Inspection Manual Change Notice 00-005,

From kanterella
Revision as of 07:46, 13 November 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Inspection Manual Change Notice 00-005
ML23318A394
Person / Time
Issue date: 04/04/2000
From:
NRC/NRR/DRO/IRIB
To:
Shared Package
ML23318A393 List:
References
CN 00-005
Download: ML23318A394 (1)


Text

UNITED*STATES NUCLEAR REGULATORY. COMMISSION WASHINGTON, D.C. 20555-0001

  • NRC. INSPECTION MANUAL IIPB
  • Change Notice 00-005

DELETED: TRANSMITTED:

Number Number Date Date

1. IMC 2515. App C 04/03/00 IMC 2515, App C 04/04/00
2. IP 62700 06/03/97 IP 62700 04/04/00
3. IP 71153 04/03/00 IP 71153 04/04/00
4. IP 87102 11/20/94 IP 87102. 04/04/00
5. IP 92050 01/01/83 IP 92050 04/04/00 6. TI 2515/144 0.4/04/00

TRAINING: No special training requirements have been identified for any documents issued with this change notice.

REMARKS: IMC 2515. Appendix C (Special and Infrequently Performed Inspections) has been revised to include IP 92050 for use by Region II in the inspection of Browns Ferry L Watts Bar 2. and Bellefonte plants..

incorporate the elements contained in IPs 62702. 62703, 62704, and IP 62700 (Maintenance Program Implementation) is revised to 62705. IP 62700 is issued as part of the Supplemental Inspection P_rogram as defined in IMC 2515, Appendix B..

IP 71153 (Event Followup) is revised to provide inspection requirements and guidance.for review of event r~ports.

IP 87102 (Maintaining Effluents From Materials Facilities As Low As of the 10 CFR 20.llOl(d) constraint rule and minor changes to Is Reasonably Achievable (ALARA)) is revised to include the addition the Appendix.

Delay) has been revised for use by Region II in the inspection of IP 92050 (Review of Quality Assurance For Extended Construction Browns Ferry 1, Watts Bar 2. and Bellefonte plants.

  • Issue Date: 04/04/00 - 1 - 00-005 TI 2515/144 (Performance Indicator Data Collecting and Reporting Process Review) is issued to review a licensee's* performance indicator data collecting and reporting process to determine whether the licensees are appropriately implementing the NRC/Industry *
  • guidance.

DISTRIBUTION: Standard

END

  • I

00-005 2 - Issue Date: 04/04/00 *