NRC INSPECTION MANUAL IRIB INSPECTION MANUAL CHAPTER 2515 APPENDIX C SPECIAL AND INFREQUENTLY PERFORMED INSPECTIONS Effective Date: 06/26/2023 This appendix lists inspection procedures that are implemented infrequently for special situations. These inspections may be implemented in response to events, infrequent major activities at nuclear power plants, to evaluate emergent technical issues not related to licensee performance, to fulfill NRCs obligations under domestic interagency memoranda of understanding, or to implement the requirements of 10 CFR Part 75 for treaties between the United States and the International Atomic Energy Agency.
These inspections are not part of the baseline or supplemental inspection program elements and Regional Administrator authorization is required to charge inspection hours to any of the listed inspection procedures below. To provide for adequate documentation of agency business consistent with 36 CFR 1222.22, the Regional Administrators authorization shall be annotated in an Official Agency Record that either approves or documents any inspection implemented using this appendix.
Non-baseline inspection used to address deficient licensee performance is supplemental inspection and shall be addressed under Inspection Manual Chapter (IMC) 2515, Appendix B, Supplemental Inspection Program.
Each inspection procedure in the table below will be reviewed in accordance with the periodicity and process specified in IMC 0040, Preparation, Revision, Issuance, and Ongoing Oversight of NRC Inspection Manual Documents. IMC 0307, Appendix A, Reactor Oversight Process Self-Assessment Metrics and Data Trending, is used to assess the conduct of this review. [C1]
Number Inspection Procedure Title 36100 Inspections of 10 CFR Part 21 and Programs for Reporting Defects and Noncompliance 37060 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection 40100 Independent Safety Culture Assessment Follow-up 41500 Training and Qualification Effectiveness 43004 Inspection of Commercial-Grade Dedication Programs 50001 Steam Generator Replacement Inspection 50003 Pressurizer Replacement Inspection 52003 Digital Instrumentation and Control Modification Inspection 60715 Spent Fuel Pool Safety at Operating Reactors 60845 Operation of Intra-Unit Fuel Transfer Canister and Cask System Issue Date: 06/26/23 1 2515 App C
Number Inspection Procedure Title 71002 License Renewal Inspection 71003 Post-Approval Site Inspection for License Renewal 71004 Power Uprate 71007 Reactor Vessel Head Replacement Inspection 71013 Site Inspection for Plants with a Timely Renewal Application 71150 Discrepant or Unreported Performance Indicator Data 92702 Follow-up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Orders 92709 Contingency Plans for Licensee Strikes or Lockouts 92711 Implementation of Licensee Contingency Plans During a Strike/Lockout 92712 Resumption of Normal Operations After a Strike/Lockout 92722 Follow-up Inspection for Any Severity Level I or II Traditional Enforcement Violation or for Two or More Severity Level III Traditional Enforcement Violations in a 12 Month Period 92723 Follow-up Inspection for One Severity Level III and Two Severity Level IV Traditional Enforcement Violations or for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period 93002 Managing Fatigue 93100 Safety-Conscious Work Environment Issue of Concern Follow-up 93800 Augmented Inspection Team 93812 Special Inspection Issue Date: 06/26/23 2 2515 App C
Attachment 1: Revision History for IMC 2515, Appendix C Commitment Accession Description of Change Description of Comment Tracking Number Training Resolution and Number Issue Date Required and Closed Feedback Change Notice Completion Form Accession Date Number (Pre-Decisional, Non-Public Information)
N/A 10/28/93 Initial issuance No N/A N/A 09/08/97 Revised to update existing guidance on the use of PRA in No N/A CN 97-014 the inspection program N/A 04/03/00 Revised reactor oversight process No N/A CN 00-003 N/A 04/04/00 Revised to include IP 92050 for use by Region II in the No N/A CN 00-005 inspection of Browns Ferry 1, Watts Bar 2, and Bellefonte plants.
N/A 09/12/00 Revised to include three procedures that were part of the No N/A CN 00-028 previous inspection program and are expected to be implemented infrequently in the current inspection program.
They are IP 50001, "Steam Generator Replacement Inspection," IP 92050, "Review of Quality Assurance For Extended Construction Delay," and IP 36100, "10 CFR Part 21 Inspections at Nuclear Power Reactors."
N/A 03/06/01 Revised to add IP 60853, "On-Site Fabrication of No N/A CN 06-006 Components and Construction of an ISFSI" N/A 10/22/02 Revised to list Independent Spent Fuel Storage Installation No N/A CN 02-038 (ISFSI) inspection procedures that are funded for NRR inspections at operating reactor sites.
N/A 12/09/02 Revised to include the addition of IP 71003 No N/A CN 02-044 Issue Date: 06/26/23 Att1-1 2515 App C
Commitment Accession Description of Change Description of Comment Tracking Number Training Resolution and Number Issue Date Required and Closed Feedback Change Notice Completion Form Accession Date Number (Pre-Decisional, Non-Public Information)
N/A ML023510036 Revised to include IP 71007, "Reactor Vessel Head No N/A 02/12/03 Replacement Inspection" CN 03-003 N/A ML041280021 Revised to include Inspection Procedures for inspecting No N/A 05/06/04 Independent Spent Fuel Storage Installations (ISFSIs) at CN 04-011 operating plants as well as to add Inspection Procedures 71004 and 71005.
N/A ML050340593 Revised to add inspection procedure 41500, Training and No N/A 01/27/05 Qualification Effectiveness. This is to allow for cause CN 05-004 inspections when it becomes necessary to augment activities in accordance with 10 CFR Part 55, 10 CFR 50.120, and program office guidance when necessary to ensure safe plant operation.
N/A ML052010057 Revised to add IP 50003, "Pressurizer Replacement No N/A 07/07/05 Inspections." This procedure is to be implemented to monitor CN 05-018 licensees safety-related activities related to the removal and replacement of a pressurizer at operating reactor facilities.
N/A ML072820557 Added IP 92702 to the list of Special and Infrequently No N/A 01/10/08 Performed Inspections.
CN 08-001 N/A ML091490141 Added IP 92722 and IP 92723 to the list of Special and No N/A 08/11/09 Infrequently Performed Inspections CN 09-020 Issue Date: 06/26/23 Att1-2 2515 App C
Commitment Accession Description of Change Description of Comment Tracking Number Training Resolution and Number Issue Date Required and Closed Feedback Change Notice Completion Form Accession Date Number (Pre-Decisional, Non-Public Information)
N/A ML092300225 Added IP 52003 and IP 93002 to the list of Special and No N/A 11/09/09 Infrequently Performed Inspections and deleted IP 71005 CN 09-026 (previously deleted procedure).
N/A ML102590503 Added IP 37060, IP 40100, IP 71150 and IP 93100 to the list No N/A 10/21/11 of Special and Infrequently Performed Inspections. IP 71150 CN 11-021 is effective as an IMC 2515 Appendix C inspection as of January 1, 2012.
N/A ML12083A288 Added IP 60845 No N/A 04/26/12 CN 12-007 ML13064A441 Added IP 43004 and IP 71013 No N/A 09/25/13 CN 13-023 ML14154A120 Clarifies requirements to show that Regional Administrator No 2515C-1820 06/11/14 approval is not required to perform ISFSI procedures listed in CN 14-012 this manual chapter appendix.
N/A ML15167A079 Revised to add IP 60715, Reserved for: Spent Fuel Safety at No 2515C-2123 06/24/15 Operating Reactors, clarify introductory text, and incorporate ML15175A204 CN 15-012 recommendations in FBF-2515C-2123.
Issue Date: 06/26/23 Att1-3 2515 App C
Commitment Accession Description of Change Description of Comment Tracking Number Training Resolution and Number Issue Date Required and Closed Feedback Change Notice Completion Form Accession Date Number (Pre-Decisional, Non-Public Information)
C1
Reference:
ML19085A407 Revised to reflect requirement for consistent and periodic No ML19085A425 Corrective 05/01/19 reviews of inspection procedures. This action satisfies Action from CN 19-014 Recommendation 1 from OIG-18-A-13, Audit of NRCs OIG-18-A-13 Special and Infrequently Performed Inspections.
ML18136A734 Additionally, revised to remove procedures that were determined to no longer be warranted due to inclusion of relevant portions in other procedures, completion of program, or prior procedure deletion. This action satisfies Recommendation 3 from OIG-18-A-13, Audit of NRCs Special and Infrequently Performed Inspections C1
Reference:
ML20162A098 Editorial update was made to reflect that the requirement to No N/A Corrective 07/31/20 conduct periodic reviews associated with Commitment 1 will Action from CN 20-036 reside in IMC 0040.
OIG-18-A-13 ML18136A734 ML20321A277 Removed IP 60854.1, 60855.1, 60856.1, and 81311. ISFSI ML20324A377 12/22/20 inspections have been integrated into the 2690 program.
CN 20-076 Added requirement to document the Regional Administers authorization for conducting IMC 2515 App C inspections.
ML23151A546 Revised to add IP 71002 and 71013. IPs 71002 and 71013 N/A N/A 06/26/23 revised to add applicability to this IMC. A few IPs listed are CN 23-018 also editorially revised to reflect current titles.
Issue Date: 06/26/23 Att1-4 2515 App C