TXX-6773, Forwards Wg Counsil 870923 Cover Ltr & Impell Calculations & Position Papers,Including Rev 0 to IM-P-011, Unbraced Lengths Used to Evaluate Lateral Torsional Buckling of Trapeze Support Post Members, as Requested by Cygna
| ML20235F610 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/23/1987 |
| From: | Counsil W, Keeley G TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20235F613 | List:
|
| References | |
| TXX-6773, NUDOCS 8709290233 | |
| Download: ML20235F610 (3) | |
Text
.
(-
e l
==
Log # TXX-6773 1
2 File #~10068
.-T C'
10010 clo 1UELECTRIC g
wmism c. counsit September 23, 1987 Executive Vice President i'
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.'C.
20555 I-
SUBJECT:
'COMANCllE PEAVs STEAM ELECTRIC STATION.(CPSES)
DOCKET N05. 50-445 AND 50-446 DOCUMENTS REQUESTED BY CYGNA
' Gentlemen:
Attached are 15 copies of the letter dated September 23, 1987,;from W. G.
Counsil to N. II. Williams (with enclosures), transmitting information requested by CYGNA.
The Atomic Safety and Licensing Board will be notified of the transmittal by a separate letter from our attorney.
L Very truly yours, 1d W. G. Counsil By:
b,
.s_-
r G. S. Keeley i
Manager, Nuclear Lics ing JDS/mgt Attachmen; c-Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) b
/
8709290233 870923 PDR ADOCK 05000445 I
A PDR jp l
400 North Olive Street LB 8I Dallas. Texas 75201 l
4 M
lllllllll' ':lllllllll Log # TXX-6772 File # 2260 10068 clo it/ ELECTRIC
["j' [l"j, September 23, 1987 CYGNA Energy Services AlTN: Ms. N. H. Williams, Project Manager Comanche Peak Project 2121 N. California Blvd.
Suite 390 Walnut Creek, CA 94596
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) i TRANSMITTAL OF DOCUMENTS REQUESTED BY CYGNA
Dear Ms. Williams:
Enclosed please find three copies of the following documents:
Impell Document Related Generic Issue Calculation B-04 Rev. O Issue 4 B Calculation M-12 Rev. 3 Issue 7 Calculation M-27 Rev. 2 Issue 19 Calculation M-39 Rev. 2 Issue 21 D Calculation M-59 Rev. 2 Issue 16 G Calculation M-65 Rev. 2 Issue 9 Position Paper IM-P-011, Issue 14 B "Unbraced Lengths Used to Evaluate Buckling of Trapeze Support Post Members" Position Paper IM-P-012, Issue 26 B
" Stress Evaluation of Angles" Position Paper IM-P-013, Issue 18
" Justification for Use of Rigid Clamp Stiffnesses" 400 North Ohve Street LB 81 Dntlas. Tens 75201
~
D t
Calculation M-15 Rev. 3 Issue 26 B Calculation M-28 Rev. 3
- This document was requested by CYGNA during an audit at the Impell office in Walnut Creek. (8/4/87 - 8/6/87)
Very truly yours, GY W. G. Counsil l
^
By:
z.
G. S. Keeley &
-/-
Manager, Nuclear Lfgsnsing JDS/mgt Enclosures
- ~ ~ ~ ~ ' - ' ~ ~ ~
'~