Text
'
T ,,7 m
P, ! Tt<\ ' ,.. {.. c i.1 7; p T.- i.. l> f 7 t , iu
!J ,
P.o. BOX 5000 - CLEVELAND, oHlo 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG- - 55 PUBLICSoVARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE PRES 10ENT
" " March 18, 1985 PY-CEI/NRR-0203 L Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 PNPP TDI Design Review /
Quality Revalidation Rev. I
Dear Mr. Youngblood:
The PNPP Diesel Generator Program Plan, submitted by letter dated January 17, 1985 (PY-CEI/NRR-0156L), included the PNPP Design Review / Quality Revalidation (DR/QR) report as an attachment. The January letter noted that any comments resulting from review of the DR/QR package would be forwarded to the NRC.
Included as an attachment to this submittal is Revision I to the PNPP DR/QR report, which has been prepared and approved by the TD1 Diesel Generator Owners Group Technical Staff.
CEI review of Revision I has noted that the report for Component No. 02-315A should reference PNPP FSAR Table 8.3-1. FSAR Table 8.3-1 shows that the maximum loading on the PNPP diesels during a LOOP /LOCA is 4668 KW and for LOOP / Forced Shutdown is 5634 KW. The analysis described for 02-315A was performed using a value of 7000 KW, which provides a margin of 1366 KW above the maximum diesel loading.
If there are any questions, please feel free to call.
Very truly yours, 8503260327 850318 16
['
Murray R. Edelman gDR ADOCK 0500 0 Vice President Nuclear Group MRE:nje ec: Jay Silberg, Esq. (1)
John Stefano (5)
J. Grobe (1) gg W. Laity, PNL (2)
D. Persinko, NRC (L)
PERRY NUCLEAR POWER PLANT REVISION 1 TO DR/QR REPORT O
Enclosed is Revision 1 to the DR/QR Report. Please revise your copy (ies) per the instructions below.
NOTE: Revise by component number and unique file identifier which is found in bottom left corner of revised page.
Delete Insert VOLUME 1
. Title Page (PE3333) Title Page Title Page Section 2.0 (PE3333) Page 2-6 Page 2-6 Section 3.0 (FE3294) Pages 3-2 Pages 3-2 3-3 3-3 3-5 3-5 3-6 3-6 3-10 3-10 3-12 3-12 VOLUME 2 Index(PE3375) Pages i thru xiv Pages i thru xiv 02-475A,C(PE3234) Pages 1 of 3' Pages 1 of 4 O 2 ef 3 3 of 3 2 ef 4 3 of 4 4 of 4 02-420(PE3230) Page 1 of 2 Page 1 of 2 02-820B (PE3227). Page 1 of 2 Page 1 of 2 2 of 2 2 of 2 02-315A (PE3237) Pages 1 of 3 Pages 1 of 4 2 of 3 2 of 4 3 of 3 3 of 4 Bfkhrh6 02-3858(PE3065) Page 1 of 2 Page 1 of 2 l
VOLUME 3 Index (PE3375) Pages i thru xiv Pages i thru xiv 02-341A (PE3038) Pages 1 of 2 Pages 1 of 2 l 2 of 2 2 of 2 VOLUME 4 Index (PE3375) Pages i thru xiv Pages i thru xiv Pages 1 of 2 Pages 1 of 2 O 02-500A (PE2911) 2 of 2 2 of 2 Appendix II (PE3041) Page 1 of 56 thru Page 1 of 59 thru 56 of 56 59 of 59
,