TAC:MF4560, TSTF-2, TSTF-234, TSTF-45, TSTF-46, TSTF-27, TSTF-28, TSTF-87, TSTF-95, TSTF-24, AFW Train Operable When in Service, Administratively Control Containment Penetrations, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B, Add Note to LCO 3.9.5 Allowing Shutdown Cooling Loops Removal from Operation, Increase the Completion Time When the Core Reactivity Balance is Not within Limit, Allow 7 Day Completion Time for a TURBINE-DRIVEN AFW Pump Inoperable, SFDP Clarifications, Add Met Vs. Perform to Specification 1.4, Frequency, Determination of Cumulative and Projected Dose Contributions in Recp, Containment Structural Integrity, Delete SR Frequencies Based on Inoperable Alarms, Provide Separate Condition Entry for Each PORV and Block Valve, Revise Shutdown Margin Definition for Stuck Rod Exception, Eliminate the Remote Shutdown System Table of Instrumentation and Controls, Refueling Boron Concentration Clarification, Require Static and Transient Fq Measurement (Approved, Closed)
TAC:MF5317, Administratively Control Containment Penetrations, Add Note to LCO 3.9.5 Allowing Shutdown Cooling Loops Removal from Operation, Modify Section 3.8 Mode Restriction Notes, Reduce Plant Trips Due to Spurious Signals to the Nis During Physics Testing, Add Met Vs. Perform to Specification 1.4, Frequency, Determination of Cumulative and Projected Dose Contributions in Recp, Containment Structural Integrity, Provide Separate Condition Entry for Each PORV and Block Valve, Nis Power Range Channel Daily SR TS Change to Address LOW Power Decalibration (Withdrawn, Closed)