ML24178A393

From kanterella
Revision as of 02:38, 28 August 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Email Transmitting Revised NRC Form 898 for Dwo LTR
ML24178A393
Person / Time
Site: 05200050
Issue date: 06/27/2024
From: Getachew Tesfaye
NRC/NRR/DNRL/NRLB
To:
NuScale
Tesfaye, G., NRR/DNRL, 301-415-8013
Shared Package
ML24178A391 List:
References
EPID L-2022-TOP-0019
Download: ML24178A393 (1)


Text

Getachew Tesfaye

From: Getachew Tesfaye Sent: Thursday, June 27, 2024 8:02 PM To: Regulatory Affairs Cc: Griffith, Thomas; Sfowler@nuscalepower.com; Lynn, Kevin; Dennis Galvin; Mahmoud -MJ- Jardaneh; Stacy Joseph

Subject:

DWO LTR Revised Completeness Determination - NRC Form 898 Attachments: DWO NRC 898 for Updated Resource Estimate and RAI Schedule Final.pdf

Attached please find the revised completed NRC Form 898 for the U.S. Nuclear Regulatory Commission staff Licensing Topical Report (LTR) Completeness Determination for NuScale Power, LLC Topical Report TR-131981, Methodology for the Determination of the Onset of Density Wave Oscillations (DWO), Revision 1.

The LTR was submitted by letter dated July 17, 2023 (Agencywide Documents Access and Management System [ADAMS] Accession Nos. ML23198A244 [p roprietary] and ML23198A245 [nonproprietary]).

The revised schedule for issuing request for additional information and the revised resource estimate was discussed with your staff, Thomas Griffith, on June 26, 2024.

Thank you, Getachew Tesfaye (He/Him)

Senior Project Manager NRC/NRR/DNRL/NRLB 301-415-8013

1