NPL-97-0143, Forwards Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2.Corrected MOR for Feb 1997 for Unit 1,also Encl

From kanterella
Revision as of 03:14, 9 August 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2.Corrected MOR for Feb 1997 for Unit 1,also Encl
ML20137P554
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/03/1997
From: Dante Johnson
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20137P563 List:
References
NPL-97-0143, NPL-97-143, NUDOCS 9704090270
Download: ML20137P554 (1)


Text

  • -

Wisconsin Electnc POWER COMPANY Point Beach Nuclear Plant (414) 755 2321 $

6610 Nuclear Rd., Two Rivers. WI 54241 NPL 97-0143 April 3,1997 Document Control Desk .

U. S. NUCLEAR REGULATORY COMMISSION

. Mail Station PI-137 Washington, DC 20555 -

Ladies / Gentlemen:

DOCKETS 50-266 AND 50-301 MONT11LY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of March 1997. Also attached is a corrected Unit 1, February 1997 Operating Data Report reflecting reactor critical hours.

Sincerely, Q ?G-D. F. Johnson Manager -

Regulatory Services & Licensing  ;

hds 4

Attachments -

cc: L. L. Smith, PSCW NRC Regional Administrator, Region ill NRC Resident inspector I

L gg*9885!ZE' jig o 6).

R nswao-u nn c,-iu

.