TAC:49992
From kanterella
Revision as of 11:56, 13 December 2021 by
StriderTol
(
talk
|
contribs
)
(StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation
Jump to search
v
t
e
TAC
-
49992
, (Open)
7 October 1982 - 15 August 1985
Request for:
Open
Initiation
Request
Acceptance...
Withholding Request...
Meetings...
Questions
Answers
Results
Approval...
Other:
05000416/LER-1982-072, Forwards LER 82-072/01T-0
,
AECM-82-490, Submits Addl Info Re Design & Testing of Automatic Depressurization Sys Air Sys,Including Response to NUREG-0737,Item II.K.3.28,air Sys Testing & Air Sys Makeup Provisions.Revision to FSAR Subsection 18.1.30.12 Encl
,
AECM-82-510, Outlines Commitments Made During 821025 Telcon Re Design & Testing of Automatic Depressurization Air Sys.Integrated Leak Test on Sys Will Be Performed Every 18 Months. Justification for Interim Operation Listed
,
AECM-82-528, Forwards Addl Info Re Instrument Air Quality,In Support of NRC Review of Util Response to NUREG-0737,Item II.K.3.28. Proposed Tech Specs & Design Details Will Be Provided 4 Months Prior to Startup Following First Refueling Outage
,
AECM-82-581, Confirms Installation of Mechanical Pressure Gauge on Automatic Depressurization Sys Air Makeup Line & Performance of Associated Surveillance
,
AECM-83-0179, Interim Deficiency Rept Re Installation of Noncorrosion Resistant Matl for Instrument Air Pipe Penetrations. Initially Reported on 830315.Design Change Will Be Implemented.Also Reported Per Part 21
,
AECM-83-0672, Provides Addl Info Re Qualification of Automatic Depressurization Sys (ADS) Accumulator & Related Air Sys,In Response to .Ads Leak Test Frequency of 18 Months Anticipated
,
AECM-83-0759, Final Part 21 Rept PRD-83/16 for Unit 1 & Interim Part 21 Rept for Unit 2 Re Failure of Internal Coating of Automatic Depressurization Sys,Main Steam Safety Relief Valve & MSIV Accumulators.Final Rept Expected by 840531
,
AECM-85-0030, Forwards Addl Info Requested During 841206 Telcon Re Design & Operation of Automatic Depressurization Sys (ADS) Accumulators & Related Air sys.Long-term ADS Pneumatic Supply Makeup Connection Located in Auxiliary Bldg
,
ML20070H209
From
Grand Gulf
|
[Open (289)]
|
[Closed (155)]
[list all from site]
MONTH
YEAR
05000416/LER-1982-072, Forwards LER 82-072/01T-0
1982-10-07
0
7 October 1982
Forwards LER 82-072/01T-0
AECM-82-490, Submits Addl Info Re Design & Testing of Automatic Depressurization Sys Air Sys,Including Response to NUREG-0737,Item II.K.3.28,air Sys Testing & Air Sys Makeup Provisions.Revision to FSAR Subsection 18.1.30.12 Encl
1982-10-18
0
18 October 1982
Submits Addl Info Re Design & Testing of Automatic Depressurization Sys Air Sys,Including Response to NUREG-0737,Item II.K.3.28,air Sys Testing & Air Sys Makeup Provisions.Revision to FSAR Subsection 18.1.30.12 Encl
AECM-82-510, Outlines Commitments Made During 821025 Telcon Re Design & Testing of Automatic Depressurization Air Sys.Integrated Leak Test on Sys Will Be Performed Every 18 Months. Justification for Interim Operation Listed
1982-10-26
0
26 October 1982
Outlines Commitments Made During 821025 Telcon Re Design & Testing of Automatic Depressurization Air Sys.Integrated Leak Test on Sys Will Be Performed Every 18 Months. Justification for Interim Operation Listed
AECM-82-528, Forwards Addl Info Re Instrument Air Quality,In Support of NRC Review of Util Response to NUREG-0737,Item II.K.3.28. Proposed Tech Specs & Design Details Will Be Provided 4 Months Prior to Startup Following First Refueling Outage
1982-11-09
0
9 November 1982
Forwards Addl Info Re Instrument Air Quality,In Support of NRC Review of Util Response to NUREG-0737,Item II.K.3.28. Proposed Tech Specs & Design Details Will Be Provided 4 Months Prior to Startup Following First Refueling Outage
ML20070H209
1982-12-20
0
20 December 1982
Discusses Util Responses to Recently Discussed Unresolved NRC Concerns Re Automatic Depressurization Sys Air Sys
AECM-83-0179, Interim Deficiency Rept Re Installation of Noncorrosion Resistant Matl for Instrument Air Pipe Penetrations. Initially Reported on 830315.Design Change Will Be Implemented.Also Reported Per Part 21
1983-03-15
0
15 March 1983
Interim Deficiency Rept Re Installation of Noncorrosion Resistant Matl for Instrument Air Pipe Penetrations. Initially Reported on 830315.Design Change Will Be Implemented.Also Reported Per Part 21
AECM-82-581, Confirms Installation of Mechanical Pressure Gauge on Automatic Depressurization Sys Air Makeup Line & Performance of Associated Surveillance
1983-10-07
0
7 October 1983
Confirms Installation of Mechanical Pressure Gauge on Automatic Depressurization Sys Air Makeup Line & Performance of Associated Surveillance
AECM-83-0672, Provides Addl Info Re Qualification of Automatic Depressurization Sys (ADS) Accumulator & Related Air Sys,In Response to .Ads Leak Test Frequency of 18 Months Anticipated
1983-10-24
0
24 October 1983
Provides Addl Info Re Qualification of Automatic Depressurization Sys (ADS) Accumulator & Related Air Sys,In Response to .Ads Leak Test Frequency of 18 Months Anticipated
AECM-83-0759, Final Part 21 Rept PRD-83/16 for Unit 1 & Interim Part 21 Rept for Unit 2 Re Failure of Internal Coating of Automatic Depressurization Sys,Main Steam Safety Relief Valve & MSIV Accumulators.Final Rept Expected by 840531
1983-11-18
0
18 November 1983
Final Part 21 Rept PRD-83/16 for Unit 1 & Interim Part 21 Rept for Unit 2 Re Failure of Internal Coating of Automatic Depressurization Sys,Main Steam Safety Relief Valve & MSIV Accumulators.Final Rept Expected by 840531
AECM-85-0030, Forwards Addl Info Requested During 841206 Telcon Re Design & Operation of Automatic Depressurization Sys (ADS) Accumulators & Related Air sys.Long-term ADS Pneumatic Supply Makeup Connection Located in Auxiliary Bldg
1985-01-30
0
30 January 1985
Forwards Addl Info Requested During 841206 Telcon Re Design & Operation of Automatic Depressurization Sys (ADS) Accumulators & Related Air sys.Long-term ADS Pneumatic Supply Makeup Connection Located in Auxiliary Bldg
AECM-85-0245, Responds to 850615 Request for Addl Info Re long-term Automatic Depressurization Sys Air Supply Makeup Connection, Per NUREG-0737,Item II.K.3.28.Access to Air Supply Connection Will Be Through Exterior Door 1A316
1985-08-15
0
15 August 1985
Responds to 850615 Request for Addl Info Re long-term Automatic Depressurization Sys Air Supply Makeup Connection, Per NUREG-0737,Item II.K.3.28.Access to Air Supply Connection Will Be Through Exterior Door 1A316
1983-10-24
[table view]
Category
:
TAC
Navigation menu
Personal tools
Create account
Log in
Namespaces
Page
Discussion
English
Views
Read
View form
View source
View history
More
Search
Navigation
Main page
Recent changes
Random page
Community
Help
Patreon
Databases
ENS
LER
Findings
Inspections
TSTF
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
Browse properties