1 PHILADELPHIA ELECTRIC COMPANY 23O1 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 0CT 111983 "5
JOHN S. KEMPER VICE PRESIDENT
$NGBMEE R0hG AND RESE ARC 64 Mr. Thomas E. Murley, Director United States Nuclear Regulatory Cmmission Region I 631 Park Avenue King of Prussia, PA 19406 Subj ec t: US NRC IE Letter, dated November 10, 1976 Site Inspection of October 16, 19-22, 1976 Inspection Report No. 50-353 # 6 -06 Limerick Generating Station, Unit 2
Reference:
V.S. Boyer letter to J. P. O'Reilly Dated 12/15/ 76 File: QUAL 1-2-2 (353/76-06)
Dear Mr. Murley:
In addition to the response to the subject letter regarding the items identified during the subject inspection of construction activities authorized by NRC License No. CPPR-107, w transmit the f ollowing supplementary inf orma tion:
Attachment I - Supplementary Response to Appendix A Also enclosed is an affidavit relating to the response.
Should you have any questions concerning these items, we would be pleased to discuss them with you.
Sincerely,
WCPA/
JMC /drd / A/2 J.[.~llemper Attachments Copy to: Director of Inspection and Enforcement United S tates Nuclear Regulatory Commission Washing ton, D.C.
20555 C. K. Chaudhary, US NRC Resident Inspector 8402280464 840222 PDR ADOCK 05000353 G
E
=5
~.- g
- e ATTACHMENT I SUPPLEMENTARY RESPONSE ~TO APPENDIX A - ITEM A
- A subsequent. review of the corrective action stated in the original response found that not all the inspections for which the subject Quality Control Inspector was responsible were re-inspected.
~
X The resident inspector was informed of this condition on August 10, 1983 by telecon.
A re-review has 'been conducted and additional safety related structural steel welds ~ have been identified for which the subject QC Inspector performed final inspections. The accessible welds were re-inspected Tdth one additional deficiency being identified and dispositioned.
In-
' accessible welds were evaluated by engineering and determined to be acceptable based on rationale such as; structure is adequate without the weld;- or, the weld was actually-only f or construction purposes.
Complete records of the re-review, re-inspections, disposition of the deficiency, and evaluation of the inaccessible welds are available on
- site.
Further reviews of welding records in safety related areas other than structural steel were also undertaken.
Instances where the subject inspector performed final weld ' inspection on electrical raceway and piping and preliminary weld inspections on pipe hangers were identified.
In these areas the welds were re-inspected (if they had not; already.been -
re-inspected as part of the final' hanger weld inspection procedures) and any. deficiencies were dispositioned. Records of these activities are available 'on site.
In. conclusion, based on the above work, we have fully effected the
- corrective action stated in the original response.
353/76-06 ATT. I
'l of 1 b
.. *., 5 COMMONWEALTH OF PENNSYLVANIA :
ss.
COUNTY OF PHILADELPHIA JOHN S. KEMPER, being first duly sworn, deposes and says:
That he is Vice President of Philadelphia Electric Company, the holder of Construction Permit CPPR-107 for Limerick Generating Station - Unit 2; that he has read the foregoing Supplementary Rerponse to Inspection Report No. 50-353/76-06 and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.
$$ $.,l ',l a-Subscribed and sworn to before me this //
day of Yl $
.h ' L
' PATRICIA D. SCH0tt'
. Notary PuMc, Philade!phia. Phi! add;hia Co.
My Commission bpires rebruary 10,1986