ML20134P341

From kanterella
Revision as of 09:11, 14 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Informs That NRC Decided to Extend Comment Period for Proposed GL, Degradation of SG Internals, Published 961231 in Vol 61,252 Pages 69116-691188 of Fr
ML20134P341
Person / Time
Issue date: 02/21/1997
From: Thadani A
NRC (Affiliation Not Assigned)
To: Modeen D
NUCLEAR ENERGY INSTITUTE (FORMERLY NUCLEAR MGMT &
References
PROJECT-689 NUDOCS 9702250355
Download: ML20134P341 (5)


Text

___ ,- - - - _ _ . . -- - .. .- . . - . - ..-.

. February 21,1997 4

Mr. David J. Modeen

. Director, Engineering Nuclear Generation Division Nuclear Energy Institute 1776 I Street, NW, Suite 400

Washington, DC 20006-3708

SUBJECT:

EXTENSION OF THE PUBLIC COMMENT PERIOD FOR THE PROPOSED GENERIC LETTER; DEGRADATION OF STEAM GENERATOR INTERNALS

Dear Mr. Modeen:

By letter dated January 27, 1997, the Nuclear Energy Institute (NEI) requested an extension of the public comment period for the )roposed generic letter,

. " Degradation of Steam Generator Internals," publisled December 31, 1996, in Volume 61, No. 252, Pages 69116-69118 of the federal Register. The comment

period was originally scheduled to expire on January 30, 1997. NEI requested
the comme'it period be extended until March 15, 1997. The extension would enable NEI to coordinate input from the industry, assemble an integrated set of industry comments, and transmit them to the NRC for consideration. In response to your request, the NRC staff decided to extend the comment period to March 15, 1997.

If you have any questions regarding this subject, please contact Stephanie M.

, Coffin at (301) 415-2778.

Sincerely, NNAl.SiGiED by Ashok C. Thadani, Associate Director for Technical Review Office of Nuclear Reactor Regulation Project No. 689

>= cc: see next page O DISTRIBUTION gg ClJ File Center PUBLIC ACRS OGC pg FJMiraglia SLMagruder GFWunder w RPZimmerman TTMartin JWShapaker EMCB RF t . =<

Ei', DOCUMENT NAME: G:\C0FFIN\GLEXTENS. ION FM CE3 To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy i+d 0FC EMCB:DE* E EMCB:DE* E EMCB:DE

  • DD:DE* DD:DRPM If* NAME SMCoffin EJSullivan KRWichman JRStrosnider DBMatthews h 2/13/97*

DATE 1/29/97 FT2W97 1/29/97 2/04/97 EE OFC D:DE* dddNRR NAME GClainas A M ani p')

DATE 2/14/97 2/l(/97 0FFICIAL RECORD COPY g 9702250355 970221 PDR PROJ 689 PDR n / r. e l f(

cr - L4 l

  • 1 February 21,1997 Mr. David J. Modeen Director, Engineering I Nuclear Generation Division Nuclear Energy Institute i 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 J

SUBJECT:

EXTENSION OF THE PUBLIC COMMENT PERIOD FOR THE PROPOSED GENERIC LETTER; DEGRADATION OF STEAM GENERATOR INTERNALS

Dear Mr. Modeen:

By letter dated January 27, 1997, the Nuclear Energy Institute (NEI) requested an extension of the public comment period for the proposed generic letter,

" Degradation of Steam Generator Internals," published December 31, 1996, in Volume 61, No. 252, Pages 69116-69118 of the federal Register. The comment period was originally scheduled to expire on January 30, 1997. NEI requested the comment period be extended until March 15, 1997. The extension would i enable NEI to coordinate input from the industry, assemble an integrated set i of industry comments, and transmit them to the NRC for consideration. In '

response to your request, the NRC staff decided to extend the comment period to March 15, 1997.

If you have any questions regarding this subject, please contact Stephanie M.

Coffin at (301) 415-2778.

Sincerely, IDk k,g. g, Ashok C. Thadani, Associate Director  !

for Technical Review l Office of Nuclear Reactor Regulation  !

Project No. 689 cc: see next page DISTRIBUTION 1

File Center PUBLIC ACRS OGC FJMiraglia SLMagruder GFWunder RPZimmerman TTMartin JWShapaker EMCB RF DOCUMENT NAME: G:\C0FFIN\GLEXTENS. ION

' "'""'*^* ****' *"" "*"'""'*

NtE'.N.c @ .ne!OuN D 'cI****'"**

OFC EMCB:DE* E EMCB:DE* E EMCB:DE

  • DD:DE* DD:DRPM NAME SMCoffin EJSullivan KRWichman JRStrosnic r DBMatthews DATE 1/29/97 T/fW97 1/29/97 2/04/97 2/13/97*

OFC D:DE* M NRR NAME GClainas A M ani DATE 2/14/97 2/M/97 0FFICIAL RECORD COPY

}

ga

.' NEI Project No. 689 cc: Mr. Ralph Beedle i

Senior Vice President and Chief Nuclear Officer i Nuclear Energy Institute l 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Mr. Thomas Tipton

, Vice President, Operations

! Nuclear Energy Institute i

, 1776 I Street, NW, Suite 400 '

Washington, DC 20006-3708 Mr. Alex Marion Director, Programs >

Nuclear Energy Institute l 1776 I Street, NW, Suite 400 l Washington, DC 20006-3708 i Mr. Jim Davis l Director, Operations Nuclear Energy Institute l 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Ms. Lynnette Hendricks l Director, Plant Support Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Mr. Anthony Pietrangelo Director, Licensing Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708  :

Mr. Ronald Simard 1 Director, Advanced Technology  !

Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Mr. Nicholas J. Liparulo Manager, Nuclear Safety and Regulatory Activities Vu:: lear and Advanced Technology Division Vet:f,inghouse Electric Corporation F.O. Box 355 Pittsburgh, Pennsylvania 15230

. __ ____ _ _ . _ . _ __ _ _ _ . -. . _ , . _ . . _ ~ ._ _ _

i 4

l i Mr.- David J. Modeen Director, Engineering l i Nuclear Generation Division '

Nuclear Energy Institute ,f 1776 I Street, NW, Suite 400 l

. Washington, DC 20006-3708 l t

I

SUBJECT:

' EXTENSIONOFTHEPUBLICCOMMENTPERIODFORThPROPOSEDGENl l LETTER; DEGRADATION OF STEAM GENERATOR INT LS  :

)

Dear Mr. Modeen:

l By letter dated January 27 1997 theNuclearEne! gy Institute (NEI) requested  ;

an extension of the public proposed generic letter, "DegradationofSteamGene$commen,tperiodfort rAtor Internals," ished December 31, 1996, in Volume 61,'No. 252 Pages 69116-69118 ofthe/pu ederal Register. The comment i period was originally scheddled to expire oJi January 30, 1997. NEI requested i the communt period be extend &d until MarcV15,1997. The extension would I enable NEI to coordinate input'from t the ndustry, assemble an integrated set l of industry comments,' and' transmit them/t o the NRC for consideration. In -

response to your request, the:NRC staff decided to extend the comment period I to Ma,rch. 15,>1997, \ A i q' f IfLyo~u.ha've'anyquestions.regardihhthis" subject,pleasecontactStephanie.M.

Coffin at (301) 415-2778.= ,

, , l/ ( ,

p 'G

s j- .

7 , sin ~cerely,

  1. /-

~ / p \

. Bri\nW.Sheron,ActingAssociateDirector l fo't Technical Review

/ ,, Offi of Nuclear Reactor Regulation Project No. 689 >/ .

cc: seenextpage/t  ;

DISTRIBUTION j -i File Center' [ PUBLIC ACRS OGC FJMiraglia / SLMagruder ACTha ani GFWunder RPZimmerman f 'TTMartin JWSha ker EMCB RF DOCUMENT NAME:' G:\C0FFIN\GLEXTENS. ION To receive a copy.of this doctament, indicate in the box: "C= = C without attachment / enclosure 'E" = Copy with .tt.che.nt/. net ure au = u copy

  • see previous c ncurrereg) (\ i 0FC EMCB:DE EMCB:DE EMCB:DE .DD:DE d DD% M NAME- SMCoffin EJSullivan KRWichman 'JRStro(nider DBPitthews DATE, 1/29/97* 1/29/97* 1/29/97* 1/4 /97 1/l1/97 l OFC DdE ADT:NRR g q NAME G$1nas BWSheron DATE 4/ jll/97 1/ /97 '

't OFFICIAL RECORD COPY l

~.D Mr. David J. Modeen Director, Engineering Nuclear Generation Division Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 .

SUBJECT:

EXTENSION OF THE PUBLIC COMMENT PERIOD FOR THE PROPOSED GENERIC LETTER; DEGRADATION OF STEAM GENERATOR INTERNALS

Dear Mr. Modeen:

By letter dated January 27, 1997, the Nuc. lear Energ ns'titute (NEI) requested an extension of the public comment period for the roposed generic letter,

" Degradation of Steam Generator Internals," pu shed December 31, 1996, in Volume 61. No. 252, Pages 69116-69118 of-the' ederal Register. The comment period was originally scheduled to expire January 30, 1997,. NEI requested the comment period be extended until Mar 15, 1997. The extension would enable NEI to coordinate input 'from th industry, assemble'an' integrated set of industry comments, and transmit t m to the NRC for consideration. >In response to your request, the NRC aff. decided to extend the comment period to March 15, 1997. * -

j If you have any questions reg ding this subject, ple'ase contact Stephanie M.

Coffin at (301) 415-2778.

- Sincerely, i

l Brian W. Sheron, Acting Associate Director for Technical Review FOffice ofWlear Reactor Regulation i Project No. 9 l cc: see ne t page I DISTRIBUTI N j File C ter PUBLIC ACRS OGC FJMir lia SLMagruder ACThadani GFWunder RPZi erman TTMartin JWShapaker EMCB RF DOC MENT NAME: G:\C0FFIN\GLEXTENS. ION To receive a copy of ti;is document, indicate in the box:

with attachment /eneto(bre "N" s No copy y// a copy without attpchment/

/) 0 enclosure "E" = Copy 0FC EMCB:DE E EMCB:DE E EMGBfEQ DD:DE D DD:DRPM NAME SMCoffin EJSulliva$ 'K#Iidhfian JRStro/nider DBMatthews DATE 1/II/97 1 /29 /97 1M97 1/ 4 /97' 1/ /97 l OFC D:DE ADT:NRR NAME GClainas BWSheron DATE 1/ /97 1/ /97 0FFICIAL RECORD COPY