ML20064G396
| ML20064G396 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 12/06/1978 |
| From: | Stallings C VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Parr O Office of Nuclear Reactor Regulation |
| References | |
| 700, NUDOCS 7812110149 | |
| Download: ML20064G396 (1) | |
Text
-. . . - ..
> fo-ssrP !
VznotxrA ELzcTaxc Awo Powan CourAny l
Rxcunown.VamoxxxA sonst !
l December 6,1978 ;
i Mr. Harold R. Denton, Director Serial No. 700 !
Office of Nuclear Reactor Regulation PSE&C/CMR,jr. :bep/mc >
Attn: Mr. O. D. Parr, Chief l Light Water Reactors Branch No. 3 Docket No. 50-338 Division of Project Man.agement License No. NPF-4 i
U. S. Nuclear Regulatory Connission Washington, D. C. 20355 l t
Dear Mr. Denton:
f The purpose of this. letter is to further clarify our letter of November 22, 1978, Serial No. 646, concerning survey monitoring and Technical Specification surveillance requirements. Attachment I to that letter contains 27 " problem t survey points." Five of the points relate to the Service Water System in that !
- point 7 is on the Service Water Pump House and points 15,16,17, and 18 are
{ located on the service water piping at the Service Water Pump House. j As explained in our letter, many of the survey points differ with respect I to the established base line survey compared to the bases stated in the Techni- l cal Specification. For instance, Plant Systems Bases 3/4.7.12 states that i
, - "The first survey was conducted in May 1976 to establish a base value for all
- points." Points 15, 16, 17, 18 were not established until July 1977, while i point 7 was first established in November 1975. These dates, of course, are j not the same as the May 1976 date stated in the-bases for the Technical Speci- I fication. This situation can be rectified easily with a notation in Table 3.7-5 L or by a change in the bases section of the Technical Specification. !
I I
! This situation constitutes the totality of the " problem" associated with ;
Points 7,15,16,17, and 18. There are no safety implications in using dates ;
for points established in a time frame different from May 1976. t i
A change in the Technical Specification to reflect these other dates has
~
not and would not affect the service water piping, the service water piping ;
expansion joint, or the service water pump house. None of these systems, or !
structures associated with these systems, is in any way affected from a safety i standpoint for the type of problem described in this letter. l Very truly yours, f h ?h, y)yun U
~
C. M. Stallings Vice President-Power Supply and Production Operations l i
cc: Mr. James P. O'Reilly, Director i Office of Inspection & Enforcement {
Region II .
- i 781g3393qq ;
. - .- - . - -- - -