:

R. Wayne Houston, Assistant Director for Reactor Safety, DSI

SUBJECT:

SUPPLEMENTAL SAFETY EVALUATION REPORT (WNP-2)

Plant Name:

WPPSS Nuclear Project No. 2 Docket Number:

50-397 Licensing Stage:

OL Responsible Branch:

Licensing Branch f2 Project Manager:

R. Auluck DSI Branch Involved: Reactor Systems Branch Enclosed is the Reactor Systems Branch SSER with regard to THI Action Plan Item II.K.3.18 at WNP-2. The conceptual design proposed by the applicant is acceptable.

R. Wayne Houston, Assistant Director for Reactor Safety Division of Systems Integration

Enclosure:

As stated DISTRIBUTION cc:

R. Mattson N

D. Eisenhut RSB Rdg.

A. Schwencer RSB Plant R. Auluck TCollins Section 8 Members, RSB Collins Rdg.

RSB Section Leaders WHodges BSheron AD/RS Rdg.

CONTACT:

T. Collins, x24478 l

b

'A T7

\\

8308170160 830009 i

\\

c5 ADOCK 05000397 l

b h I'

,i RSB:DS h.RSB:DSI

~

.G, S

I ADRS:p 'on RWHburt

~ ~ > TCollins:cs WHodges rn l " " ~ 8/c) /83 8/}/83 8/{/83 8/ /83

SAFETY EVALUATION REP,0RT WNP-2 TMI ITEM II.K.3.18 In a letter dated July 26, 1983, from G.

Bouchey to the Director, NRR, the Washington Public Power Supply System committed to modifying the Automatic Depressurization System (ADS) at the WNP-2 plant.

The design modification will bypass the high dry-well pressure trip portion of the existing ADS logic and also add a manually operated inhibit switch.

This modification is Option 2 of the BWR Owners Group Report provided in reference 1 and has been approved by the staff as discussed in reference 2.

The applicant's conceptual design is acceptable to us with the following conditions:

(1) Use of the manual inhibit switch must be addressed in the plant emergency procedures; (2) surveillance requirements for the inhibit switch must be included in the plant technical specifications; and (3) the modifications must b e c o m--

plete prior to startup f'o l l o w i n g the first refueling outage.

References 1.

Letter from T.

J.

Dente toD. G.

Eisenhut, "NUREG-0737 Item II.K.3.18e Modification of Automatic Depressurization System Logier" dated October 28, 1982 2.

Memorandum from R.

W.

Houston to G.

Lainase " Evaluation of BWR Owners Group Generic Response to Item II.K.3.18 of NUREG-0737, Modification of Automatic Depressurization System Logic," dated April 1,

1983