ML20213E542

From kanterella
Jump to navigation Jump to search
Forwards Reactor Sys Branch Sser Re TMI Item II.K.3.18 Re Mods to Automatic Depressurization Sys.Conceptual Design Acceptable,Subj to Listed Conditions
ML20213E542
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/09/1983
From: Houston R
Office of Nuclear Reactor Regulation
To: Novak T
Office of Nuclear Reactor Regulation
References
CON-WNP-0628, CON-WNP-628, TASK-2.K.3.18, TASK-TM NUDOCS 8308170160
Download: ML20213E542 (2)


Text

,

AUG 0 91983 Docket No.: 50-397 MEMORANDUM FOR: Thomas Novak, Assistant Director for Licensing. DL FROM: R. Wayne Houston, Assistant Director for Reactor Safety, DSI

SUBJECT:

SUPPLEMENTAL SAFETY EVALUATION REPORT (WNP-2)

Plant Name: WPPSS Nuclear Project No. 2 Docket Number: 50-397 Licensing Stage: OL Responsible Branch: Licensing Branch f2 Project Manager: R. Auluck DSI Branch Involved: Reactor Systems Branch Enclosed is the Reactor Systems Branch SSER with regard to THI Action Plan Item II.K.3.18 at WNP-2. The conceptual design proposed by the applicant is acceptable.

R. Wayne Houston, Assistant Director for Reactor Safety Division of Systems Integration

Enclosure:

As stated DISTRIBUTION cc: R. Mattson N D. Eisenhut RSB Rdg.

A. Schwencer RSB Plant R. Auluck TCollins Section 8 Members, RSB Collins Rdg.

RSB Section Leaders WHodges BSheron AD/RS Rdg.

CONTACT: T. Collins, x24478 l

b 'A T7

\ i 8308170160 830009 l

\ c5 ADOCK 05000397

,i b h I' ~

.G, RSB:DS h .RSB:DSI S I ADRS:p 'on

~ ~ > TCollins:cs WHodges rn RWHburt l " " ~ 8/c) /83 8/}/83 8/{/83 8/ /83

SAFETY EVALUATION REP,0RT

-

  • WNP-2 .,

TMI ITEM II.K.3.18 In a letter dated July 26, 1983, from G. Bouchey to the Director, NRR, the Washington Public Power Supply System committed to modifying the Automatic Depressurization System (ADS) at the WNP-2 plant. The design modification will bypass the high dry-well pressure trip portion of the existing ADS logic and also add a manually operated inhibit switch. This modification is Option 2 of the BWR Owners Group Report provided in reference 1 and has been approved by the staff as discussed in reference 2.

The applicant's conceptual design is acceptable to us with the following conditions: (1) Use of the manual inhibit switch must be addressed in the plant emergency procedures; (2) surveillance requirements for the inhibit switch must be included in the plant technical specifications; and (3) the modifications must b e c o m--

plete prior to startup f'o l l o w i n g the first refueling outage.

References

1. Letter from T. J. Dente toD. G. Eisenhut, "NUREG-0737 Item II.K.3.18e Modification of Automatic Depressurization System Logier" dated October 28, 1982
2. Memorandum from R. W. Houston to G. Lainase " Evaluation of BWR Owners Group Generic Response to Item II.K.3.18 of NUREG-0737, Modification of Automatic Depressurization System Logic," dated April 1, 1983