TXX-4669, Interim Deficiency Rept CP-85-53 Re Fabrication of Approx 30 Platforms/Structures.Initially Reported on 851220. Completion of Insp & Engineering Efforts Anticipated by 860430 & 0520,respectively
| ML20140D229 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/20/1986 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-85-53, TXX-4669, NUDOCS 8601290225 | |
| Download: ML20140D229 (1) | |
Text
_
Log # TXX-4669 TEXAS UTILITIES GENERATING COMPANY File # 10110 NKYW AY TOWER e 400 NORTH OIJVE NTREET. I.B. MI e DAI.I.AN. TPX AM 75201 January 20, 1986
.7ASUJfSf.~at IM@ FROW /1K!9 i s :
JAN221986 !
Mr. Eric H. Johnson, Acting Director Division of Reactor Safety and Projects U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET N05. 50-445 AND 50-446 SEISMIC CATEGORY II PLATFORMS SDAR: CP-85-53
Dear Mr. Johnson:
On December 20, 1985 we verbally notified your Mr. Raymond Hall of a defi-ciency involving the fabrication of approximately thirty (30) platforms / structures in Units 1 and 2. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We antici-pate completion of the inspection and engineering efforts by April 30, 1986 and May 20, 1986, respectively.
We are continuing our evaluation and anticipate completion by June 13, 1986.
4 Very truly yours, MWdt W. G. Counsil JCH/ arm c - NRC Region IV (C + 1 copy)
Director, Inspection & Enforcement (15 copies)
U.S. Nuclear Regulatory Commission Washington, D.C. 20555 8601290225 860120 gDR ADOCK 050 g 5 Y A unvassos or rexas m suries us.scruic coursur S&