ML20248J602

From kanterella
Revision as of 14:47, 30 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted
ML20248J602
Person / Time
Site: River Bend 
Issue date: 06/05/1998
From: Collins E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mcgaha J
ENTERGY OPERATIONS, INC.
Shared Package
ML20248J604 List:
References
50-458-98-08, 50-458-98-8, NUDOCS 9806090210
Download: ML20248J602 (5)


See also: IR 05000458/1998008

Text

-

.

.

,

,

. . #'"GQ,I

UNITED STATES

t

NUCLEAR REGULATORY COMMISSION

k#

AEGION IV

g

.f

611 RYAN PLAZA DRIVE, SUITE 400

s

1

$

'#

9...../

AR LINGTON, TEXAS 76011-8064

I

JUN - 5 1998

John R. McGaha, Vice President - Operations

River Bend Station

Entergy Operations, Inc.

P.O. Box 220

St. Francisville, Louisiana 70775

SUBJECT: NRC INSPECTION REPORT 50-458/98-08

Dear Mr. McGaha:

From April 5 through May 16,1998, an NRC inspection was conducted at your River Bend

Station reactor facility. The enclosed report presents the scope and results of that inspection.

During the 6-week period covered by this inspection, your conduct of activities at the River Bend

facility was generally characterized by safety-conscious operations, sound engineering and

maintenance practices, and reliable plant support activities.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure (s), and your response will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

()

\\AV)

Elmo E. Collins, Chief

Project Branch C

Division of Reactor Projects

Docket No.:

50-458

License No.: NPF-47

Enclosure:

NRC Inspection Report

50-458/98-08

i

l~

9806090210 990605

PDR

ADOCK 05000458

G

PDR

.

L.

1

l

Entergy Or<eretions, Inc.

-2-

l-

'

cc w/ enclosure:-

Executive Vice President and

Chief Operating Omcer

Entergy Operatior.s, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Vice President

~ Operations Support

Entergy Operations, Inc.

P.O. Box 31995

I

Jackson, Mississippi 39286-1995

General Manager

Plant Operations

River Bend Station

I

Entergy Operations, Inc.

P.O. Box 220

St. Francisville, Louisiana 70775

Director - Nuclear Safety

River Bend Station

Entergy Operations, Inc.

P.O. Box 220

St. Francisville, Louisiana 70775

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, Mississippi 39205

Mark J. Wetterhahn, Esq.

Winston & Strawn

1401 L Street, N.W.

Washington, D.C. 20005-3502

Manager- Licensing

River Bend Station

Entergy Operations, Inc.

P.O. Box 220

' St. Francisville, Louisiana 70775

_ __.

.

_ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _

__

-

,

-

- _

_ _ _ . - _ _ - _ _

_ _ - _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ - - _ - - - _ - - _ _ - - _ _ _ _ _

.

F

Entergy Operaticns, Inc.

-3-

The Honorable Richard P. leyoub ~

- Attorney General

Department of Justice

State of Louisiana

P.O. Box 94005

. Baton Rouge, Louisiana 70804-9005

H. Anne Plettinger

3456 Villa Rose Drive

Baton Rouge, Louisiana 70806

' President of West Feliciana

- Police Jury.

P.O. Box 1921.

!

' St. Francisville, Louisiana 70775

William H. Spell,' Administrator

Louisiana Radiation Protection Division

P.O. Box 82135

Baton Rouge, Louisiana 70884-2135

'

--

-- _

-- - _ -

. _ _ _ - _ .

- _ - _ -

.:

.

Entergy Operations, Inc.

-4-

J.N - 5 1998

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

' E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

L

' bec to DCD (IE01)

bec distrib. by RIV:

' Regional Administrator

Senior Resident inspector (Grand Gulf)

DRP Director

DRS-PSB

Branch Chief (DRP/C)

MIS System

Project Engineer (DRP/C)

RIV File

' Branch Chief (DRP/TSS)

Resident inspector

!

..

l

,

!

i

i

l

DOCUMENT NAME: R:\\_RB\\RB808RP.GDR

To receive copy of occument, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RIV: SRI-

RIV:RI

CMINC

GDReplogie

NPGarrett

EEdollins

5/22/98

5/27/98

6/D /98

OFFICIAL RECORD COPY

,

i

____-____- - - - _ -

.

.

Entergy Operations, Inc.

-4-

JUN - 5 1998

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

}

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

j

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Senior Resident inspector (Grand Gulf)

DRP Director

DRS-PSB

Branch Chief (DRP/C)

MIS System

Project Engineer (DRP/C)

RIV File

Branch Chief (DRP/TSS)

Resident inspector

!

j

DOCUMENT NAME: R:\\_ RB\\RB808RP.GDR

To receive copy of document, indicate in box:"C" = Copy without enclosures "E" = Copy wdh enclosures "N" = No copy

RIV: SRI

RIV:RI

C M if/C l

l

GDReplogie

NPGarrett

EECollins

5/22/98

5/27/98

6/ 9 /98

OFFICIAL RECORD COPY

,

!

0000S5

!