TXX-7045, Final Deficiency Rept CP-87-24 Re Approval to Allow Bending of Nelson Stud Anchors.Initially Reported on 870629.Bending Calculations Indicate That Stresses Would Not Exceed Unallowable Limits.Issue Not Reportable,Per 10CFR50.55(e)

From kanterella
Revision as of 05:23, 8 July 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Final Deficiency Rept CP-87-24 Re Approval to Allow Bending of Nelson Stud Anchors.Initially Reported on 870629.Bending Calculations Indicate That Stresses Would Not Exceed Unallowable Limits.Issue Not Reportable,Per 10CFR50.55(e)
ML20236Y031
Person / Time
Site: Comanche Peak  
Issue date: 12/08/1987
From: Counsil W, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-87-24, TXX-7045, NUDOCS 8712110041
Download: ML20236Y031 (1)


Text

_ _ _ _ _ _ _ _ _ _ - _ _ _

i >

M {

=l'

= Log # TXX-7045

- 4 File # 10110

= = 906.2 7UELECTRIC Ref. 4 10CFR50.55(e)

, - December 8, 1987 V'liliam G. Counsil

- Fnecutive V,cr IWuknt l U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555

SUBJECT:

COMAflCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET N05. 50-445 AND 50-446 CONTAINMENT LINER NELSON STUD BENDING SDAR': CP-87-24 (flNAL REPORT)

, Gentlemen:

, On June 29, 1987, we verbally notified your Mr. H. S. Phillips of a deficiency 4 involving engineering approval provided to allew bending of Nelson Stud r anchors on the containment liner in excess of FSAR requirements. Our latest

,s interim report on this issue, logged TXX-7000, was submitted on November 25, 1987.

Calculations have been performed which demonstrate the bending of Helson stud anchors on the containment liner would not cause stresses in adjacent anchors or in the liner plate to exceed allowable stress limits.

We have concluded that had this issue remained uncorrected, no condition adverse to safety of plant operations would exist. This issue is not reportable under the provisions of 10CFR50.55(e). Records supporting this conclusion will be available for your inspectors to review at the CPSES project site after January 6, 1988.

Very truly yours, (A). G>. b W. G. Counsil By: #

D. R. Woodlan Supervisor, Docket Licensing JCH/grr s

c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)

/

'8712110041 871208 ADOCK 05000445

/ff PDR DCD g .a n,,,1, oine prcct to 8: vais.,u, re w 7 n i

,