ML20064A436

From kanterella
Revision as of 01:25, 1 June 2023 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application for Amend to License NPF-8,changing Tech Specs Re RCS Heatup & Cooldown Limit Curves for First 14 Efpys,Per WCAP-12471
ML20064A436
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/27/1990
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20064A437 List:
References
NUDOCS 9009040213
Download: ML20064A436 (3)


Text

..,'.,

  • fd o j

. Alabama Power Company ' i

.. 40 Inverness 0:nt:r Parkway -

i

. Post Office Bort 295

' Birmingham, Alabama 35201' Telephone 205 868-5581 iq a

W. G. Heireton, lil .

Pa'a7s;,Tn'"' Alabama Power i l

t August 27. 1990 the southem e4ctre system - j 10 CrR 50.90-1 Docket Nos'50-364 l

1 U.S. Nuclear Regulatory Cotanission .)

ATIN: Document Control Desk.

Washington, D.C. 20555 .

Gentlement Joseph M. Farley Nuclear Plant - Unit-2; RCS Heatup and Cooldown Limit Curves Provided herein are proposed technical specification changesLfor J. M. Farley. 7 Nuclear Plant Unit 2 which govern the heatup and cooldown rates'for the ~

reactor coolant system.(RCS). : %ese proposed changes provide heatup and- -

cooldown curves applicable to the first 14 EFPY for the-reactor and are.

based on the analysis of surveillance capsule X which was removed from the?

Unit 2 vessel after approximately 6.41 ETPY. L%e analysis of Capsule-X is documented by WCAP-12471, titled " Analysis of Capsule X from the Alabama

, Power Company, Joseph M. Farley Unit 2 Reactor Vessel Radiation ~-

i Surveillance Program," submitted to the NRC via C abama Power Company '

l letter dated April 12, 1990.

[ We proposed heatup and cooldown curves end the revised bases pages-associated with the revised curves a e foand in

Attachment:

1. %ese changes are-required to allow opere w.n of Farley Unit 2-beyond the-8 EFPY limit of the existing heatup and cooldown curves. Operation of Unit'2 of- 1 the Parley Nuclear Plant could reach the 8 EFPY limitation'of the existing" I curves as early as March 23, 1991. Attachment 2 contains the requiredL significant hazards analysis pursuant to 10 CFR 50.92., Based on the analysis provided, Alabama Power Company has determined that the proposed?

changes to the technical specifications will not-involve a'significant increase in the probability or consequences of an accident previously -,

evaluated, create the possibility of a new or different kind of'hecident1 '

from any accident previously evaluated, or involve a significant reduction in a margin of safety.

The Plant Operations Review Committee has' reviewed these proposed changes- l and the Nuclear Operations Review Board will review these proposed changes at a future meeting. NRC approval'of these. proposed changes is requested '

by March 1,-1991. -t i

QO 9009040213 900827 \ 'l PDR ADOCK 05000364 r P PDC .

a : 6, a Nuclear Regulatory Comnission . 1 Page 2 August.27. 1990-l l

i

~

A copy of these proposed changes is being sent to Dr. C. E. Fox, the Alabama State Designee, in accordance with 10 CFR 50.91(b)(1).

Respectfully submitted,  :

j AIABNE POWER COMPANY .

(th . )ksi'.n 4 W. G. Hairston, III WGH,III/IWS:ts  ;

Attachments cc: Mr. S. D. Ebneter SWORN BED BEFORE ME.

Mr. S. T. Hoffman. = 'DiIS J')gDAY AND OF SUBS , 1990, ,

Mr. G. F. Maxwell .U -

Dr. C. E. Fox Notary Public / y 46 .d, ,

L My conmission ExpiresmccMMissearmrAg3,g 1 .

i 1

i-

.k i  !

, . , - , , . - . , ,- ,- g -

e - e .,

Attachment 1

.~ ..

Proposed Changed Pages

-i; Page 3/4 4-29 Replace Page 3/4 4-30 Replace Page B 3/4 4-7 Replace Page B 3/4 4-10 Delete-Page B.3/4 4 Replace 1

-i

~!

l t

I i

1 I

i

}

'l 4

,I l j l 9

P i'

s

}

(

i p

I i

l l.