Inspection Manual Change Notice 00-005,

From kanterella
Jump to navigation Jump to search
Inspection Manual Change Notice 00-005
ML23318A394
Person / Time
Issue date: 04/04/2000
From:
NRC/NRR/DRO/IRIB
To:
Shared Package
ML23318A393 List:
References
CN 00-005
Download: ML23318A394 (1)


Text

UNITED*STATES NUCLEAR REGULATORY. COMMISSION WASHINGTON, D.C. 20555-0001 NRC. INSPECTION MANUAL IIPB Change Notice 00-005 DELETED:

TRANSMITTED:

Number Number

1.

IMC 2515. App C Date 04/03/00 06/03/97 04/03/00 11/20/94 01/01/83 IMC 2515, App C IP 62700 Date 04/04/00 04/04/00 04/04/00 04/04/00 04/04/00 0.4/04/00

2.

IP 62700

3.

IP 71153

4.

IP 87102

5.

IP 92050 6.

IP 71153 IP 87102.

IP 92050 TI 2515/144 TRAINING:

No special training requirements have been identified for any documents issued with this change notice.

REMARKS:

IMC 2515.

Appendix C (Special and Infrequently Performed Inspections) has been revised to include IP 92050 for use by Region II in the inspection of Browns Ferry L Watts Bar 2. and Bellefonte plants.

IP 62700 (Maintenance Program Implementation) is revised to incorporate the elements contained in IPs 62702. 62703, 62704, and 62705.

IP 62700 is issued as part of the Supplemental Inspection P_rogram as defined in IMC 2515, Appendix B.

IP 71153 (Event Followup) is revised to provide inspection requirements and guidance.for review of event r~ports.

IP 87102 (Maintaining Effluents From Materials Facilities As Low As Is Reasonably Achievable (ALARA)) is revised to include the addition of the 10 CFR 20.llOl(d) constraint rule and minor changes to reflect current enforcement policy and to update EPA addresses in the Appendix.

IP 92050 (Review of Quality Assurance For Extended Construction Delay) has been revised for use by Region II in the inspection of Browns Ferry 1, Watts Bar 2. and Bellefonte plants.

Issue Date:

04/04/00 00-005

TI 2515/144 (Performance Indicator Data Collecting and Reporting Process Review) is issued to review a licensee's* performance indicator data collecting and reporting process to determine whether the licensees are appropriately implementing the NRC/Industry

  • guidance.

DISTRIBUTION: Standard END 00-005 2 -

Issue Date:

04/04/00