Regulatory Analysis on Advanced Reactor Content of Application Project Draft Interim Staff Guidance Documents
ML23093A099
Person / Time
Issue date: 05/15/2023
From: Steven Lynch
NRC/NRR/DANU/UARP
To:
Sebrosky J
Shared Package
ML22048A520 List:
References
Download: ML23093A099 (3)


Text

REGULATORY ANALYSIS ADVANCED REACTOR CONTENT OF APPLICATION PROJECT INTERIM STAFF GUIDANCE DOCUMENTS

1. Statement of the Problem The U.S. Nuclear Regulatory Commission (NRC) is considering issuing new advanced reactor content of application project (ARCAP) interim staff guidance (ISGs) documents to provide guidance to designers, applicants, and licensees for non-light water reactors (non-LWRs), for developing applications following the Licensing Modernization Project (LMP) process. The ARCAP ISGs also provide guidance to the NRC staff for the review of such applications. The proposed guidance will facilitate the development and review of non-LWR applications for construction permits (CPs) or operating licenses (OLs) under Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Domestic Licensing of Production and Utilization Facilities (Ref. 1), or for combined licenses (COLs), manufacturing licenses (MLs),

standard design approval (SDAs), or design certifications (DCs) under 10 CFR Part 52, Licenses, Certifications, and Approvals for Nuclear Power Plants The NRC staff intends to revise this proposed guidance as a part of the ongoing rulemaking for 10 CFR Part 53, Licensing and Regulation of Advanced Nuclear Reactors (RIN 3150 AK31).

To standardize the development of content within a non-LWR application, the NRC staff focused on two activities: the Advanced Reactor Content of Application Project (ARCAP) and the Technology-Inclusive Content of Application Project (TICAP). The ARCAP is an NRC-led activity that is intended to result in guidance for a complete non-LWR application for review under 10 CFR Part 50 or 10 CFR Part 52, and which the staff would update if the Commission issues a final 10 CFR Part 53 rule. As a result, the ARCAP is broad and encompasses several industry-led, and NRC-led guidance document development activities aimed at facilitating a consistent approach to the development of application documents.

The TICAP is an industry-led activity that is focused on providing guidance on the appropriate scope and depth of information related to the specific portions of the safety analysis report that describe the fundamental safety functions of the design and documents the safety analysis of the facility using the LMP-based approach. The LMP-based approach is described in RG 1.233, Guidance for a Technology-Inclusive, Risk-Informed, and Performance-Based Methodology to Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Non-Light-Water Reactors.

The following table provides the proposed ARCAP ISGs:

Document Description ADAMS Accession No.

Draft Interim Staff Guidance DANU-ISG-2022-01 Advanced ML22048B546 Reactor Content of Application Project, Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications

- Roadmap.

Draft Interim Staff Guidance DANU-ISG-2022-02, Advanced ML22048B541 Reactor Content of Application Project Chapter 2, Site Information.

Document Description ADAMS Accession No.

Draft Interim Staff Guidance DANU-ISG-2022-03, Advanced ML22048B543 Reactor Content of Application Project Chapter 9, Control of Routine Plant Radioactive Effluents, Plant Contamination and Solid Waste.

Draft Interim Staff Guidance DANU-ISG-2022-04, Advanced ML22048B544 Reactor Content of Application Project Chapter 10, Control of Occupational Dose.

Draft Interim Staff Guidance DANU-ISG-2022-05, Advanced ML22048B542 Reactor Content of Application Project Chapter 11, Organization and Human-System Considerations.

Draft Interim Staff Guidance DANU-ISG-2022-06, Advanced ML22048B545 Reactor Content of Application Project Chapter 12, Post-Construction Inspection, Testing, and Analysis Program.

Draft Interim Staff Guidance DANU-ISG-2022-07, Advanced ML22048B549 Reactor Content of Application Project, Risk-informed Inservice Inspection/Inservice Testing.

Draft Interim Staff Guidance DANU-ISG-2022-08, Advanced ML22048B548 Reactor Content of Application Project, Risk-Informed Technical Specifications.

Draft Interim Staff Guidance DANU-ISG-2022-09, Advanced ML22048B547 Reactor Content of Application Project, Risk-informed Performance-based Fire Protection Program (for Operations).

2. Objective The objective of this regulatory action is to provide guidance on using a technology-inclusive, risk-informed, and performance-based methodology to inform the licensing basis and content of applications for licenses, certifications, and approvals for non-LWRs required by 10 CFR Parts 50 and 52. The NRC staff intends to revise this guidance as a part of the ongoing rulemaking for 10 CFR Part 53.
3. Alternative Approaches The NRC staff considered the following alternative approaches:
1. Do not develop ARCAP ISGs described in the table above
2. Develop the ARCAP ISGs described in the table above Alternative 1: Do not develop ARCAP ISGs described in the table above Under this alternative, the NRC staff would not develop the ARCAP ISGs, and the current guidance, which was developed for large light-water reactor (LWR) designs, would be retained. This alternative is considered the no-action alternative and provides a baseline condition from which any other alternatives will be assessed. The no-action alternative would not address how the current large LWR-focused guidance could be adapted to address the unique design features related to non-LWR technologies or the LMP methodology. Each applicant for a non-LWR design or facility would prepare applications independent of guidance and the NRC would review each application on a case-by-case basis, which would extend the Page 2

time required to prepare and review each application and potentially result in increased costs and delays in licensing non-LWRs following the LMP methodology.

Alternative 2: Develop the ARCAP ISGs described in the table above Under this alternative, the NRC would develop the ARCAP ISGs described in the table above. This initial issuance would provide designers, applicants, and licensees of non-LWRs using the LMP methodology with guidance that is risk-informed, technology-inclusive and performance-based and would include guidance for identifying licensing basis events; classifying structures, systems, and components (SSCs) and their performance criteria; and assessing defense-in-depth to support applications submitted under 10 CFR Parts 50 and 52.

The ARCAP ISGs would also provide guidance for the NRC staff review of such applications and would be used to inform guidance development for the 10 CFR Part 53 rulemaking. By doing so, the NRC would ensure that the guidance available in this area is current and accurately reflects the NRC staffs position.

The impact to the NRC would be the costs associated with preparing and issuing the new regulatory guidance for non-LWR designs using the LMP methodology that is risk-informed, technology-inclusive, and performance-based. The impact to the public would be the voluntary costs associated with reviewing and providing comments to NRC during the public comment period. The value to NRC staff and its applicants would be the benefits associated with enhanced efficiency and effectiveness in using common guidance documents as the technical basis for license applications and other interactions between the NRC and its regulated entities.

The costs to applicants and licensees of implementing the revised guidance are justified by the benefits accrued with the use of a guidance document that is risk-informed, technology-inclusive, and performance-based that can be used to develop non-LWR applications that are different than the large LWR reactors on which the current guidance is based. Further, the NRC staff anticipates that the revised guidance would streamline the NRC staffs review of non-LWR applications (i.e., relative to a case-by-case basis review due to no guidance or outdated guidance) and therefore result in the least-cost alternative for reviewing non-LWR applications.

Conclusion Based on this regulatory analysis, the NRC staff concludes that issuance of the ARCAP ISGs is warranted. The action will enhance the ability of non-LWR designers, applicants, and future licensees using the LMP methodology to prepare applications for their new, innovative, and non-LWR based designs. The guidance could also lead to cost savings for the industry and time savings for the NRC staff, especially regarding the development or review of an application for a CP, OL, DC, COL, SDA, or ML associated with an non-LWR design.

Page 3