Inspection Manual Change Notice 23-036,

From kanterella
Revision as of 07:28, 25 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Inspection Manual Change Notice 23-036
ML23348A370
Person / Time
Issue date: 12/14/2023
From: Madeleine Arel
NRC/NRR/DRO/IRIB
To:
References
CN 23-036
Download: ML23348A370 (1)


Text

Issue Date: 12/14/23 1

23-036 NRC INSPECTION MANUAL IRIB CHANGE NOTICE 23-036 DELETED:

TRANSMITTED:

Number Date Number Date

1.

IMC 0309 10/28/11 IMC 0309 12/14/23 TRAINING:

No special training is required for any documents issued with this Change Notice.

REMARKS:

IMC 0309, "Reactive Inspection Decision Basis for Power Reactors." Added a 7-day time requirement for completing MD 8.3 evaluations. Implemented OIG-23-A-06 audit (ML23130A375) recommendations 1 and 2 as accepted by management in (ML23157A268 non-public) to publicly share non-sensitive reactive inspection decisions [C1] and to provide examples [C2]. Added guidance for charter development and allegations. Reorganized and reformatted.

EDITORIAL REVISIONS FROM PREVIOUS CHANGE NOTICES (As Required):

DISTRIBUTION:

Standard Official Use Only (OUO)-Security Related Information.

Please contact: _______________ Phone: ________

END