ENS 55973

From kanterella
Revision as of 16:01, 4 January 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
ENS 55973 +/-
Where
Grand Gulf Entergy icon.png
Mississippi (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-1.63 h-0.0679 days <br />-0.0097 weeks <br />-0.00223 months <br />)
Opened: Paul Lyne
18:07 Jun 30, 2022
NRC Officer: Brian P. Smith
Last Updated: Jun 30, 2022
55973 - NRC Website
Loading map...