ENS 57181
ENS Event | |
---|---|
20:40 Jun 18, 2024 | |
Title | Inoperability of Division 3 Diesel Generator Supporting High Pressure Core Spray |
Event Description | The following information was provided by the licensee via phone and email:
At 1640 EDT on 06/18/2024, the division 3 diesel generator was declared inoperable. This condition could prevent the fulfillment of a safety function; therefore, this condition is being reported as an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(v)(D). All other emergency core cooling systems were operable during this time. There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified. The division 3 diesel generator was declared inoperable due to potential water intrusion into the electrical generator. Inspection of the generator is in progress. The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance: This event resulted in Perry Unit 1 entering a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> limiting condition for operation (LCO) in accordance with Technical Specification 3.8.1. condition 'B'.
Investigation and assessment of the division 3 diesel generator exciter and generator as-found condition revealed that no water intrusion occurred and, therefore, would not have impacted the diesel generator's ability to start, run, and produce the required electrical power to perform its required safety function. Therefore, EN 57181 is being retracted. The NRC resident inspector has been notified of the Event Notification retraction. Notified R3DO (Feliz-Adorno) |
Where | |
---|---|
Perry Ohio (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
Time - Person (Reporting Time:+18.45 h0.769 days <br />0.11 weeks <br />0.0253 months <br />) | |
Opened: | Robert Mcclary 15:07 Jun 19, 2024 |
NRC Officer: | Tenisha Meadows |
Last Updated: | Aug 15, 2024 |
57181 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 57181\u003C/a\u003E - \u003Ca href=\"/Perry\" title=\"Perry\"\u003EPerry\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EInoperability of Division 3 Diesel Generator Supporting High Pressure Core Spray\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 57181 - Perry\n","link":"","lat":41.79572777777778,"lon":-81.145375,"icon":"/w/images/a/ad/FirstEnergy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (88 %) |
After | Power Operation (88 %) |