Forwards Insp Rept 50-482/87-18 on 870713-17 & 0803-07.No Violations or Deviations Noted.One Unresolved Item Identified in Rept.Actions Taken Re Previously Identified Insp Findings Also Examined
ML20235A831
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/17/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20235A834 List:
References
REF-GTECI-A-26, REF-GTECI-RV NUDOCS 8709230434
Download: ML20235A831 (2)


See also: IR 05000482/1987018

Text

__ _ _ -

_.

_ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _

_ _ ___ __

w

s'

.

In Reply Refer To:

1 Docket:

50-482/87-18

E II E

Wolf Creek Nuclear Operating Corporation

ATTN: Bart D. Withers

President and Chief Executive Officer

P. O. Box 411

Burlington, Kansas

66839

. Gentlemen:

.This refers'to the inspection conducted by Messrs. R. C. Stewart, and G. A.

Pick of this office during the period July 13-17 and August 3-7, 1987, of

activities authorized by NRC Operating License NPF-42 for the Wolf Creek

Generating Station, and to the discussion of our findings with members of your

staff at the conclusion of the inspection.

Areas examined during the inspection included followup of licensee-event

reports, temporary procedure followup and design, design changes and

modifications. Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with

personnel, and observations by the NRC inspectors. The inspection findings are

documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

One unresolved item is identified in paragraph 3.of the enclosed inspection

report.-

We have also examined actions you have taken with regard to previously

identified inspection findings. . The status of these items is~ identified in

paragraph 2 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

'

Sincerely.

.

l

J. E. Gagliardo, Chief

Reactor Projects Branch

l

l

Enclosure:

(seenextpage)

RIV:RSB/0

05 h

RPB

RSB

RPB

RCStewart

DMHunnicutt

DRH

er

RTFWesterman

JEGa 1

-

) /<3 /87

[Q/9/87

9/9/87

//97/87

j/

/r

l

8709230434 870917

p0 /

PDR

ADOCK 05000482-

G

PDR

6

.

_

-

_

-

. _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ - - - _ _ - _ _ _ _ _ -

__

__

,

v

-

k.

Wolf 'Crt.ek Nuclear :

-2-

.0perating Corporation

Enclosure:

)

Appendix - NRC Inspection Report

j

S0-482/87-18.

'

cc w/ enclosure:;

.

,

Wolf Creek Nuclear 0perating Corporation

l

. ATTN:' 0tto Maynard, Manager

'

of Licensing

P. O. Box 411

Burlington, Kansas

166839

t

Gary Boyer, Plant Manager

Wolf Creek-. Nuclear Operating Corporation

P. 0. Box 411'

Burlington, Kansas ~

66839

- Robert D. Elliott,: Chief Engineer

Kansas Corpor6 tion Commission:

Fourth Floor. Docking State Office Building

-Topeka, Kansas

66612-1571

'

Kansas Radiation Control . Program Director

.bcc to DMB (IE01)

bec distrib. by RIV:-

  • RPB

MyronKarman, ELD,MNBB(1)

  • RRI-

.

R. D. Martin, RA

  • SectionChief(RPB/B)

DRSP

RPSB

W. L. Forney, RIII

  • RIV File

Resident Inspector, RIII

  • MIS System-
  • RSB
  • RSTS Operator
  • Project Inspector, RPB
  • D. Weiss, kM/ALF
  • R. Hall
  • R. Stewart
  • P. O'Connor, NRR Project Manager
  • G. Pick

SectionChief(RSB/0S)

  • R.-Vickrey
  • w/766

_ - _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ - _ - -