ML21225A043

From kanterella
Revision as of 17:59, 2 September 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Report for Quality Assurance Program for Radioactive Material Packages No. 0164, Mit Nuclear Reactor Laboratory
ML21225A043
Person / Time
Site: 07100164
Issue date: 08/03/2021
From: Lau E
MIT Nuclear Reactor Laboratory
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Division of Fuel Management
References
Download: ML21225A043 (1)


Text

MIT NUCLEAR REACTOR LABORATORY AN MIT INTERDEPARTMENTAL CENTER Edward Lau Mail Stop: NW12-122 Phone: 617 253-4211 Assistant Director 138 Albany Street Fax: 617 324-0042 Reactor Operations Cambridge, MA 02139 Email: eslau@mit.edu 3 August 2021 Attn: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety & Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Report for Quality Assurance Program for Radioactive Material Packages No. 0164, MIT Nuclear Reactor Laboratory, Docket No. 71-0164

Dear Sir or Madam:

10 CFR 71.106 requires that changes to an approval holder's quality assurance program for radioactive material packages, for changes that do not reduce commitments, shall be submitted to NRC every 24 months. In the letter "Revised Quality Assurance Program Approval Form for Radioactive Material Packages No. 0164, Revision 8" dated 7 August 2015, NRC indicated to the MIT Nuclear Reactor Laboratory (NRL) that if no changes were made to the NRL's program [NRL Safety Review file #0-91-9] in subsequent 24-month periods, the NRL would be required to report that no changes were made.

Accordingly, the MIT Nuclear Reactor Laboratory hereby reports that no changes were made to the "Quality Assurance Program for MITR-II Fuel Shipment" in the 24-month period since the previous such report, which was dated 3 August 2019.

Sincerely, Edward S. Lau, NE Assistant Director of Reactor Operations MIT Research Reactor Cc: USNRC - Senior Project Manager y t>b L/-

Research and Test Reactors Licensing Branch 1\)fvj552. D Division of Licensing Projects Office of Nuclear Reactor Regulation ;JIJJ=S-5 USNRC* - Senior Reactor Inspector, Research and Test Reactors Oversight Branch Division of Licensing Projects Office of Nuclear Reactor Regulation