ML21223A269

From kanterella
Revision as of 18:04, 2 September 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Westinghouse Electric Company, LLC, Submittal of 71.106(b) Report
ML21223A269
Person / Time
Site: 07100708
Issue date: 08/10/2021
From: Sloma-Delosier T
Westinghouse
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Division of Fuel Management
References
LTR-LCPT-21-12
Download: ML21223A269 (2)


Text

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Company Nuclear Fuel Columbia Fuel Fabrication Facility 5801 Bluff Road Hopkins, South Carolina 29061 USA Document Control Desk Direct tel: 720-467-5413 Director, Division of Spent Fuel Management e-mail: Sloma1t@westinghouse.com Office of Nuclear Materials Safety and Safeguards U. S. Nuclear Regulatory Commission 11555 Rockville Pike Your ref:

Rockville, Maryland 20852-2738 Our ref: LTR-LCPT-21-12 August 10, 2021

Subject:

Submittal of 71.106(b) Report

References:

1. Revised Quality Assurance Program Approval Form for Radioactive Material Packages No. 0708, Revision 9 (ML20227A105).
2. Westinghouse letter LTR-LCPT-19-19, Submittal of 71.106(b) Report, August 16, 2019 (ML17240A321).
3. NRC letter, Final Safety Evaluation for Westinghouse Electric Company (Westinghouse) Topical Report Quality Management System, Revision 7 (TAC NO. MF2833), December 29, 2014 (ML14336A487).
4. Westinghouse letter LTR-NRC-20-31, Submittal of Quality Management System (QMS),

Revision 8.0 (Non-Proprietary), April 27, 2020. (ML20118C994)

5. Westinghouse letter LTR-NRC-20-32, Submittal of Quality Management System (QMS)-A, Revision 8.0 (Non-Proprietary), May 19, 2020. (ML20140A288/ML20140A289)
6. NRC letter Final Safety Evaluation For Westinghouse Electric Company Topical Report Quality Management System (QMS), Revision 8.0 (EPID L-2020-TOP-0022), May 12, 2020 (ML20132A303).

In accordance with 10 CFR 71.106(b), Westinghouse Electric Company LLC (Westinghouse) provides the following 24-month report. The revised Form 311 (Reference 1) was issued to Westinghouse on December 23, 2020.

As stated in Westinghouses 2019 submittal of the 24-month report (Reference 2), Revision 7 of Westinghouses Quality Management System (QMS) was approved by NRC in 2014 (Reference 3).

By letter dated April 27, 2020 (Reference 4), Westinghouse notified NRC of changes to the Westinghouse QMS. The revision includes provisions for an extended grace period, beyond the 90-day grace period identified in RG 1.28. The extended grace period can be utilized during exigent conditions, including: a national emergency, severe localized or national weather conditions, or localized outbreak of a severe health concern to the public and licensee. NRC accepted these changes as stated in the NRC final safety evaluation (Reference 7). Post NRC review, a final accepted version of QMS was issued to NRC on May 19, 2020 (Reference 5). No additional changes have been made to the Quality Assurance Program.

© 2021 Westinghouse Electric Company LLC All Rights Reserved

Westinghouse Non-Proprietary Class 3 Page 2 of 2 Our ref: LTR-LCPT-21-12 August 10, 2021 Should you have any questions or require additional information, please contact me via the information above.

Sincerely, Tanya Sloma-DeLosier Package Licensing Program Manager Nuclear Fuel Transport Westinghouse Electric Company LLC

  • Electronically approved records are authenticated in the electronic document management system.