.. 1 PHILADELPHIA ELECTRIC COMPANY 23O1 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101
' "5 JOHN S. KEMPER VICE PRESIDENT 0CT 111983
$NGBMEE R0hG AND RESE ARC 64 Mr. Thomas E. Murley, Director United States Nuclear Regulatory Cmmission Region I 631 Park Avenue King of Prussia, PA 19406 Subj ec t: US NRC IE Letter, dated November 10, 1976 Site Inspection of October 16, 19-22, 1976 Inspection Report No. 50-353 # 6 -06 Limerick Generating Station, Unit 2
Reference:
V .S. Boyer letter to J. P . O'Reilly Dated 12/15/ 76 File: QUAL 1-2-2 (353/76-06)
Dear Mr. Murley:
In addition to the response to the subject letter regarding the items identified during the subject inspection of construction activities authorized by NRC License No. CPPR-107, w transmit the f ollowing supplementary inf orma tion:
Attachment I - Supplementary Response to Appendix A Also enclosed is an affidavit relating to the response.
Should you have any questions concerning these items, we would be pleased to discuss them with you.
Sincerely ,
WCPA/
JMC /drd / A/2 J.[.~llemper Attachments Copy to: Director of Inspection and Enforcement United S tates Nuclear Regulatory Commission Washing ton, D .C. 20555 C. K. Chaudhary, US NRC Resident Inspector 8402280464 840222 PDR ADOCK 05000353 G PDR
E
=5 ~ .- g
- e
- ATTACHMENT I SUPPLEMENTARY RESPONSE ~TO APPENDIX A - ITEM A
- A subsequent. review of the corrective action stated in the original response found that not all the inspections for which the subject Quality Control Inspector was responsible were re-inspected.
~
X .
The resident inspector was informed of this condition on August 10, 1983 by telecon.
A re-review has 'been conducted and additional safety related structural steel welds ~ have been identified for which the subject QC Inspector performed final inspections. The accessible welds were re-inspected Tdth one additional deficiency being identified and dispositioned. In-
' accessible welds were evaluated by engineering and determined to be acceptable based on rationale such as; structure is adequate without the weld;- or, the weld was actually- only f or construction purposes.
Complete records of the re-review, re-inspections, disposition of the deficiency, and evaluation of the inaccessible welds are available on
- site.
Further reviews of welding records in safety related areas other than structural steel were also undertaken. Instances where the subject inspector performed final weld ' inspection on electrical raceway and piping and preliminary weld inspections on pipe hangers were identified.
In these areas the welds were re-inspected (if they had not; already.been -
re-inspected as part of the final' hanger weld inspection procedures) and any. deficiencies were dispositioned. Records of these activities are available 'on site.
In . conclusion, based on the above work, we have fully effected the
- corrective action stated in the original response.
353/76-06 ATT. I
'l of 1 b
. . * . , 5 COMMONWEALTH OF PENNSYLVANIA :
ss.
COUNTY OF PHILADELPHIA :
JOHN S. KEMPER, being first duly sworn, deposes and says:
That he is Vice President of Philadelphia Electric Company, the holder of Construction Permit CPPR-107 for Limerick Generating Station - Unit 2; that he has read the foregoing Supplementary Rerponse to Inspection Report No. 50-353/76-06 and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.
$$ $. ,l ' ,l a-Subscribed and sworn to before me this // day of Yl $
.h ' L
' PATRICIA D. SCH0tt'
. Notary PuMc, Philade!phia. Phi! add;hia Co.
My Commission bpires rebruary 10,1986