ML23241A602

From kanterella
Revision as of 09:03, 25 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-5, Drawing 108005-5, Rev. 53, Sheet 5, Extraction Steam and Heater Drip System
ML23241A602
Person / Time
Site: Diablo Canyon  
Issue date: 05/25/2023
From:
Pacific Gas & Electric Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23241A052 List: ... further results
References
DCL-23-044
Download: ML23241A602 (1)


Text

50 51 52 53 55 56 E

D C

B NOTE :

I.

HTRS 5 8.:

6 ARE LOCATED IN CONDENSER NECK.

2.
  • I NDICATES PIPING BY IR ( I NGERSOLL RAND) UNDER SPEC.

8701.

3.

F IR ST LENGTH OF P I PE AND ELBOW DOWNS TREAM OF XS 662 I S PI PE SPEC L I. (REF.

CO I 82595) 4.

FAC RES I STANT CLADDING ALLIED INSIDE NOZZLE N5 REF.

ATMM AR" A0638404. ~<JE[)~

03-06-2009 ADMI F xC 2 KERSI J. DALAL MECHANICAL M 16690 3/31/2010 REVISED PER DOT - 4.,273 - 0 DA l ~

p.

57 UN I T 2 58 59 DIABLO CANYON POWER PLANT - PG&E CO.

EXTRACTION STEAM ANO HEATER DR IP SYSTEMS DRAWI NG SHEET PAGE REV 108005 5

0 53 E

D C

B A