ML20261H460
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML20261H460 | |
Person / Time | |
---|---|
Site: | Consolidated Interim Storage Facility |
Issue date: | 09/02/2020 |
From: | Consolidated Interim Storage Facility |
To: | Division of Fuel Management |
Shared Package | |
ML20261H419 | List: |
References | |
E-57342 | |
Download: ML20261H460 (1) | |
Similar Documents from Consolidated Interim Storage Facility | |
---|---|
Category:Report
MONTHYEARML21105A7852021-04-12012 April 2021
[Table view]Some use of "" in your query was not closed by a matching "".Enclosure 5: Wsc Consolidated Interim Storage Facility, Revision 4 to License Application - Public Version ML21105A7592021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 12 of 17) - Public Version, Chapter 2, Attachment F, Occurrence of Gypsum at the WCS Site, 2 of 3 ML21105A7602021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 10 of 17) - Public Version, Chapter 2, Attachment E, Geotechnical Investigation for WCS CISF ML21105A7612021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 8 of 17) - Public Version, Chapter 2, Attachment C, Boring Logs ML21105A7622021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 9 of 17) - Public Version, Chapter 2, Attachment D, Seismic Hazard Evaluation for WCS CISF ML21105A7632021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 11 of 17) - Public Version, Chapter 2, Attach F, Evaluation of Halite Dissolution in the Vicinity of Waste Control Specialists Disposal Site, ML21105A7642021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 13 of 17) - Public Version, Chapter 2, Attachment F, Compensated Neutron Formation Density, 3 of 3 ML21105A7652021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 7 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles Anteceden ML21105A7672021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report, (Part 5 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles, 3 of 5 ML21105A7772021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 6 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the Developed Low Level & Byproduct Facility 500-Year ML21105A7792021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 14 of 17) - Public Version, Chapter 2, Attachment G, Technical Specifications for Towers ML21105A7802021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 1 of 17) - Public Version, Cover to Chapter 2 ML21105A7822021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 3 of 17) - Public Version, Chapter 2, Attachment B, Flood Plain Report, 1 of 5 ML21105A7922021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 16 of 17) - Public Version, Chapters 3 to 15 ML21105A7972021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 4 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 100-Year Water Surface Profile, 2 of 5 ML21105A7712021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 15 of 17) - Public Version, Chapter 2, Attachment H, Compiled Meteorological and Climatology Data ML21027A1472021-01-27027 January 2021 Supplemental Information Part 2 to Support Nrc'S Continued Review of the Safety Case for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 ML21014A0632021-01-14014 January 2021 Interim Storage Partners, LLC - Submittal of Supplemental Information to Support Nrc'S Continued Review of the Safety Case for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 ML20261H4682020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapters 3 to 15 ML20261H4222020-09-0202 September 2020 WCS CISF - Affidavit ML20261H4522020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Cover to Chapter 2 ML20261H4542020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, Flood Plain Report, 1 of 5 ML20261H4552020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 100-Year Water Surface Profile, 2 of 5 ML20261H4562020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles, 3 of 5 ML20261H4572020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the Developed Low Level & Byproduct Facility 500-Year and PMP Water Surface Profiles Profiles, 4 of 5 ML20261H4582020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model or the Calculation of the 500-Year and PMP Water Surface Profiles Antecedent Moisture Condition III, 5 of 5 ML20261H4592020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment C, Boring Logs ML20261H4602020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment D, Seismic Hazard Evaluation for WCS CISF ML20261H4612020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment E, Geotechnical Investigation for WCS CISF ML20261H4632020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Evaluation of Halite Dissolution in the Vicinity of Waste Control Specialists Disposal Site, Andrews County, Tx, 1 of 3 ML20261H4642020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Occurrence of Gypsum at the WCS Site, 2 of 3 ML20261H4652020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Compensated Neutron Formation Density, 3 of 3 ML20261H4662020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment G, Technical Specifications for Towers ML20261H4672020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment H, Compiled Meteorological and Climatology Data ML20101P4062020-03-31031 March 2020 Draft RAI Responses with Associated SAR Change Pages 2021-04-12 Category:Technical MONTHYEARML21105A7852021-04-12012 April 2021
[Table view]Some use of "" in your query was not closed by a matching "".Enclosure 5: Wsc Consolidated Interim Storage Facility, Revision 4 to License Application - Public Version ML21105A7592021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 12 of 17) - Public Version, Chapter 2, Attachment F, Occurrence of Gypsum at the WCS Site, 2 of 3 ML21105A7602021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 10 of 17) - Public Version, Chapter 2, Attachment E, Geotechnical Investigation for WCS CISF ML21105A7612021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 8 of 17) - Public Version, Chapter 2, Attachment C, Boring Logs ML21105A7622021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 9 of 17) - Public Version, Chapter 2, Attachment D, Seismic Hazard Evaluation for WCS CISF ML21105A7632021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 11 of 17) - Public Version, Chapter 2, Attach F, Evaluation of Halite Dissolution in the Vicinity of Waste Control Specialists Disposal Site, ML21105A7642021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 13 of 17) - Public Version, Chapter 2, Attachment F, Compensated Neutron Formation Density, 3 of 3 ML21105A7652021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 7 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles Anteceden ML21105A7672021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report, (Part 5 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles, 3 of 5 ML21105A7772021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 6 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the Developed Low Level & Byproduct Facility 500-Year ML21105A7792021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 14 of 17) - Public Version, Chapter 2, Attachment G, Technical Specifications for Towers ML21105A7802021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 1 of 17) - Public Version, Cover to Chapter 2 ML21105A7822021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 3 of 17) - Public Version, Chapter 2, Attachment B, Flood Plain Report, 1 of 5 ML21105A7922021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 16 of 17) - Public Version, Chapters 3 to 15 ML21105A7972021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 4 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 100-Year Water Surface Profile, 2 of 5 ML21105A7712021-04-12012 April 2021 Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 15 of 17) - Public Version, Chapter 2, Attachment H, Compiled Meteorological and Climatology Data ML21027A1472021-01-27027 January 2021 Supplemental Information Part 2 to Support Nrc'S Continued Review of the Safety Case for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 ML21014A0632021-01-14014 January 2021 Interim Storage Partners, LLC - Submittal of Supplemental Information to Support Nrc'S Continued Review of the Safety Case for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 ML20261H4682020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapters 3 to 15 ML20261H4222020-09-0202 September 2020 WCS CISF - Affidavit ML20261H4522020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Cover to Chapter 2 ML20261H4542020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, Flood Plain Report, 1 of 5 ML20261H4552020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 100-Year Water Surface Profile, 2 of 5 ML20261H4562020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles, 3 of 5 ML20261H4572020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the Developed Low Level & Byproduct Facility 500-Year and PMP Water Surface Profiles Profiles, 4 of 5 ML20261H4582020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model or the Calculation of the 500-Year and PMP Water Surface Profiles Antecedent Moisture Condition III, 5 of 5 ML20261H4592020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment C, Boring Logs ML20261H4602020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment D, Seismic Hazard Evaluation for WCS CISF ML20261H4612020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment E, Geotechnical Investigation for WCS CISF ML20261H4632020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Evaluation of Halite Dissolution in the Vicinity of Waste Control Specialists Disposal Site, Andrews County, Tx, 1 of 3 ML20261H4642020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Occurrence of Gypsum at the WCS Site, 2 of 3 ML20261H4652020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Compensated Neutron Formation Density, 3 of 3 ML20261H4662020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment G, Technical Specifications for Towers ML20261H4672020-09-0202 September 2020 WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment H, Compiled Meteorological and Climatology Data ML20101P4062020-03-31031 March 2020 Draft RAI Responses with Associated SAR Change Pages 2021-04-12 |
Text
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 4 Attachment D Seismic Hazard Evaluation for WCS CISF (147 pages)
Proprietary Information on Cover page, Study Revision Page, Stamp Page, pages i to v, ES-1 and ES-2, 1-1 to 1-3, 2-1, 3-1 to 3-4, 4-1 to 4-6, 5-1 to 5-10, 6-1 and 6-2, 7-1 to 7-8, 8-1, 9-1, 10-1 to 10-7, Table 1 (2 pages),
Table 2 to Table 4, Table 5a to Table 5c, Figure 1 to Figure 40, Figure 41a to Figure 41c, Figure 42 to Figure 67, A-1 to A-15, B-1, C-1 Withheld Pursuant to 10 CFR 2.390 Page D-1
Retrieved from "https://kanterella.com/w/index.php?title=ML20261H460&oldid=3606771"