ML19085A407

From kanterella
Jump to navigation Jump to search
IMC 2515 Appendix C Special and Infrequently Performed Inspections
ML19085A407
Person / Time
Issue date: 05/01/2019
From: Jeffrey Bream
NRC/NRR/DIRS/IRIB
To:
Bream J, 610-337-5212, NRR/DIRS
Shared Package
ML19086A042, ML19120A286 List:
References
CN 19-014, DC 19-011
Download: ML19085A407 (6)


Text

NRC INSPECTION MANUAL IRIB INSPECTION MANUAL CHAPTER 2515 APPENDIX C SPECIAL AND INFREQUENTLY PERFORMED INSPECTIONS This appendix lists inspection procedures that are implemented infrequently for special situations. These inspections may be implemented in response to events, infrequent major activities at nuclear power plants, to evaluate emergent technical issues not related to licensee performance, to fulfill NRCs obligations under domestic interagency memoranda of understanding, or to implement the requirements of 10 CFR Part 75 for treaties between the United States and the International Atomic Energy Agency.

These inspections are not part of the baseline or supplemental inspection program elements and Regional Administrator authorization is required for their implementation (see exception below).

This appendix also lists IPs for inspecting Independent Spent Fuel Storage Installations (ISFSIs) at operating plants. The implementation of ISFSI procedures listed in this manual chapter does not require authorization from the Regional Administrator. IMC 2690, Inspection Program for Dry Storage of Spent Reactor Fuel at ISFSIs, lists IPs for inspecting ISFSIs at other than operating plants.

Each inspection procedure in the table below will be reviewed in accordance with the periodicity and process specified in Inspection Manual Chapter 0307. [C1]

Number Inspection Procedure Title Inspections of 10 CFR Part 21 and Programs for Reporting Defects and 36100 Noncompliance 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, 37060 Systems, and Components Inspection 40100 Independent Safety Culture Assessment Follow-up 41500 Training and Qualification Effectiveness 43004 Inspection of Commercial-Grade Dedication Programs 50001 Steam Generator Replacement Inspection 50003 Pressurizer Replacement Inspection 52003 Digital Instrumentation & Control Modification Inspection 60715 Spent Fuel Safety at Operating Reactors 60845 Operation of Intra-Unit Fuel Transfer Canister and Cask System 60854.1 Preoperational Testing of ISFSIs at Operating Plants 60855.1 Operation of an ISFSI at Operating Plants 60856.1 Review of 10 CFR 72.212(b) Evaluations at Operating Plants Issue Date: 05/01/19 1 2515 Appendix C

Number Inspection Procedure Title 71003 Post-Approval Site Inspection For License Renewal 71004 Power Uprate 71007 Reactor Vessel Head Replacement Inspection 71150 Discrepant or Unreported Performance Indicator Data 81311 Physical Security Requirements for Independent Spent Fuel Storage Installations Follow-up on Traditional Enforcement Actions Including Violations, Deviations, 92702 Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders 92709 Licensee Strike Contingency Plans 92711 Continued Implementation of Strike Plans During an Extended Strike 92712 Resumption of Normal Operations After a Strike Follow up Inspection for Any Severity Level I or II Traditional Enforcement 92722 Violation or for Two or More Severity Level III Traditional Enforcement Violations in a 12 Month Period Follow up Inspection for Three or More Severity Level IV Traditional Enforcement 92723 Violations in the Same Area in a 12 Month Period 93002 Managing Fatigue 93100 Safety Conscious Working Environment Issue Follow-up 93800 Augmented Inspection Team 93812 Special Inspection Issue Date: 05/01/19 2 2515 Appendix C

Attachment 1 - Revision History for IMC 2515 Appendix C Commitment Accession Description of Change Description of Comment Resolution Tracking Number Training and Closed Feedback Number Issue Date Required and Form Accession Change Notice Completion Date Number (Pre-Decisional, Non-Public Information)

N/A 10/28/93 Initial issuance No N/A N/A 09/08/97 Revised to update existing guidance on the use of PRA in the No N/A CN 97-014 inspection program N/A 04/03/00 Revised reactor oversight process No N/A CN 00-003 N/A 04/04/00 Revised to include IP 92050 for use by Region II in the No N/A CN 00-005 inspection of Browns Ferry 1, Watts Bar 2, and Bellefonte plants.

N/A 09/12/00 Revised to include three procedures that were part of the No N/A CN 00-028 previous inspection program and are expected to be implemented infrequently in the current inspection program.

They are IP 50001, "Steam Generator Replacement Inspection," IP 92050, "Review of Quality Assurance For Extended Construction Delay," and IP 36100, "10 CFR Part 21 Inspections at Nuclear Power Reactors."

N/A 03/06/01 Revised to add IP 60853, "On-Site Fabrication of Components No N/A CN 06-006 and Construction of an ISFSI" N/A 10/22/02 Revised to list Independent Spent Fuel Storage (ISFSI) No N/A CN 02-038 Installation inspection procedures that are funded for NRR inspections at operating reactor sites.

Issue Date: 05/01/19 Att1-1 2515 Appendix C

Commitment Accession Description of Change Description of Comment Resolution Tracking Number Training and Closed Feedback Number Issue Date Required and Form Accession Change Notice Completion Date Number (Pre-Decisional, Non-Public Information)

N/A 12/09/02 Revised to include the addition of IP 71003 No N/A CN 02-044 N/A 02/12/03 Revised to include IP 71007, "Reactor Vessel Head No N/A CN 03-003 Replacement Inspection" N/A 05/06/04 Revised to include Inspection Procedures for inspecting No N/A CN 04-011 Independent Spent Fuel Storage Installations (ISFSIs) at operating plants as well as to add Inspection Procedures 71004 and 71005.

N/A ML050340593 Revised to add inspection procedure 41500, Training and No N/A 01/27/05 Qualification Effectiveness. This is to allow for cause CN 05-004 inspections when it becomes necessary to augment activities in accordance with 10 CFR Part 55, 10 CFR 50.120, and program office guidance when necessary to ensure safe plant operation.

N/A ML052010057 Revised to add IP 50003, "Pressurizer Replacement No N/A 07/07/05 Inspections." This procedure is to be implemented to monitor CN 05-018 licensees safety-related activities related to the removal and replacement of a pressurizer at operating reactor facilities.

N/A ML072820557 Added IP 92702 to the list of Special and Infrequently No N/A 01/10/08 Performed Inspections.

CN 08-001 Issue Date: 05/01/19 Att1-2 2515 Appendix C

Commitment Accession Description of Change Description of Comment Resolution Tracking Number Training and Closed Feedback Number Issue Date Required and Form Accession Change Notice Completion Date Number (Pre-Decisional, Non-Public Information)

N/A ML091490141 Added IP 92722 and IP 92723 to the list of Special and No N/A 08/11/09 Infrequently Performed Inspections CN 09-020 N/A ML092300225 Added IP 52003 and IP 93002 to the list of Special and No N/A 11/09/09 Infrequently Performed Inspections and deleted IP 71005 CN 09-026 (previously deleted procedure).

N/A ML102590503 Added IP 37060, IP 40100, IP 71150 and IP 93100 to the list No N/A 10/21/11 of Special and Infrequently Performed Inspections. IP 71150 CN 11-021 is effective as an IMC 2515 Appendix C inspection as of January 1, 2012.

N/A ML12083A288 Added IP 60845 No N/A 04/26/12 CN 12-007 ML13064A441 Added IP 43004 and IP 71013 No 09/25/13 CN 13-023 ML14154A120 Clarifies requirements to show that Regional Administrator No 2515C-1820 06/11/14 approval is not required to perform ISFSI procedures listed in CN 14-012 this manual chapter appendix.

Issue Date: 05/01/19 Att1-3 2515 Appendix C

Commitment Accession Description of Change Description of Comment Resolution Tracking Number Training and Closed Feedback Number Issue Date Required and Form Accession Change Notice Completion Date Number (Pre-Decisional, Non-Public Information)

N/A ML15167A079 Revised to add IP 60715, Reserved for: Spent Fuel Safety at No 2515C-2123 06/24/15 Operating Reactors, clarify introductory text, and incorporate ML15175A204 CN 15-012 recommendations in FBF-2515C-2123.

C1

Reference:

ML19085A407 Revised to reflect requirement for consistent and periodic No ML19085A425 Corrective 05/01/19 reviews of inspection procedures. This action satisfies Action from CN 19-014 Recommendation 1 from OIG-18-A-13, Audit of NRCs OIG-18-A-13 Special and Infrequently Performed Inspections.

ML18136A734 Additionally, revised to remove procedures that were determined to no longer be warranted due to inclusion of relevant portions in other procedures, completion of program, or prior procedure deletion. This action satisfies Recommendation 3 from OIG-18-A-13, Audit of NRCs Special and Infrequently Performed Inspections Issue Date: 05/01/19 Att1-4 2515 Appendix C