ML20100A952

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation Rept. Rev Notes That Rept for Component 02-315A Should Ref FSAR Table 8.3-1
ML20100A952
Person / Time
Site: Perry  
Issue date: 03/18/1985
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20100A956 List:
References
NUDOCS 8503260327
Download: ML20100A952 (2)


Text

,,7 P, ! T \\ ',.. {.. c i.1 7; p T i. l f 7

!J T

t<

t

, iu m

P.o. BOX 5000 - CLEVELAND, oHlo 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG- - 55 PUBLICSoVARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE PRES 10ENT March 18, 1985 PY-CEI/NRR-0203 L Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 PNPP TDI Design Review /

Quality Revalidation Rev. I

Dear Mr. Youngblood:

The PNPP Diesel Generator Program Plan, submitted by letter dated January 17, 1985 (PY-CEI/NRR-0156L), included the PNPP Design Review / Quality Revalidation (DR/QR) report as an attachment. The January letter noted that any comments resulting from review of the DR/QR package would be forwarded to the NRC.

Included as an attachment to this submittal is Revision I to the PNPP DR/QR report, which has been prepared and approved by the TD1 Diesel Generator Owners Group Technical Staff.

CEI review of Revision I has noted that the report for Component No. 02-315A should reference PNPP FSAR Table 8.3-1.

FSAR Table 8.3-1 shows that the maximum loading on the PNPP diesels during a LOOP /LOCA is 4668 KW and for LOOP / Forced Shutdown is 5634 KW.

The analysis described for 02-315A was performed using a value of 7000 KW, which provides a margin of 1366 KW above the maximum diesel loading.

If there are any questions, please feel free to call.

Very truly yours,

['

16 8503260327 850318 Murray R. Edelman gDR ADOCK 0500 0

Vice President Nuclear Group MRE:nje ec: Jay Silberg, Esq. (1)

John Stefano (5)

J. Grobe (1) gg W. Laity, PNL (2)

D. Persinko, NRC (L)

PERRY NUCLEAR POWER PLANT REVISION 1 TO DR/QR REPORT O

Enclosed is Revision 1 to the DR/QR Report. Please revise your copy (ies) per the instructions below.

NOTE: Revise by component number and unique file identifier which is found in bottom left corner of revised page.

Delete Insert VOLUME 1

. Title Page (PE3333)

Title Page Title Page Section 2.0 (PE3333)

Page 2-6 Page 2-6 Section 3.0 (FE3294)

Pages 3-2 Pages 3-2 3-3 3-3 3-5 3-5 3-6 3-6 3-10 3-10 3-12 3-12 VOLUME 2 Index(PE3375)

Pages i thru xiv Pages i thru xiv 02-475A,C(PE3234)

Pages 1 of 3' Pages 1 of 4 O

2 ef 3 2 ef 4 3 of 3 3 of 4 4 of 4 02-420(PE3230)

Page 1 of 2 Page 1 of 2 02-820B (PE3227).

Page 1 of 2 Page 1 of 2 2 of 2 2 of 2 02-315A (PE3237)

Pages 1 of 3 Pages 1 of 4 2 of 3 2 of 4 3 of 3 3 of 4 Bfkhrh6 02-3858(PE3065)

Page 1 of 2 Page 1 of 2 l

VOLUME 3 Index (PE3375)

Pages i thru xiv Pages i thru xiv 02-341A (PE3038)

Pages 1 of 2 Pages 1 of 2 l

2 of 2 2 of 2 VOLUME 4 Index (PE3375)

Pages i thru xiv Pages i thru xiv O

02-500A (PE2911)

Pages 1 of 2 Pages 1 of 2 2 of 2 2 of 2 Appendix II (PE3041)

Page 1 of 56 thru Page 1 of 59 thru 56 of 56 59 of 59

,