ML21076A325

From kanterella
Revision as of 18:24, 19 January 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Approved FAQ List March 2021
ML21076A325
Person / Time
Issue date: 03/17/2021
From: Joylynn Quinones-Navarro
NRC/NRR/DRO/IRAB
To:
Quinones-Navarro J
References
Download: ML21076A325 (5)


Text

FAQ # PI Plant Subject ADAMS ML Effective Date HRA Related 12-04 OR01 Generic ML16285A130 05/13/2013 Occurrences Exemption Request from 13-01 IE01 Turkey Point 3 Green-White ML16285A175 06/26/2013 Threshold 13-02 IE03 Generic Power Change ML16285A318 10/23/2013 Animal 13-03 IE03 Generic ML16285A319 11/20/2013 Intrusion/Power Change 13-04 EP03 Point Beach ANS ML16285A320 04/02/2014 13-05 IE03 Generic Downpower ML16285A321 04/02/2014 13-06 MS07 Generic HPCI Failure ML16285A322 1/15/2014 DEP Scoring 13-07 EP01 Generic ML16285A323 4/1/2014 Opportunity MS06, 07, MSPI PRA Technical 14-01 Generic ML16285A324 3/31/2016*

08, 09, 10 Adequacy MS06, 07, 08, 14-02 Specific Fort Calhoun MSPI ML16285A325 10/1/2014 09, 10 14-03 IE04 ANO-2 ANO-2 USwC ML16285A326 12/11/2014

  • see FAQ for specific requirements

FAQ # PI Type Subject ADAMS ML Effective Date 14-04 OR01 Generic Concurrent Failures ML16285A327 9/11/2014 Hatch New Siren 14-05 EP03 Hatch ML16285A328 12/11/2014 System Data 14-07 EP03 Point Beach Point Beach ANS ML16285A329 12/11/2014 14-08 MS06 Generic Prairie Island Lockout ML16285A330 4/16/15 14-09 IE01 ANO ANO SCRAM April ML16285A331 2/19/2015 Indian Point Security 14-10 PP01 Indian Point ML16285A332 4/16/2015 Upgrade Perry SCRAM 15-01 IE04 Generic ML16285A333 4/16/2015 October 20, 2014 Prairie Island unplanned 15-02 IE03 Generic ML16285A334 10/21/2015 downpower Unavailability MS06,07, 15-03 Generic Monitoring of Low- ML16285A335 11/17/2015 08,09,10 Risk Trains Clarification on Granting 15-04 EP02 Generic Participation Credit ML16285A336 11/17/2015 During a HAB Drill/Exercise

  • see FAQ for specific requirements

FAQ # PI Type Subject ADAMS ML Effective Date MS06,07 Cook PRA Error 16-01 Generic ML16285A337 04/13/2016 08,09,10 Affecting MSPI MS06,07 Watts Bar 2 Baseline 16-02 Watts Bar 2 ML17129A042 09/21/2016 08,09,10 Planned UA and CCF Tornado Missile Protection (TMP) 16-03 MS05 Generic ML17129A050 07/01/2016 Potential Safety System Functional Failure Browns Ferry Safety 16-04 MS05 Generic ML17125A070 04/13/2017 System Functional Failure 17-01 IE03 Grand Gulf 1 2016 Power Change ML17207A096 07/21/2017 17-02 IE03 Palo Verde 3 PVNGS 3 Power Change ML17207A100 07/21/2017 MS06,07 Baseline Unavailability 17-03 Generic ML17291A258 09/21/2017 08,09,10 Critical Hours MS06, 07, Watts Bar Unit 2 MSPI 17-04 Watts Bar 2 ML18045A038 01/31/2018 08, 10 Effectiveness Date Watts Bar 2 MSPI MS09 01/31/2018 17-05 MS09 Watts Bar 2 ML18045A041 Effectiveness Date (Partially Withdrawn)

Definition of Initial 18-01 IE04 Generic ML18144A961 05/24/2018 Transient

  • see FAQ for specific requirements

FAQ # PI Type Subject ADAMS ML Effective Date Columbia Scram 18-03 IE04 Columbia ML18144A977 05/24/2018 Exemption Request IE01 and 18-02 Watts Bar Watts Bar Critical Hours ML18144A967 07/19/2018 IR03 ANO-1 Scram One-Time 18-04 IE04 ANO Unit 1 ML18232A233 08/20/2018 Exemption Request Turkey Point Unit 3 18-05 IE03 Turkey Point ML19024A500 1/17/2019 Shutdown 19-01 EP01 EP EP DEP Whitepaper ML19169A262 5/22/2019 19-02 BI02 Brunswick Brunswick RCS Leakage ML19169A263 7/31/2019 Nine Mile 20-01 IE03 Point 1 Nine Mile Point Scram ML20190A148 6/24/2020 20-02 EP02 Generic EP-ERO PI (COVID-19) ML20107F675 4/15/2020 FAQ 20-04: Crediting Automated Notifications in 20-04 EP01 Generic ML20335A061 11/18/2020 the DEP Performance Indicator EP-ERO PI (COVID-19),

20-02 EP02 Generic ML20352A482 12/29/2020 Updated

  • see FAQ for specific requirements

MS06 MS07 Restoration of Train 20-03 MS08 Generic Monitoring After PRA ML21075A257 2/24/2021 MS09 Model Changes MS10 River Bend RBS Unplanned Scram 20-05 IE04 ML21075A267 2/24/2021 Station May 2019 GGNS Turbine Controls Grand Gulf 20-06 IE01 Upgrade Scrams One- ML21075A275 2/24/2021 Nuclear Station Time Exemption Generic - Unplanned Scrams with 21-01 IE04 ML21075A282 2/24/2021 AP1000 Complications for AP1000

  • see FAQ for specific requirements