May 15, 1998
Southern Nuclear Operating Company. Inc.
ATTN: Mr. C. K. McCoy
Vice President
Vogtle Electric Generating Plant
P. O. Box 1295
Birmingham AL 35201
SUBJECT:
NRC INTEGRATED INSPECTION REPORT NOS. 50-424/98-03 AND
50-425/98-03 AND NOTICE OF VIOLATION
Dear Mr. McCoy:
On April 18, 1998, the NRC completed an inspection at your Vogtle Units _1 and
2 reactor facilities.
The enclosed report presents the results of that
inspection.
During the 6-week period your conduct of activities at the Vogtle facility
was generally characterized by safety-conscious operations, sound engineering
and maintenance practices, and appropriate radiological work controls.
Based on the results of this inspection. certain of your activities a)peared
to be in violation of NRC requirements, as specified in the enclosed lotice of
Violation (Notice).
In addition, the enclosed Inspection Report identifies
,
activities that violated NRC requirements that will not be subject to
'
enforcement action because the licensee's efforts in identifying and/or
l
correcting the violations meet the criteria specified in Section VII.B of the
'
These violations are cited in the enclosed Notice of Violation (Notice), and
i
the circumstances surrounding the violation are described in detail in the
i
enclosed report.
Please note that you are required to respond to this letter
and should follow the instructions specified in the enclosed Notice when
preparing your response.
The NRC will use your response, in part, to
i
determine whether further enforcement action is necessary to ensure compliance
{
with regulatory requirements.
\\ \\
9905220191 980515
4
ADOCK 05000424
G
_ _ -____-_____-____________
Y
_ _ _ _ _ _
_ _ _ _ _ _ _ _
_
- _ .
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ -
l
2
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a copy of
this letter, its enclosures, and any reply will be placed in the NRC Public
l
Document Room (PDR).
Sincerely.
(Original signed by Pierce H. Skinner)
Pierce H. Skinner. Chief
Reactor Projects Branch 2
Division of Reactor Projects
q
!
.
Docket Nos. 50-424 and 50-425
4
'
License Nos. NPF-68 and NPF-81
Enclosures:
1.
?
2.
NRC Integrated Inspection Report
50-424/98-03. 50-425/98-03
cc w/encls:
J. D. Woodard
Executive Vice President
Southern Nuclear Operating Company. Inc.
P. O. Box 1295
Birmingham, AL 35201-1295
J. B. Benley
General Manager Plant Vogtle
Southern Nuclear Operating Company. Inc.
P. O. Box 1600
Waynesboro. GA 30830
J. A. Bailey
Manager-Licensing
Southern Nuclear Operating Company. Inc.
,
P. O. Box 1295
Birmingham. AL 35201-1295
,
{
Director. Consumers' Utility Counsel Division
i
Governor's Office of Consumer Affairs
2 M. L. King. Jr. Drive
Plaza Level East: Suite 356
Atlanta, GA 30334-4600
l
Office of Planning and Budget
Room 6158
270 Washington Street. SW
Atlanta. GA 30334
'
cc w/encls cont'd:
(See Page 3)
.
_ - _ ___ _ _ _ _ - _
3
cc w/encls:
Office of the County Commissioner
Burke County Commission
Waynesboro. GA 30830
Director. Department of Natural Resources
205 Butler Street. SE. Suite 1252
Atlanta. GA 30334
Manager. Radioactive Materials Program
Department of Natural Resources
4244 International Parkway
Suite 114
Atlanta, GA 30354
Attorney General
Law Department
132 Judicial Building
Atlanta, GA 30334
'
Program Manager
Fossil & Nuclear Operations
Oglethor)e Power Corporation
j
2100 E.
Exchange Place
Tucker, GA 30085-1349
'
Charles A. Patrizia. Esq.
Paul. Hastings. Janofsky & Walker
10th Floor
1299 Pennsylvania Avenue
D. C.
20004-9500
Senior Engineer - Power Supply
Municipal Electric Authority
of Georgia
1470 Riveredge Parkway NW
Atlanta, GA 30328-4684
l
1
Distribution w/ encl:
,
L. Plisco. RIl
i
l
P. Skinner. RII
M. Ernstes. RII
D. Jaffe. NRR
PUCLIC
Distribution w/encls cont'd:
(See Page 4)
i
,
- _ _ _ _ _ _ _ - _ _ _ _
4
Distribution w/encls:
Continued
NRC Senior Resident Inspector
U.S. Nuclear Regulatory Commission
8805 River Road
Waynesboro. GA 30830
i
- Ree arevious concurrence - attached
.
OFFICE
Ril:DRP
RII:DRP
All:DRP
Ril:DRP
RII:DRP
Ril;DRS ,
RlyS_
SIGilATURE
g /> {
{ y gjp
g "gp
IIAE
RPCarrion:Sta
JZeiler
MTWidnam
KF0'Donohue
IRFredette
WPRiefprge
gdfo
DATE
5/ g /W
5/
/95
5/
/95
5/
/95
5/
/95
5/ /b /95
Q5/,{y/95
uri r
/TES ) 11 0
YES
10 0
YES
11 0
YES
11 0
YES
11 0
YES ( 10 0 f
A
11 0
v
v
v
0FFICE
Ell:DRS
Ri {:DRS
S m ruRE
y
fjgs
IIAE
IRIerriweather
,1,C1 ttatjan
DATE
5/ sg /95
5f p /95
5/
/95
5/
/95
5/
/95
5/
/95
5/
/95
uri t
(YEy
11 0
( YE5
11 0
YES
11 0
YES
11 0
YES
11 0
YES
11 0
YES
11 0
0FilCIAL RECORD COPY ~
DOOMIII IIAIE.: G:\\V0 GILE \\V000311R.DFT
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
,
- ee - -
~~ - mm
n.
, .
5
Distribution w/encis: Continued
NRC Senior Resident Inspector
U.S. Nuclear Regulatory Commission
8805 River Road
Waynesboro. GA 30830
. _ _ .
_
onoureau
c.
p
FAX TRANSMIT AL
empe .
WRiso }Sl< tom 4k '"" % FRabErfE
- "*"' psp: APEi
~' 9/2. 5 (,7 - 97P/
@c/-St.t- kl$l[
'"'
NSN ?!be041.817 73At
6099.101
GENERAL SERVOY$ AD14NISTRATION
l
OFFICE
Ell:DRP
RII DRP
RilrDRP
Rll:DRP
RT l:DRp , (
Ril:DR5
R!!:DRS
,
$105ATURE
) K
tlAIE
RPCarrion:dka
JZeiler
MTWieriann
Kf0'Donohue
gredette
WPKleinsorge
G8(uzo
DATE
5/
/95
5/
/98
5/
/95
5/
/95
5/ ( f /95
5/
/95
5/
/95
1
_______-___m
5
[
Distribution w/encls: Continued
'
,,
NRC Senior Resident Inspector
U.S. Nuclear Regulatory Comission
8805 River Road
Waynesboro, GA 30830
I
l
1
//
/
l/
/
i
/
!
/
'
/
I
/
/i
/
/
!
0FFICE
Ril:DRP
RII DRP
All:DRP
,
RII:DRP
all:DRP
RiltDR$
All:DRS
eWWE.
RPCarrion:dka, g ,%
g,Q W
y
51 M M E
j
JIsifer
NWidham
Kf0'0annhue
IRFredette
idPKleirmorge
G8Kuzo
l DATE
5/
/95
5/ 35 /98
5/ g{ /95
5/ 3 $ /95
5/
/95
5/
/98
5/
/Y5
1
TOTAL P.02
-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _