Interim Deficiency Rept CP-86-10 Re Bunker Ramo Electrical Penetration Assemblies.Initially Reported on 860424.Bunker Ramo Modules to Be Replaced by Conax Modules by 870525.Next Rept Will Be Submitted by 870427
ML20203N424
Person / Time
Site: Comanche Peak  
Issue date: 09/26/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-10, TXX-5044, NUDOCS 8610090011
Download: ML20203N424 (1)


Text

Log # TXX-5044 File # 10010 908.1 .

TEXAS UTILITIES GENERATING COMPANY NKYWAY TOWER . 400 NOBtTH ORJVE NTREET. I B. 81. DALLAM TEXAM 75301 September 26, 1986 "NN?A?E?5 Mr. Eric H. Johnson, Director

!T ggQl@f p

Division of Reactor Safety and Projects W U. S. Nuclear Regulatory Commission S@ 2 91TS 611 Ryan Plaza Drive, Suite 1000 b, Arlington, TX' 76012 --

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 ELECTRICAL PENETRATION ASSEMBLIES SDAR: CP-86-1.0 (INTERIM REPORT)

Dear Mr. Johnson:

On April 24, 1986, we notified you of a reportable item involving the electrical penetration assemblies (EPA's) supplied by Bunker Ramo (see TXX-4774). This is a follow-up interim report on a reportable item under the provisions of 10CFR50.55(e). We have submitted an interim report logged TXX-4929, dated July 22, 1986.

The EPA modules supplied by Bunker Ramo will be replaced by modules supplied by Conax. Rework in Unit 1 is scheduled to commence by October 27, 1986, and be completed by May 25, 1987. The schedule for the Unit 2 rework has not yet been established. The information will be reported at a later date.

We anticipate submitting our next report by March 27, 1987.

Very truly yours, f ($

W. G. Counsil JCH/amb c - NRC Region IV (0 + 1 copy)